Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹28.7 CrQualified | ₹28.7 Cr | L1 | Qualified MII |
| 2 | L2₹28.8 CrQualified | ₹28.8 Cr | L2 | Qualified MII |
| 3 | L3₹34.5 CrQualified | ₹34.5 Cr | L3 | Qualified MII |
Tender Value
₹30 Cr
EMD Value
₹15 L
Closing Date
10 Oct 2022, 5:00 pmClosed
SUPPLY AND ERECTION OF CORRUGATED STEEL PIPE
3797320
GEM/2022/B/2545016
Part A 60 M LENGTH TUNNEL AT KM 50.000 ON ROAD TALIHA NACHO IN UPPER SUBANSIRI DISTRICT UNDER 77 RC
300 days
Arunachal Pradesh; West Siang, Arunachal Pradesh; Papum Pare
Total value wise evaluation
BOQ
5 documents required · 5 mandatory
3 yrs
₹30 Cr
₹30 Cr
20%
₹15 L
21 Oct 2022
16 Sept 2022
10 Oct 2022
| Item No | Item Title | Description | Qty | Unit | Consignee | Delivery (days) |
|---|---|---|---|---|---|---|
| 1 | Part A 60 M LENGTH TUNNEL AT KM 50.000 ON ROAD TALIHA NACHO IN UPPER SUBANSIRI DISTRICT UNDER 77 RCC 23 BRTF | Supply and erection of Corrugated Steel pipe Tunnel as per detailed specification and project drawing including all material,fasteners, their tightening and gasket with all required machines and equipment design and drawings given by IIT Bombay Department of Civil engineering for 60 m cut and cover tunnel structure from km 50.00 to km 50.060 on Taliha - Nacho road under 77RCC,23BRTF project Arunank in the state of Arunachal Pradesh . | 60 | Mtr | West Siang | 300 |
| 2 | Part A 170 M LENGTH TUNNEL AT KM 56.900 ON ROAD TALIHA NACHO IN UPPER SUBANSIRI DISTRICT UNDER 77 RCC 23 BRTF | Supply and erection of Corrugated Steel pipe Tunnel as per detailed specification and project drawing including all material, fasteners ,their tightening and gasket with all required machines and equipment design and drawings given by IIT Bombay Department of Civil engineering for 170 m cut and cover tunnel structure from km 56.900 to km 57.070 on Taliha - Nacho road under 77RCC,23BRTF project Arunank in the state of Arunachal Pradesh | 170 | Mtr | West Siang | 300 |
| 3 | Part B 140 M LENGTH TUNNEL AT KM 2.000 ON ROAD HAPOLI SARLI HURI UNDER 119 RCC 756 BRTF IN KURUNG KUMEY | Supply and erection of Corrugated Steel pipe Tunnel as per detailed specification and project drawing including all material, fasteners, their tightening and gasket with all required machines and equipment design and drawings given by IIT Bombay Department of Civil engineering for 140 m cut and cover tunnel structure from km 2.000 to km 2.160 on Hapoli-Sarli- Huri road under 119 RCC,756 BRTF project Arunank in the state of Arunachal Pradesh . | 140 | Mtr | Papum Pare | 240 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
bid_3797320.pdf
GEM_BID
supply16sep2022_2022-09-16-12-52-40_625e21618bc22bd0159dd90caa11d320.pdf
BOQ
boq_item_sample_file_2022-09-16-12-52-40_bddd93aafdd174d93557d0dda5cafccb.csv
BOQ
gtc.pdf
OTHER
Download all tender documents and submit your bid