| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.5 CrAccepted-AOC | ₹1.5 Cr | L1 | Accepted-AOC L1 accepted |
| 2 | L2₹1.5 Cr+₹1.6 L (1.07%)Rejected-AOC RAMASAMUDRAM VILLAGE AND POST PALLIPATTU TALUK TIRUVALLUR DISTRICT 631206 | PALLIPATTU | TIRUVALLUR | TAMIL NADU | 631206 | ₹1.5 Cr+₹1.6 L (1.07%) | L2 | Rejected-AOC L2 rejected |
| Sl No | Description | Qty | Unit | RMV Giri L2 | M/S. SRI THANIGAI MURUGAN CONSTRUCTION L1 |
|---|---|---|---|---|---|
| 1.001.Strengthening of BT Road @ Ponpadi Mettu Colony Road KM 0/0-2/480 (R-72) In Thiruvalangadu Block | |||||
| 2.00 | Clearing the Scrub jungle removing from away site including incidential charges and all labour charges with burning and ashes including all labour charges etc,..complete. | 2,181.6 | m2 | 10 ₹21,816 | 6.3 ₹13,744.08 Lowest |
| 3.00 | Picking the Worn-out BT Surface including incidential charges and cleaning of all labour charges and machinery charges etc,..complete | 1,265 | m2 | 25 ₹31,625 | 23.3 ₹29,474.5 Lowest |
| 4.00Collection and supply of carted earth from approved quarry an average lead 1km including cost and conveyance of all materials to site and labour charges etc. as per Technical Specification Clause 303.1.(Subgrade using Carted Earth) | |||||
| 5.00 | KM 0/0-2/480 | 2,132.15 | m3 | 150 ₹3,19,822.5 | 147 ₹3,13,426.05 Lowest |
| 6.00Collection and supply of gritty gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for spreading and compaction with power roller etc.complete, for SHOULDERS | |||||
| 7.00 | KM 0/0-1/0 | 337.5 | m3 | 1,060 ₹3,57,750 | 1,055.5 ₹3,56,231.25 Lowest |
| 8.00 | KM 1/0-2/0 | 335.54 | m3 | 1,070 ₹3,59,027.8 | 1,065.1 ₹3,57,383.65 Lowest |
| 9.00 | KM 2/0-3/0 | 161.02 | m3 | 1,080 ₹1,73,901.6 | 1,074.5 ₹1,73,015.99 Lowest |
| 10.00Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete. | |||||
Tender Value
₹1.5 Cr
EMD Value
₹1.5 L
Closing Date
3 Sept 2025, 3:00 pmClosed
Project Director/Joint Director
DRDA Tiruvallur
Strengthening of BT Road at Ponpadi Mettu Colony Road KM 0/0-2/480 (R-72) In Thiruvalangadu Block under MGSMT PH III 2025-26 Pac.20
2025_RDTN_594414_1
DIPR/4437/Tender/2025
Open Tender
Civil Works - Roads
Item Rate
180 days
Tiruvalangadu Block
Refer tender document
5 documents required · 5 mandatory
₹0
₹1.5 L
Yes
DRDA Tiruvallur
30 Oct 2025
18 Aug 2025
3 Sept 2025
18 Aug 2025
3 Sept 2025
22 Aug 2025
22 Aug 2025
Amount
1.Strengthening of BT Road @ Ponpadi Mettu Colony Road KM 0/0-2/480 (R-72) In Thiruvalangadu Block
Clearing the Scrub jungle removing from away site including incidential charges and all labour charges with burning and ashes including all labour charges etc,..complete.
Picking the Worn-out BT Surface including incidential charges and cleaning of all labour charges and machinery charges etc,..complete
Collection and supply of carted earth from approved quarry an average lead 1km including cost and conveyance of all materials to site and labour charges etc. as per Technical Specification Clause 303.1.(Subgrade using Carted Earth)
Collection and supply of gritty gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for spreading and compaction with power roller etc.complete, for SHOULDERS
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation.
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for Levelling course
Cement concrete 1:3:6 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for Levelling course
Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Applying PRIMECOAT over WMB/ WMM surface at 7.00Kg of SS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc., Complete
Applying TACK COAT over Primed WMM surface at 3 Kg of RS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. complete
Applying TACK COAT over Primed WMM surface at 2.5Kg of RS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. complete
Providing and laying 50mm Compacted thick Bituminous macadam using 26.50-11.2mm graded metal and 0.10 cum of 13.20-2.36mm grade metal with 37.00 kgs of VG30/VG40 for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 50mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5
Providing and laying Bituminious concrete to 25mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.30kgs of VG30/VG40 an heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher, vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5
Providing and fixing Sign board
Road Marker /Road stud with lens Reflector
Reinforced cement concrete M15 grade kilometre stone/local stone of standard design as per IRC:8 fixing in position including painting and printing, etc as per drawing and Technical Specification Clause 1703
(i) Ordinary Kilometer Stone (Precast)
(ii) 200 m stone (precast)
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
RMV Giri (BID ID -1446520)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .