| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹17.1 LAccepted-AOC TAMIL NADU | THIRUVALLUR | TAMIL NADU | 600019 | L1 | Accepted-AOC AOC | |
| 2 | L2₹17.2 L+₹6,222.85 (0.36%)Rejected-Finance | L2 | Rejected-Finance L2 |
| Sl No | Description | Qty | Unit | S PALANISAMY L1 | R IYAPPAN L2 |
|---|---|---|---|---|---|
| 1.00 | Earth work excavation and depositing on bank with initial lead and lift in hard gravelly soil, hard stiff clay, black cotton soil, hard red earth,shales, murram, and earth muds with 50% fair sized boulders as per SS 20B for narrow foundation.(For column, Al round wall, Cross wall, D/F For column, Septic tank, Ramp Side wall, Steps) | 48.79 | cum | 263.5 ₹12,856.17 Lowest | 265 ₹12,929.35 |
| 2.00 | Filling with river M-Sand including cost and coveyance of all materials to work site and all labour charges etc. (For column, Main wall all round, cross wall, D/F For column, Kitchen, Store, Hall, Toilet, D/F W/C, Septic tank, Ramp Side wall, Ramp inner, Steps) | 11.05 | cum | 2,311.7 ₹25,544.29 Lowest | 2,315 ₹25,580.75 |
| 3.00 | Cement Concrete 1:4:8 mix using 40mm metal including cost and conveyanceof all materials to work site and all labour charges etc.(For column, Main wall al round, Cross wall, D/F For column, Kitchen, Store, Hall, Toilet, D/F W/C, Septic tank, Ramp Side wall, Steps, Ramp inner,) | 11.05 | cum | 6,131.7 ₹67,755.29 Lowest | 6,131.81 ₹67,756.5 |
| 4.00 | Refilling in foundation and basement with excavated earth in layer of not more than 15cm thick (For column, D/F SF, D/F PCC, D/F RCC, D/F Coping, D/F Column, For column, EW for Grade Beam, D/F SF, D/F PCC, Kitchen, Store, Basement Hall, Toilet, D/F W/C, Ramp inner) | 42.39 | cum | 45.8 ₹1,941.46 Lowest | 50 ₹2,119.5 |
| 5.00 | Brick work in cement mortar 1:5 mix using country bricks including cost and conveyance of all materials to site and all labour charges etc complete Upto basement (Main wall al round, Cross wall, Toilet, Kitchen, D/F For Toilet Door Open, D/F For Column, Ramp Side wall, STEP 1, STEP 2, STEP 3, STEP 4, Septic tank wall, Baffle wall) | 10.75 | cum | 6,298.5 ₹67,708.88 Lowest | 6,298.76 ₹67,711.67 |
| 6.00 | Brick work in C.M 1:5 mix using country bricks incuding cost and conveyance and all labour charges etc. Above basement (Main wall alround, Cross wall, Toilet, Kitchen, D/F For column, D/F Door D2, D/F Door D2, D/F Door D, D/F Door D1, D/F Window W1 & Wall, D/F Window W1, D/F Window W, D/F Ventilator V, D/F Exhaust fan, Toilet Front, Window W1 & Wall, Window W1, Window W, Main wall alround 3 side, Cross wall above hall, Kitchen
D/F For column, Main wall alround 3sides, Cross wall above hall, Kitchen, Parapet, Parapet over toilet, Cuboard side wall in kitchen, Cuboard bottom wall in kitchen, Cooking platform wall, Cuboard side wall in hall, Cuboard bottom wall in hall, cross wall at baby friendly toilet
) | 25.96 | cum | 6,391.63 ₹1,65,926.71 Lowest | 6,391.63 ₹1,65,926.71 Lowest |
| 7.00 | RCC 1:1.5:3 mix using 20mm metal including cost and conveyance and all labour charges etc.Upto Basement (For column mat, For column coping, For column up to grade beam, Grade beam allround, Cross wall, cross wall, Cross wall, For column up to Basement, Septic tank slab) | 10.49 | cum | 9,871.31 ₹1,03,550.04 Lowest | 9,871.31 ₹1,03,550.04 Lowest |
| 8.00 | RCC 1:1.5:3 mix using 20mm metal including cost and conveyance and all labour charges etc.For Above basement (For column up to lintel, Sill Slab Sides W1, Sill Slab Sides W1, Sill Slab Sides W, Sill Slab Sides W, Lintel over D2 of Toilet, Lintel alround, Cross Wall, lintel toilet Cross Wall, Kitchen cross Wall, Sunshade in front, Rear Window Sunshade, Side Window Sunshade, Toilet Roof, Toilet Roof, For column lintel to roof level, For column lintel to roof level (T beam), Roof beam Alround Hall, T beam at hall, cross beam b/w hall and kitchen, cross beam b/w store and kitchen, Columns, Roof slab) | 13.21 | cum | 10,012.38 ₹1,32,263.54 Lowest | 10,012.38 ₹1,32,263.54 Lowest |
| 9.00 | Supplying and errecting for sides & soffits including supports and strutting upto 3.29m height for plane surface in all floors including cost and conveyance and all labour charges etc.(For column up to grade beam, Grade beam , Store, Kitchen, Hall, Toilet, baby friendly toilet, Column Upto Basement, Septic Tank bottom, Septic Tank sides ) | 51.2 | sqm | 547.5 ₹28,032 Lowest | 550 ₹28,160 |
| 10.00 | Supplying and errecting for sides & soffits including supports and strutting upto 3.29m height for plane surface in all floors including cost and conveyance and all labour charges etc.(For Column up to Lintel level, Sill Slab Sides W1, Sill Slab Sides W1, Sill Slab Sides W, Sill Slab Sides W, Sides, Lintel over D2 of Toilet, Lintel over D2 of Toilet,
lintel alround Hall, baby friendly toilet, Toilet, Kitchen, Store, Outer alround, Door Bottom D2, Door Bottom D1, Door Bottom D, Window bottom W & W1, Ventilator V bottom, Rear Sunshade, Kitchen Sunshade, Frount sunshade, sunshade sides face, Disabled Toilet roof slab bottom, B.F Toilet roof slab bottom, For column lintel to roof level, For column lintel to roof level T-beam, T-beam at hall,
Hall Beam alround, D/f Column, Kitchen Beam alround, Store alround, Roof bottom, Kitchen bottom, Store, Column Sides, Roof slab Sides
) | 133.25 | sqm | 1,095 ₹1,45,908.75 Lowest | 1,095 ₹1,45,908.75 Lowest |
Tender Value
₹17.3 L
EMD Value
₹17,250
Closing Date
20 Jan 2026, 6:50 pmClosed
Block Development Officer(B.P), Kumaratchi
Block Development Officer(B.P), Kumaratchi
Construction of Anganwadi Building at Pillaiyarthangal in Edayar Panchayat, Kumaratchi PU under PMAGY 2025-26
2026_RDTN_640898_1
PMAGY2026
Open Tender
Civil Works
Works
90 days
PU-Kumaratchi
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹17,250
Yes
10 Mar 2026
9 Jan 2026
20 Jan 2026
9 Jan 2026
20 Jan 2026
9 Jan 2026
Earth work excavation and depositing on bank with initial lead and lift in hard gravelly soil, hard stiff clay, black cotton soil, hard red earth,shales, murram, and earth muds with 50% fair sized boulders as per SS 20B for narrow foundation.(For column, Al round wall, Cross wall, D/F For column, Septic tank, Ramp Side wall, Steps)
Filling with river M-Sand including cost and coveyance of all materials to work site and all labour charges etc. (For column, Main wall all round, cross wall, D/F For column, Kitchen, Store, Hall, Toilet, D/F W/C, Septic tank, Ramp Side wall, Ramp inner, Steps)
Cement Concrete 1:4:8 mix using 40mm metal including cost and conveyanceof all materials to work site and all labour charges etc.(For column, Main wall al round, Cross wall, D/F For column, Kitchen, Store, Hall, Toilet, D/F W/C, Septic tank, Ramp Side wall, Steps, Ramp inner,)
Refilling in foundation and basement with excavated earth in layer of not more than 15cm thick (For column, D/F SF, D/F PCC, D/F RCC, D/F Coping, D/F Column, For column, EW for Grade Beam, D/F SF, D/F PCC, Kitchen, Store, Basement Hall, Toilet, D/F W/C, Ramp inner)
Brick work in cement mortar 1:5 mix using country bricks including cost and conveyance of all materials to site and all labour charges etc complete Upto basement (Main wall al round, Cross wall, Toilet, Kitchen, D/F For Toilet Door Open, D/F For Column, Ramp Side wall, STEP 1, STEP 2, STEP 3, STEP 4, Septic tank wall, Baffle wall)
Brick work in C.M 1:5 mix using country bricks incuding cost and conveyance and all labour charges etc. Above basement (Main wall alround, Cross wall, Toilet, Kitchen, D/F For column, D/F Door D2, D/F Door D2, D/F Door D, D/F Door D1, D/F Window W1 & Wall, D/F Window W1, D/F Window W, D/F Ventilator V, D/F Exhaust fan, Toilet Front, Window W1 & Wall, Window W1, Window W, Main wall alround 3 side, Cross wall above hall, Kitchen D/F For column, Main wall alround 3sides, Cross wall above hall, Kitchen, Parapet, Parapet over toilet, Cuboard side wall in kitchen, Cuboard bottom wall in kitchen, Cooking platform wall, Cuboard side wall in hall, Cuboard bottom wall in hall, cross wall at baby friendly toilet )
RCC 1:1.5:3 mix using 20mm metal including cost and conveyance and all labour charges etc.Upto Basement (For column mat, For column coping, For column up to grade beam, Grade beam allround, Cross wall, cross wall, Cross wall, For column up to Basement, Septic tank slab)
RCC 1:1.5:3 mix using 20mm metal including cost and conveyance and all labour charges etc.For Above basement (For column up to lintel, Sill Slab Sides W1, Sill Slab Sides W1, Sill Slab Sides W, Sill Slab Sides W, Lintel over D2 of Toilet, Lintel alround, Cross Wall, lintel toilet Cross Wall, Kitchen cross Wall, Sunshade in front, Rear Window Sunshade, Side Window Sunshade, Toilet Roof, Toilet Roof, For column lintel to roof level, For column lintel to roof level (T beam), Roof beam Alround Hall, T beam at hall, cross beam b/w hall and kitchen, cross beam b/w store and kitchen, Columns, Roof slab)
Supplying and errecting for sides & soffits including supports and strutting upto 3.29m height for plane surface in all floors including cost and conveyance and all labour charges etc.(For column up to grade beam, Grade beam , Store, Kitchen, Hall, Toilet, baby friendly toilet, Column Upto Basement, Septic Tank bottom, Septic Tank sides )
Supplying and errecting for sides & soffits including supports and strutting upto 3.29m height for plane surface in all floors including cost and conveyance and all labour charges etc.(For Column up to Lintel level, Sill Slab Sides W1, Sill Slab Sides W1, Sill Slab Sides W, Sill Slab Sides W, Sides, Lintel over D2 of Toilet, Lintel over D2 of Toilet, lintel alround Hall, baby friendly toilet, Toilet, Kitchen, Store, Outer alround, Door Bottom D2, Door Bottom D1, Door Bottom D, Window bottom W & W1, Ventilator V bottom, Rear Sunshade, Kitchen Sunshade, Frount sunshade, sunshade sides face, Disabled Toilet roof slab bottom, B.F Toilet roof slab bottom, For column lintel to roof level, For column lintel to roof level T-beam, T-beam at hall, Hall Beam alround, D/f Column, Kitchen Beam alround, Store alround, Roof bottom, Kitchen bottom, Store, Column Sides, Roof slab Sides )
Supply and fabrication of steel including cost and conveyance and alla labour charges etc. complete.
Providing granolithic floor finish of the following thickness with plain cement concrete 1:2:4 (One Cement, Two crushed stone M.Sand and Four aggregate) using 10 to 12mm gauge hard broken stone jelly including laying, finishing and the top rubbed smooth with power trawl, thread lining, curing etc. complete complying with standard specification and as directed by the departmental officers. (The rate is inclusive of necessary planking for panelling wherever necessary and as directed by the departmental officers)
Providing and Applying CFTRI approved two component flexible polymer modified acrylic cementitious waterproofing coating with a mix ratio of (5 Liquid :7 Powder) to the RCC surface like Roof, bathroom, toilet, balcony & utility area applied @ 2.2kg/m2 in 2 coats to achieve 1.2mm DFT, having Elongation at break >120% as per ASTM D 412, Tensile strength >1N/ mm2 as per ASTM D 412, Adhesion strength: 0.80N/mm2 as per ASTM D 4541, crack bridging upto 2mm as per ASTM C 836. The finished cost to include surface preparation, making coving of 50 mm X 50mm at all right angles of wall Junction with Polymer Repair Mortar and lay 45 gsm glass fibre mesh over the angle fillet when the first coat in still wet, treatment of cracks completely as per specification
Plastering with Cement Mortar 1:3 (One Cement and Three Plastering M.Sand) 20mm thick mixed with water proofing compound conforming to BIS at 2% by weight of cement used including finsihing, curing, etc., complete in all floors complying with standard specification and as directed by the departmental officers.
Plastering with cement mortar 1:5, 12mm thick including cost and conveyance and all labour charges etc.(Hall inside (including Basement inner wall), Kitchen inside (including Basement inner wall), Store inside (including Basement inner wall), Toilet inside (including Basement inner wall) ,Toilet inside (including Basement inner wall) ,outside alround upto toilet paraphet wall,outside alround building above toilet paraphet wall,Parapet top, Parapet top,Parapet inside, Parapet inside, soffits V, soffits V1, soffits exhaust fan, Soffits of D2, Soffits of D1, Soffits of D, Soffits of W1 & W, Front side sunshade Top, Window sunshade top, Cubboard wall side face, Cubboard wall front face, Cubboard Bottom , Cooking platform wall, baby friendly toilet cable wall, baby friendly toilet cable wall, Step tread, Step rise, step1side face, step2side face, step3side face, step4side face, Ramp side, Septic tank outer )
Providing granolithic floor finish of the following thickness with plain cement concrete 1:2:4 (One Cement, Two crushed stone M.Sand and Four aggregate) using 10 to 12mm gauge hard broken stone jelly including laying, finishing and the top rubbed smooth with power trawl, thread lining, curing etc. complete complying with standard specification and as directed by the departmental officers. (The rate is inclusive of necessary planking for panelling wherever necessary and as directed by the departmental officers) 20MM thickness
Plastering with cement mortar 1:3, 20mm thick including cost and conveyance and all labour charges etc.(Septic tank sides, Front side sunshade Bottom, Window sunshade bottom, Window sunshade bottom, )
Supplying and applying of two coats of putty of 3mm thick over the exposed RCC surface of ceiling including finishing the joints smoothy with grinding machine and the surface shall be thoroughly cleaned out of dust and scrubbing. The Surface shall then be allowed to dry for atleast 48 hours. It shall then be sand papered (waterproof abrasive sheet) to give a smooth and even surface. Any unevenness shall be made good by applying 1st coat of putty mixed with water on the entire surface including filling up the undulations and applying 2nd coat of putty after 6 hours of 1st coat of putty and then sand papering (waterproof abrasive sheet) the same after it is dry and finishing the surface smoothly, etc., complete complying with standard specifications and as directed by the Departmental Officers. [The rates are inclusive of hire charges for grinding machine with wheel, cost of sand paper (waterproof abrasive sheet), cost of putty blade, labour charges for grinding the joints and sand papering, two coat of putty, scrapping the putty area to level the surface smooth, etc., complete]. The Putty should be got approved by the Executive Engineer before use on work.
Paving the floor with best approved quality fine polished shahabad stone slabs of size 600 x 600 of 18 / 20mm with machine cut edges and matching marble slab not less than 100mm width other than Adanga Marbles as border laid over a cement mortar bed of 20mm thick using cement mortar 1:3 (One cement and three sand) fixing the slabs in true right angles with minimum possible width of joints and pointing the joints with white cement mixed with mathcing colouring pigments and polishing with floor polisher to a high degree of finish etc., The kota stone slabs and other materials to be used shall be got approved by the Executive Engineer concerned before use on work, etc., complete as per standard speicification
Dadooing the sides of walls up to required height with est approved quality colour printed glazed tiles of size 150x150x6mm and set in CM 1:2 using 10 mm thick and pointing with same colour cement of 4 kg including cost and conveyance of all materials to
Towards the cost of steel door of size 1.10mx2.40 m including all charges etc.
Towards the cost of steel door of size 0.75mx1.50 m including all charges etc.
Towards the cost of steel door of size 0.90mx2.40 m including all charges etc.
Towards the cost of steel Window of size 1.20mx1.60 m including all charges etc.
Towards cost and fixing of Exhaust fan including cost and conveyance and labour for fixing etc
RCC Jolly (0.60X.60)
Steel Ventilator V1(0.90X.45)
Provision for electrification arrangements with service connectionLight point
Provision for electrification arrangements with service connectionTube Light fitting
Provision for electrification arrangements with service connectionFan point
Provision for electrification arrangements with service connectionFan
Provision for electrification arrangements with service connectionPlug point
Provision for electrification arrangements with service connectionCFL lamp
Provision for electrification arrangements with service connectionDPI swtich of 500 V
Provision for electrification arrangements with service connectionG I Pipe
Provision for electrification arrangements with service connectionService Wire
E B Deposit
Painting two coats Emulsion paint over cement plastered wall including cost and conveyance of all materials to site and all labour charges etc complete ( Inner and outer )
Painting two coats using Ist quality readymix enamel paint of approved colour over new iron work including cost and conveyance and all labour charges etc.
Towards the cost and supply of Indian type water closet including etc .
Towards the cost and supply of Europien type water closet including etc .
Towards the cost and supply of 4" Rainwater Downfall pipe fixing with clamps etc .
Towards the cost and supply of Cuddapah slab for Shelf including etc complete.
Provision for Rcc precast rings to RWH arrangements
Provision for Rcc precast slab RWH arrangements
Provision for PVC Pipe 3" Dia for septic tank
Provision for Name board
QC Charges
Contingencies and P.S. other charges etc.,
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_767552.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.81 MB
BOQ_767552.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .