Tender Value
₹45.8 L
EMD Value
₹91,540
Closing Date
30 Jul 2026, 4:00 pm4d left
EE Mahore
Mahore
BOQ
2026_PWDJK_316254_2
fresh ENIT NO 20
Open Tender
Civil Works
Percentage
540 days
Mahore
NIT
2 documents required · 2 mandatory
₹600
eepwd
₹91,540
16 Jul 2026
16 Jul 2026
31 Jul 2026
16 Jul 2026
30 Jul 2026
16 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in bulk excavation by manual means (hydraulic excavator) over areas(exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. | 192.68 | cum | 592.9 | ₹1,14,239.97 |
| 2 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m
in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and
ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as
directed: 1 meter from cutting edge.All kinds of soil : | 107.93 | cum | 479.3 | ₹51,730.85 |
| 3 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size) | 21.47 | cum | 4,826.5 | ₹1,03,624.96 |
| 4 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) | 83.5 | cum | 5,733.6 | ₹4,78,755.6 |
| 5 | Centering and shuttering including strutting, propping etc. and removal of form work for: Retaining walls, return walls, walls (any thickness) including attached pilasters buttresses, plinth and string course fillets, kerbs and steps etc. | 18.59 | Sqm | 628.95 | ₹11,692.18 |
| 6 | Brick work with common burnt clay (non-modular) bricks of class designation 7.5 in foundation and plinth including curing in : Cement mortar 1:6 ( 1 cement : 6 coarse sand) | 43.3 | cum | 7,571.55 | ₹3,27,848.12 |
| 7 | Extra for brick work in super structure above plinth level upto floor V level by manual means. | 43.3 | cum | 1,455.65 | ₹63,029.65 |
| 8 | Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level: 1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | 3.72 | cum | 7,788.4 | ₹28,972.85 |
| 9 | Reinforced cement concrete work in walls (any thickness) including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts upto floor five level including curing but excluding cost of centering shuttering, finishing and reinforcement. 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | 10.35 | cum | 9,395.7 | ₹97,245.5 |
| 10 | Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15°, landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases upto five level including curing but excluding the cost of centring, shuttering, finishing and reinforcement with 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | 24.06 | cum | 9,821.85 | ₹2,36,313.71 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.46 MB
BOQ_1030342.xls
BOQ • 0.36 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].