Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.5 LAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹2.5 L+₹6,899.84 (2.78%)Admitted-Finance | L2 | Admitted-Finance | ||
| 3 | L3₹2.9 L+₹42,089.01 (17.0%)Admitted-Finance | L3 | Admitted-Finance | ||
| 4 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical Others-Affidavit and CDR not uploaded. |
Tender Value
₹3 L
EMD Value
₹6,000
Closing Date
20 Jul 2026, 6:55 pmClosed
Er. Raman Kumar (Xen PWD Chenani)
PWD OFFICE CHENANI
Refer to BOQ
2026_PWDJK_316047_1
Fresh e-NIT No. 36 of 2026-27 dated 14-07-2026
Open Tender
Civil Works
Percentage
30 days
Chenani
Refer to e-NIT/SBD
2 documents required · 2 mandatory
₹600
XEN PWD CHENANI
₹6,000
25 Jul 2026
14 Jul 2026
21 Jul 2026
14 Jul 2026
20 Jul 2026
14 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5 m in width as well as10 sqm on plan including disposal of excavated earth, leadupto50meterand lift upto 1.5m, as directed by Engineer-in-Charge. All kinds of soil : | - | sqm | - | - |
| 2 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: 1 meter from cutting edge All kinds of soil : | 1 | cum | - | - |
| 3 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) | 1 | Cum | 1 | ₹1 |
| 4 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) crushed 20% boulders | - | Cum | - | - |
| 5 | Centering and shuttering including strutting, propping etc. and removal of form work for: Foundations, footings, bases of columns etc. | - | sqm | - | - |
| 6 | Providing and laying 60mm thick factory made cement concrete interlocking paver block of M-30 grade made by block making machine with strong vibratory compaction and of approved size and design/shape laid in required colour and pattern over and including 50mm thick compacted bed of fine sand, filling the joints with coarse sand etc. all complete as per direction of Engineer-in-charge. | 1 | sqm | 1 | ₹1 |
| 7 | Carriage of Material by Mech. Transport / Mannual means including loading, unloading & Stacking at site complete | - | - | - | - |
| 8 | Sand lead up to 160 km. by Mechanical means and lead upto 200 mtr by manual means av. | 1 | cum | - | - |
| 9 | Stone aggregate 40 mm nominal size & above lead up to 90 km. by mechanical means and lead upto 200 mtr by manual means av. | 1 | cum | 1 | ₹1 |
| 10 | Stone aggregate below 40 mm lead up to 90 km. by mechanical means and lead upto 200 mtr by manual means av. | 1 | cum | - | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.44 MB
BOQ_1028344.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .