This tender is for construction of Above Ground Fire Water Tank of pumpable Capacity 3900 KL each at
20000044-HD-11100
20000044-HD-11100
Open Tender
Two Bid
Unknown (Unspecified Location)
₹0
₹10 L
29 Oct 2020
7 Oct 2020
29 Oct 2020
29 Oct 2020
8 Oct 2020 - 20 Oct 2020
| Item No | Item Title | Description | Qty | Unit |
|---|---|---|---|---|
| 1 | EXCAVN UPTO&INCL 2M BLW | EXCAVN UPTO&INCL 2M BLW — EXCAVATION UPTO 1.5 M DEPTH: EXCAVATION IN ALL TYPES OF SOIL, FOR FOOTINGS, STEPS, PLINTH BEAMS, EQUIPMENT FOUNDATIONS, PILE CAPS, DRAINS, TRENCHES, MANHOLES, UNDERGROUND TANKS, ETC INCLUDING SHORING STRUTTING AS REQUIRED AS PER SITE CONDITION, DEWATERING WHERE REQUIRED (UNTIL FOUNDATION WORK IS COMPLETE). ITEM ALSO INCLUDES CARTING, STACKING IF REQUIRED BY HPCL EIC, SPREADING, LEVELLING AND COMPACTING/CONSOLIDATING SURPLUS MATERIALS WITHIN PLANT PREMISES AT UNOBJECTIONABLE AREA OR AS PER INSTRUCTION OF HPCL EIC. | - | Cubic Meters |
| 2 | EXCAVN ABV2M&UPTO3M | EXCAVN ABV2M&UPTO3M — EXCAVATION FROM 1.5 TO 3.0 M DEPTH EXCAVATION IN ALL TYPES OF SAND, FOR FOOTINGS, STEPS, PLINTH BEAMS, EQUIPMENT FOUNDATIONS, PILE CAPS, DRAINS, TRENCHES, MANHOLES, UNDERGROUND TANKS, ETC INCLUDING SHORING STRUTTING AS REQUIRED AS PER SITE CONDITION, DEWATERING WHERE REQUIRED (UNTIL FOUNDATION WORK IS COMPLETE). ITEM ALSO INCLUDES CARTING, STACKING IF REQUIRED BY HPCL ENGINEER IN CHARGE, SPREADING, LEVELLING AND COMPACTING/CONSOLIDATING SURPLUS MATERIALS WITH ANY LEAD WITHIN PLANT PREMISES AT UNOBJECTIONABLE AREA OR AS PER INSTRUCTION OF HPCL EIC. | - | Cubic Meters |
| 3 | BACKFILLING WITH SERV | BACKFILLING WITH SERV — BACKFILLING: BACKFILLING AROUND SUB-STRUCTURE/FOUNDATION ETC. WITH SERVICEABLE AND REUSABLE SOILS AVAILABLE FROM EXCAVATION AND STACKED EARLIER WITHIN THE PLANT BOUNDARY AT UNOBJECTIONABLE AREA INCLUDING RE-EXCAVATING, SHIFTING AND TRANSPORTATION TO THE SITE OF BACKFILLING, BACKFILLING IN LAYERS OF 200 MM WITH MECHANICAL COMPACTOR; WATERING; COMPACTING; TESTING TO ACHIEVE 95% MDD AS PER LAB RESULTS AND GRADING/LEVELLING TO ACHIEVE DESIRED LEVELS AS PER HPCL IN CHARGE ALL COMPLETE AS PER INSTRUCTIONS OF EIC. COMPLETE AS PER INSTRUCTION OF HPCL EIC/OWNER WITH EXCAVATED EARTH FROM WITHIN PLANT PREMISES. | - | Cubic Meters |
| 4 | Supply , Lay & Compt of Murram | Supply , Lay & Compt of Murram — SUPPLYING & PROVIDING APPROVED QUALITY MURRUM OF PI NOT GREATER THAN 15 AND LABORATORY MDD NOT LOWER THAN 1.7 G/CC FOR FILLING AS PER TENDER SPECIFICATION FOR BACK FILLING, SUB-GRADE & PLINTH FILLING, AROUND THE FOUNDATION, ETC AS APPLICABLE INCLUDING COST OF SUPPLY OF MURRUM FROM BORROW PITS OUTSIDE HPCL PLANT; TESTING, SPREADING IN LAYERS OF 200 MM THICK, WATERING AND COMPACTING WITH PLATE VIBRATOR/HAND COMPACTOR AS DECIDED BY THE SITE-IN-CHARGE TILL MIN. 95%MDD OF LAB STANDARD PROCTOR TEST IS ACHIEVED; TESTING; COMPLYING ALL THE REQUIREMENT OF MINING DEPT/APPLICABLE DEPT OF UT OF D&NH; ROW PAYMENTS; TRANSPORTATION TO SITE FOR ALL APPLICABLE LEADS & LIFTS COMPLETE IN ALL RESPECT AS PER TENDER SPECIFICATION/SCOPE OF WORK ETC, AS DIRECTED BY HPCL EIC. QUOTED RATES ARE DEEMED TO INCLUDE DRESSING UP THE SURFACE, BREAKING CLODS, REMOVAL OF SLUSH AND WATER, REMOVAL OF SURPLUS EARTH AFTER FORMATION, WATERING RE-HANDLING AT SITE AND CONDUCTING INITIAL LABORATORY TESTS ON SAMPLES AND CONSEQUENT INSTITUTE DRY DENSITY/OMC TESTS AT 500 SQM OF AREA AFTER EACH LAYER OF FILLING. THE INITIAL FILLING SHOULD START ONLY AFTER STRIPPING THE AREA FROM BUSHES, GRASS AND OTHER VEGETATION. NO SEPARATE PAYMENT WILL BE MADE FOR CLEARING BUSHES, VEGETATION AND OTHER MATERIALS. JOB TO BE COMPLETED AS PER ATTACHED TECHNICAL SPECIFICATION AND AS DIRECTED BY HPCL EIC COMPLETE.CONTAINING NOT MORE THAN 20% COHESIVE FINES NAMELY CLAY, 20MM AND DOWN SIZE GRADING | - | Cubic Meters |
| 5 | Supply,Lay & Compt Mach Sand | Supply,Lay & Compt Mach Sand — GROUND IMPROVEMENT STONE AND SAND LAYER-SUPPLYING AND LAYING OF WSEL (WEDGE SHEAR ELEMENTARY LAYER) CONSIST OF METAL STONES/WELL BURNT BRICKS OF SIZE 80MM TO 300MM LAID IN LOOSE LAYERS OF 500MM WITH LOCALLY AVAILABLE SILVER SAND FILLED IN VOIDS (SAND SHALL BE AS PER ZONE-III OR IV AS PER IS:383 CLASSIFICATION) IN FOUNDATION TILL 2M DEPTH FROM FGL AND COMPACTING WITH 10 MT VIBRO-RAMMER OR ROLLER AFTER WATERING TO ACHIEVE THE DESIRED COMPACTION INCLUDING THE COST OF ALL LABOUR, MATERIAL, EQUIPMENT, LEAD, LIFT ETC., ALL COMPLETE AS PER TECHNICAL SPECIFICATIONS AND AS DIRECTED BY THE ENGINEER-IN-CHARGE | - | Cubic Meters |
| 6 | PROV&LAYING 75mm ANTI | PROV&LAYING 75mm ANTI — PROVIDING AND LAYING 75 MM THICK (COMPACTED THICKNESS) THICK ANTI- CORROSIVE LAYER UNDER STEEL STORAGE TANKS ON THE TOP OF PILE CAP THE RATE TO INCLUDE THE FOLLOWING:(I) CLEANING OF PILE CAP(II) PROVIDING AND LAYING 75 MM THICK ANTI- CORROSIVE LAYER UNDER STEEL STORAGE TANKS USING SAND MIXED WITH 80/100 GRADE BITUMEN(8 TO10% BY VOLUME) INCLUDING ALL MATERIALS, TRANSPORTATION, MIXING, LAYING, TAMPING, FINISHING INCLUDING ALL LABOUR, ETC COMPLETE AS PER DRAWINGS, SPECIFICATIONS AND DIRECTIONS OF HPCL ENGINEER IN-CHARGE.(III) PROVIDING TACK COAT AS PER ATTACHED TECHNICAL SPECIFICATIONS PRIOR TO LAYING OF PREMIX BITUMEN CARPET.(IV) SPREADING OF THE PREMIX CARPET WITH PAVER.(V) CHECKING THE CAMBER/ GRADIENT WITH CAMBER/ GRADIENT BOARDS.(VI) ROLLING OF THE ABOVE LAYER WITH 2 METER ROLLERS. THE ENTIRE BITUMEN QUANTITY REQUIRED FOR THE JOB SHALL BE DIRECTLY PROCURED FROM PETROLEUM OIL COMPANIES ONLY. NOTE: HEATING OF BITUMEN FOR PREMIXING WILL NOT BE ALLOWED INSIDE THE TERMINAL. HEATING TO BE DONE OUTSIDE AND TRANSPORTED TO SITE. | - | Square Meters |
| 7 | Supp,& Providing PCC (1:4:8) | Supp,& Providing PCC (1:4:8) — PROVIDING AND LAYING PLAIN CEMENT CONCRETE OF FOLLOWING GRADE WITH 20MM AND DOWN SIZE GRADED AGGREGATES FOR BED BLOCK FOR BRICK WALLS, FOUNDATIONS, FLOORS, APRONS, PITS, DRAINS& ANY OTHER CONCRETING WORK AS PER HPCL REQUIREMENT INCLUDING ANY REQUIRED SHUTTERING, MACHINE MIXING, TAMPING, RAMMING, CURING, ETC ALL COMPLETE AT ALL LEVELS AS PER SPECIFICATIONS, DRAWINGS, JOB PROCEDURES ETC AND INSTRUCTIONS OF HPCL ENGINEER-IN-CHARGE. PCC 1:4:8 | - | Cubic Meters |
| 8 | Supply & Laying Soiling Stone | Supply & Laying Soiling Stone — PROVIDING AND LAYING 150 MM TO 230 MM THICK (COMPACTED) TRAP/RUBBLE STONE SOLING INCLUDING HAND PACKING, FILLING THE INTERSTICES WITH CHIPS, SPALLS, SAND, WATERING, COMPACTING BY MECHANICAL MEANS ALL COMPLETE AS PER DIRECTION OF ENGINEER-IN- CHARGE. | - | Cubic Meters |
| 9 | Supp & Providing RCC (1:1:5:3) | Supp & Providing RCC (1:1:5:3) — SUPPLYING AND PROVIDING OF APPROVED DESIGN MIX, REINFORCED CEMENT CONCRETE OF (MODERATE) M-25 (EXCLUDING SHUTTERING AND REINFORCEMENT) WITH 20 MM AND DOWN SIZE STONE AGGREGATES AT SPECIFIED DEPTHS AND HEIGHTS INCLUDING CURING AND TESTING IN ALL TYPES OF FOUNDATIONS, FOOTINGS, EQUIPMENT FOUNDATIONS, COLUMNS, PEDESTALS, WALL, LINTELS, PLINTH BEAMS, BRACKETS, PARAPETS, BANDS AND ANY OTHER WORKS ALL COMPLETE AS PER DRAWINGS, SPECIFICATION AND INSTRUCTION OF ENGINEER. RATE ALSO TO INCLUDE NECESSARY POLYTHENE SHEETS OF APPROVED QUALITY TO BE PLACED BEFORE LAYING THE CONCRETE IN CASE OF RCC DRIVEWAYS, FLOORS AND WHEREVER REQUIRED AND DIRECTED BY HPCL EIC. FOR DESIGN MIX, MODERATE EXPOSURE SHALL BE CONSIDERED AND WATER CEMENT RATIO SHALL BE LIMITED TO 0.5. DESIGN MIX SHALL BE AS PER IS:456-2000 AND IS: 10262 AND SAME SHALL BE CARRIED OUT BY A LAB/AGENCY/INSTITUTION APPROVED BY HPCL. RMC WILL BE PERMITTED BASED ON PRIOR INSPECTION BY HPCL. MINIMUM CEMENT CONTENT SHALL BE 300 KG/M3 FOR M-25 . CEMENT WOULD BE ORDINARY PORTLAND CEMENT. ABOVE THE GROUND FROM 10 M AND ABOVE | - | Cubic Meters |
| 10 | Supply&Laying 125 Micron Sheet 12204-JIND LPG | Supply&Laying 125 Micron Sheet 12204-JIND LPG — SUPPLY AND LAYING HIGH DENSITY POLY ETHYLENE SHEET/125 MICRON: SUPPLYING AND LAYING 125 MICRON THICK HDPE SHEET OF APPROVED QUALITY AS PER IS CODE WITH APPROPRIATE LAP ON JOINTS, FIXING OF HDPE SHEET BELOW PAVER BLOCK AND JOINTING WITH SEALING MACHINE/ADHESIVE COMPLETE AS PER DRAWING AND MANUFACTURER’S SPECIFICATION AND DIRECTION OF THE ENGINEER INCHARGE. 1. MINIMUM OVERLAP OF HDPE SHEET SHOULD BE 150 MM AND ONLY FINISHED AREA WILL BE PAID AND OVER LAPS SHALL NOT BE MEASURED. 2. THE VENDOR SHALL ENSURE THE ADHESION WITH ALL ADJOINING STRUCTURES AS PER THE MANUFACTURER'S RECOMMENDATIONS SO AS TO ENSURE THE LEAK PROOFNESS OF THE COVERED AREA. | - | Square Meters |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
20000044-HD-11100.pdf
TENDER_DOCUMENT • 18.12 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .