| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.2 LAccepted-Finance | L1 | Accepted-Finance Quoting Lowest Rate | |
| 2 | L2₹5.5 L+₹22,540 (4.31%)Rejected-Finance | L2 | Rejected-Finance Quoting Higher rate | |
| 3 | L3₹5.8 L+₹57,060 (10.9%)Rejected-Finance | L3 | Rejected-Finance Quoting Higher rate |
Tender Value
Refer Docs
EMD Value
₹10,480
Closing Date
4 Dec 2023, 3:00 pmClosed
Superintendent Engineer
Office of the Superintending Engineer, Western Electrical Circle , PWD, Purta Bhavan, 1st floor, Burdwan-713103
Annual Comprehensive Maintenance of UPS Systems of Various rating Installed at different Critical Care Units of BMC and H Purba Bardhaman. Electrical Work AMC of 1No 15KVA 2nos 30 kva, UPS incl. S and F of 48 nos batteries Project ID HF232407685S00
2023_WBPWD_606780_1
WBPWD/SEWEC /BED /NIQ-132 /2023-24
Open Tender
ELECTRICAL WORKS ORG
Item Rate
365 days
Purba Bardhaman
Please refer Tender documents.
5 documents required · 5 mandatory
₹10,480
Office of the Superintending Engineer, Western Ele
11 Dec 2023
22 Nov 2023
6 Dec 2023
22 Nov 2023
4 Dec 2023
24 Nov 2023
23 Nov 2023 - 24 Nov 2023
24 Nov 2023
Amount
Preventive checking, overhauling & necessary repairing as preventive measure of online UPS sets with spare parts & DC Battery Sets as per sample with agency's own tools & tackles for 12 Months.This includes periodic preventive maintenance once in every Two Months, During preventive maintenance the system will be cleaned (including cleaning of Battery Terminals) in every Twor Months,Breakdown calls should be attended with in 24 hours in working days as well as holidays, Cost of all spares which are required for replace during preventive maintenance and break down can't be separately charged .The rate considered including all tax & duties.
30 KVA 3-Ph input & 3-Ph Output On Line UPS System Comprehensive Maintenance (Make: AVO).
15 KVA 3-Ph input & 3-Ph. Output On Line UPS System Comprehensive Maintenance (Make: AVO).
Charges for repairing work of faulty 3 Ph. In/ 1 Ph. Out 10 KVA On-Line UPS Machine at SNCU including spares and service charge (Make: AVO).
Charges for repairing work of faulty 1 Ph. In/ 1 Ph. Out 6 KVA On-Line UPS Machine at PICU including spares and service charge (Make: AVO/APC).
SITC of SMF 12V, 42 AH Battery with Interlink cable, lugs etc.on existing Battery rack incl. modification of the rack if required as per direction of EIC. , Battery Warranty 24 Months, Battery Type SMF, (Make- Exide/ Amar Raja )
Transportation cost for the above mentioned UPS machine and Battery.
Terms and Conditions & Scope of Work :
1. The authorized service personnel will visit the installation sites for periodic preventive maintenance check up (once in a month) to the UPS systems except line interactive UPS system.
2. During the preventive maintenance checkups, the system shall be cleaned and general performance will be checked.
3. Cost of all spares that are replaced in the UPS system (only except replacement of battery if required) shall be covered under this comprehensive Annual Maintenance Scheme. Checking of battery terminals and taking corrective action for the same if needed to be done. Supply and application of material to keep terminals moisture proof to be used by the agency regularly. The connection wires if became faulty have to be replaced by the agency.
4. The agency must have office and telephonic contact point (both land & mobile) based at Purba Bardhaman.
5. The agency shall have to check Water Level of the Battery, Specific Gravity of the Electrolyte of the Battery, Condition of Battery Chargers, etc. as directed by the E. I C., fortnightly and findings thereof should be recorded in Log Book if applicable. In case of SMF battery their conditions have to be checked as per OEM recommendation and to be noted at Log Book regularly.
6. Failing to comply any of the above mentioned items will result to deduction of cost from the raised bill as will be determined by the accepting authority.
7. In case of any accident and/ or physical illness of anybody while on duty, no claim will be entertained by this Department and all responsibilities thereof should be shouldered by the agency.
8. Spare standby machine of same capacity should provide in case of breakdown.
9. The Executive Engineer, P.W. Dte., Bardhaman Electrical Division reserves the right to terminate the contract with one month notice to the agency for non satisfactory performance, violation of Terms & Conditions or other administrative reasons. However, this clause will be superseded by Clause II, if required.
10. In case of major maintenance or any other reasons the UPS remains non operational for a stretch 15 days or higher, payment will not be made for that non operational period.
11. The Bill for the work should be submitted along with photocopy of Log Book on monthly/ quarterly basis to the concerned JE. The payment will be made on receipt of the bill, certified for satisfactory performance by the JE and AE concerned, subject to availability of fund and maintaining existing PWD norms & rules.
12. Apart from the periodic preventive maintenance visit, all breakdown calls on the systems covered under AMC as and when required.
13. Exclusions: The following services are not included in this Scheme, but could be done on payment basis: a) Missing/ stolen parts in the UPS and DC backup b) Shifting of UPS and accessories. c) Extra accessories required for the use of the UPS. d) Cost of supply of battery if needed. e) Less cost for old Battery ,12 V,65 AH Old Battery 32 Nos. @ Rs. 650 = Rs 20,800.00
14. Termination: The contract can be terminated by either side contract by giving a 1 (one) month notice in writing to the other party.
Hipotronics Engineers
IRP Enterprise
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .