Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.2 CrAccepted-AOC | ₹1.2 Cr | L1 | Accepted-AOC Rate Accepted |
| 2 | L2₹1.2 CrRejected-AOC NEHRU NAGAR DHARMAPURI | DHARMAPURI | TAMIL NADU | 635106 | ₹1.2 Cr | L2 | Rejected-AOC Rate High |
| Sl No | Description | Qty | Unit | LAKSHMI ROADS AND INFRA | CHINNAMUTHU CONTRACTORS |
|---|---|---|---|---|---|
| 1.00Denkanikottai Branch | |||||
| 1.01 | Supplying and FILLING GRAVEL in 'foundation and basement with filling gravel in layers of not more than 15cm.thick well rammed watered and compacted etc., complete complying with standard specification. | 682.49 | M3 | 2,21,126.76 ₹2.2 L | 2,72,996 ₹2.7 L |
| 1.02 | Plain Cement Concrete 1:5:10 (One cement, Five crushed stone sand and Ten hard broken stone) using 40 mm gauge hard broken jelly for foundation and flooring including laying, consolidating, finishing, rendering the top surface rough to receive the floor, curing, etc. complete complying with standard specification. as directed by the departmental officers (mixing mortar by machine).. | 657.7 | M3 | 33,09,546.4 ₹33.1 L | 33,87,155 ₹33.9 L |
| 1.03 | Plain Cement Concrete 1:2:4 (one cement, two crushed stone sand and four hard broken stone jelly) using 20mm jelly laying 150mm thick of 3 M X 6 M of size of bays alternatively. The rate including laying, compacting, finishing and includes the charges for steel centering curing, etc., complete as per standard specifications and as directed by the departmental officers. for foundation and basement | 987.8 | M3 | 65,17,504.4 ₹65.2 L | 65,68,870 ₹65.7 L |
| 1.04 | Supplying and fixing of Bitumen tar pad 15 mm thick approved quality and brand to the expansion concrete joints including cost of all materials and labour charges for fixing etc as directed by the departmental officers. | 465 | M2 | 1,08,810 ₹1.1 L | 1,39,500 ₹1.4 L |
| 1.05 | Supplying, fabricating and placing in position Mild Steel / Ribbed Tor Steel grills for all RCC works as per design given including cost of steel and G.I. binding wire in all floors etc. complete complying with standard specification. (Contractor has to make his own arrangements for the supply of steel and binding wire) | 6.83 | Qtl | 61,333.4 ₹61,333.40 | 62,494.5 ₹62,494.50 |
| 1.06 | Basic Total | 1 | BT | - | - |
| 1.07 | CGST 9% | 1 | CGST | - | - |
| 1.08 | SGST 9% | 1 | SGST | - | - |
Updated dates
Tender Value
Refer Docs
EMD Value
₹1.2 L
Closing Date
29 Dec 2025, 11:00 amClosed
Managing Director
Asst Manager(Materials) Deputy Manager(Tech) Deputy Manager(Accounts) General Manager(Tech)
PROVIDING CEMENT CONCRETE FLOORING IN TNSTC(SALEM) DEPOT AT DENKANIKOTTAI
2025_TNSTC_625942_1
TNSTC/SLM/PUR/25/2025
Open Tender
Civil Works
180 days
Denkanikottai
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹1.2 L
4 Mar 2026
24 Nov 2025
29 Dec 2025
24 Nov 2025
29 Dec 2025
24 Nov 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_748492.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Document
0.80 MB
BOQ
BOQ • 0.28 MB
Download all tender documents and submit your bid