Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.5 LAccepted-AOC NAGLA SADAK HATHRAS | HATHRAS | HATHRAS | UTTAR PRADESH | L1 | Accepted-AOC Accept | |
| 2 | L2₹1.5 L+₹5,658.80 (3.80%)Rejected-AOC 1 BAMANAI LUHETA HATHRAS HATHRAS UTTAR PRADESH 204101 | HATHRAS | UTTAR PRADESH | 204101 | L2 | Rejected-AOC Accept | |
| 3 | L3₹1.7 L+₹16,130.80 (10.8%)Rejected-AOC 01 NAUJARPUR BASAI KAJI SASNI HATHRAS UTTAR PRADESH 202150 | ALIGARH | UTTAR PRADESH | 202150 | L3 | Rejected-AOC Accept |
Tender Value
₹2 L
EMD Value
₹2,000
Closing Date
20 Aug 2021, 12:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SE EDC Hathras
SE EDC Hathras
Full Deposit Work EDD III
2021_DVVNL_607693_1
EDCH-47/2021-22
Open Tender
Documentary film,Video film
Item Rate
120 days
SE EDC Hathras
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,180
DVVNL
₹2,000
9 Feb 2022
3 Aug 2021
20 Aug 2021
3 Aug 2021
20 Aug 2021
3 Aug 2021
30 days
Amount
Safe Carriage of following material from Electricty store center Hts to Pit site of work through the Kacha and Pakka road including loading and unloading at the respective ends including the cost of arrangement of labour, T&P, etc. which required for proper completion of work.(Distance 00-50 Kms.)
8.5/9 Mtr. PCC. Poles
11 KV X-Arms, weasal conductor, G.I wire,Disc Insulators, Pin insulators, clamps Abc Bunch and other required line material, if any.
Safe Carriage of following from Electricty Store center Hathras to Pit Site of Work through the Kacha and Pakka road loading and unloading at the respective ends including the cost of arrangement of labour, T&P, etc. which required for proper completion of work.(Distance 00-70 Kms.)
16 KVA T/F
Grouting of PCC Pole (wherever required) with cement, sand and brick ballast/stone ballast in ration 1:4:8 including the cost of arrangement of cement, sand, brick ballast/stone ballast, stone pad etc. As per actual site requirement.
Errection of following Poles including Cutting of kharanja/mettalic road/concrete portion while digging pit & complete H.T./L.T. fittings as per RESPO manual and as per direction of Engineer Incharge including the cost of labour, T&P and carrier etc. required for proper completion of work.
8.5/9 Mtr. PCC. Poles
Double pole complet fitting
Errection and grouting of stays Complete as per RESPO Norms and as per direction of supervising engineer. Grouting material i.e. cement, sand, brick ballast/stone ballast etc. shall be arranged by the contractor at his own cost.
Fixing of earthing rod as per RESPO Norms and as per direction of supervising engineer.
Laying, sagging and stringing and jumpering / binding etc. of new & old ACSR Weasal conductor / GI in 11 KV / LT lines as per RESPO manual and as per direction of supervising engineer.
ACSR Weasal conductor
L.T Cable
Providing & Fixing of Following Clamps
11 KV X Arms Clamps for STP/PCC Pole
11 KV DP Clamps for STP/PCC Pole
11 KV F Clamp/Pin Insulator for STP/PCC Pole
11 KV Disk Insulator
Distribution Box
Cutting, chopping, triming of tree branches to clear the line route to give 2 mtr. horizontal and vertical clearance to the line coming in the route of different feeders as per direction of supervising engineer
Installation of following T/F on newly constructed double pole in proper alignment direction & making HT/LT connection.
16 KVA T/F
Guarding of 11 KV line by laying, stringing, sagging and binding of 2 Nos. parallel GI wire 6 SWG after providing, fabrication and fixing of guarding angle and fabrication and fixing of X-guards (Tillis) of GI wire at distance of 3 Mtr.
Fixing of DLMS Meter
Installation of extra ''T'' on the erected poles wherever required alongwith all fitting as per direction of supervising engineer including the cost of labour, T&P etc, required for proper completion of work. The "T" pole shall be grouted with cement, sand and brick ballast/stone ballast in ratio 1:4:8 including the cost of material.
Bobby Electricals
VINAYAK ELECTRICALS
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .