Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹93,280Accepted-Finance 4 9 2 ETTAYAPURAM ROAD NEAR A P C MAHALAKSHMI COLLEGE TUTICORIN 2 | L1 | Accepted-Finance BQR Conditions Satisfied | |
| 2 | L2₹1.0 L+₹10,920 (11.7%)Accepted-Finance | L2 | Accepted-Finance BQR Conditions Satisfied |
Tender Value
Refer Docs
EMD Value
₹1,200
Closing Date
30 Jun 2022, 2:00 pmClosed
SE/O/TTPS
Office of the Superintending Engineer Operation, TTPS, Tuticorin-628 004
TTPS Operation Circle CAD CWPH II Unit V Annual Overhauling of 1200mm butterfly valve gear boxes and air release valves of Cooling water pumps 5A 5B 5C 5D Replacement of wornout Disc seal ring Body seal ring in Butterfly valve of CWP 5A and CWP 5C
2022_EB_236237_1
SE/O/TTPS/Spec.No.101/22-23
Open Tender
Miscellaneous Works
Item Rate
15 days
TTPS
As per BQR Conditions said in NIT
5 documents required · 5 mandatory
₹0
₹1,200
2 Jul 2022
16 Jun 2022
1 Jul 2022
16 Jun 2022
30 Jun 2022
16 Jun 2022
Amount
Charges for overhauling of 1200 mm motor operated Butterfly valve gear boxes of CWP-5A, 5B, 5C &5D by dismantling the assembly, motor cover, drive screw with drive nut assembly, dismantling the drive gear box bottom body from 1200 mm Butterfly valve, removing sleeve and packing rings and fixing special type of clamps on the main shaft of Butterfly valve for making free operation of opening and closing of valve and replacing the worn out parts if any required and opening the man hole door in 1200 mm large dia. Pipes and inspection of the body seal ring for any damages and adjustment of gates for closing, reassembling, test run and commissioning etc., including cost of T&P and consumables.
Charges for complete overhauling of air release valve in the discharge pipe line of CWP-5A, 5B, 5C &5D by dismantling the top cover entire body from discharge line replacement of wornout parts, carrying out rectification works if any on valve seating ring, complete cleaning inside and outside of the valve body, refitting, testing and commissioning etc.,(All spares and fasteners will be supplied by TANGEDCO, T&P consumables welding M/C etc., are in the scope of contractor)
Charges for Dismantling and removing the wornout Disc seal ring / body seal ring in 1200mm Butterfly valve of CWP 5A & 5C disc opening the manhole, disconnecting all the flange connecting bolts & nuts, supporting and lifting the valve from its position and leading to the working area, removing allen bolts SS ring and fixing the new neoprene body seal ring, simple repairing in the valve and erection of 1200mm Butterfly valve in its positioning and connecting all the flange bolts & nuts etc. in discharge line of CWP 5A & 5C including cost of consumables and T&P hire charges etc.
Sangeetha Enterprises
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .