Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.7 LAccepted-Finance | L1 | Accepted-Finance ok | |
| 2 | L2₹1.7 L+₹33 (0.02%)Accepted-Finance | L2 | Accepted-Finance ok | |
| 3 | L3₹2.1 L+₹38,656.50 (23.2%)Accepted-Finance | L3 | Accepted-Finance ok | |
| 4 | L4₹2.2 L+₹54,515.50 (32.7%)Accepted-Finance | L4 | Accepted-Finance ok | |
| 5 | L5₹2.6 L+₹98,191 (58.9%)Accepted-Finance | L5 | Accepted-Finance ok |
Tender Value
₹1.3 L
EMD Value
₹3,290
Closing Date
5 Jun 2020, 5:00 pmClosed
Executive Officer, MC Solan
Executive Officer, MC Solan
Repair and Maintenances of path, Chamber Tiles Nallah and plastering work above Harsh hotel near Gurukul school Ward No 3. Solan
2020_UDDHP_37418_1
TEN(5)20/2019-2240,13/05/2020
Open Tender
Civil Works
Item Rate
90 days
MC Solan
Please refer Tender documents.
8 documents required · 8 mandatory
₹500
Executive Officer, MC Solan
₹3,290
12 Mar 2021
26 May 2020
6 Jun 2020
26 May 2020
5 Jun 2020
26 May 2020
Amount
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material
Disposal of all Excavated Earth by mechanical transport up to 5km.
Providing and laying cement concrete 1:6:12 (1 cement:6 sand : 12 graded stone aggregate 40 mm nominal size) and curing complete excluding cost of centring and shuttering in: Foundation and plinth:
Providing and laying cement concrete 1:2:4(1 cement:2 sand :4 graded stone aggregate 20mm nominal size)and curing complete excluding cost of form work in: (a) Foundation and plinth.
Brick work using common burnt clay building bricks in foundation and plinth in :-Cement Mortar 1:6 (1 Cement : 6 Sand) Second Class Bricks
Stone masonry in cement mortar for substructure complete as per drawing & technical specification Clauses 702, 704, 1202 and 1204 Random rubble masonry In cement mortar (1:6) as per HP.PWD specification, including carriage of all labour equipment and materials to various location through all modes of transportation in all leads and lifts , including all incidental charges
Providing and fixing precast checkered tiles 20mm tnick Red Colour laid in floors, treads of steps and landing on a bed of 25mm average thickness of cement mortar 1:6 ( 1cement,6sand) jointed with neat cement slurry mixed with pigment to match the colour of tile.
Providing and fixing on wall face PVC (D-Plast) rain water pipes of working pressure not less than 4.5 kg/sqm including filling the joints withapproved adhesive complete. 150mm dia
Construction chamber 300*300*500(Three hundred into Three hundred into Five hundred) inside size for stop cock with Cast Iron surface box 100*100*75 (One hundred into One hundred into Seventy Five) millimeters (inside) with hinged cover fixed in cement concrete slab 1:2:4 mix (One cement isto Two sand isto Four graded stone aggregate Twenty millimeters nominal size) 75 (Seventy Five) millimeters thick foundation concrete 1:5:10 ( One cement isto Five sand isto Ten grades stone aggregate forty millimeters nominal size) and inside plastering with cement mortar 1:3 (One cement isto Three sand) finished with a floating coat of neat cement including curing complete :- with 100 (One hundred) millimeters thick walls of brick masonry in cement mortar 1:5(One cement isto Five sand), as per HP.PWD specification, including carriage of all labour equipment and material to various location through all modes of transportation in all leads lifts and all incidental charges.
Steel work welded in built up sections,trusses and framed work,including cutting ,hoisting, fixing in position and applying a priming coat of red lead paint In gratings framed guard bars,ladders,railling,brackets and similar works
Ankur Thakur
Rahul Sharma
Vinay SHarma
Subhash Chand Rana
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .