Loading…
Loading…
Tender Value
₹3.5 L
EMD Value
₹7,004
Closing Date
13 Jul 2026, 6:00 pm4d left
DFO Awantipora Forest Division Awantipora
Forest Divisional Awantipora DFO
Construction of Water Harvesting Structure under CAMPA NPV at Kulnar Lethpora Range Pampore Forest Division Awantipora
2026_FD_314155_5
eNit 03 of 2026 Dated 29.06.2026
Open Tender
Agricultural or Forestry
Forest Division Awantipora
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
Centralized Designated Pooling JK Bank Account
₹7,004
2 Jul 2026
2 Jul 2026
14 Jul 2026
2 Jul 2026
13 Jul 2026
2 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Each work in excavation by mechanical means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 min width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, inlcuding getting out excavated earth and disposal of surplus excavated earth as directed (in all kinds of soils) | 50.02 | Cum | 265.73 | ₹13,291.81 |
| 2 | Providing and laying solling of specified size duely hand packed incl. all carraiges and loading/unloading | 6.17 | Cum | 900 | ₹5,553 |
| 3 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level in 1:4:8 mix.i/c carraiges | 4.07 | Cum | 5,382.87 | ₹21,908.28 |
| 4 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level in 1:1.5:3 mix.i/c carraiges | 8.14 | Cum | 8,057.8 | ₹65,590.49 |
| 5 | Reinforced cement concrete work in walls (any thickness) including attached pilasters buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts upto floor five level including curing but excluding cost of centering shuttering, finishing and reinforcement | 4.59 | Cums | 9,720.7 | ₹44,618.01 |
| 6 | Centering and Shuttering including strutting, propping etc. and removal of form for 5.9.1 Foundations, footing bases of column etc. for mass concrete | 7.6 | Sqm | 296.25 | ₹2,251.5 |
| 7 | Retaining walls, return walls, walls (any thickness) including attached pilasters buttresses, plinth and string course fillets, kerbs and steps etc. | 46.09 | Sqm | 650.71 | ₹29,991.22 |
| 8 | Reinforcement for RCC work i/c straightening, cutting, bending, placing in position binding all complete mild steel and medium tensils steel bars | 1,273 | KG | 127.46 | ₹1,62,256.58 |
| 9 | Carraige of different key materials for an Avg. lead of 5 Kms. | 22.68 | Cum | 207.68 | ₹4,710.18 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.55 MB
BOQ_1017209.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid