| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.5 CrAdmitted-Finance | ₹1.5 Cr | L1 | Admitted-Finance |
| 2 | L2₹1.5 Cr+₹12,965.50 (0.08%)Admitted-Finance | ₹1.5 Cr+₹12,965.50 (0.08%) | L2 | Admitted-Finance |
| 3 | L3₹1.8 Cr+₹24.5 L (16.0%)Admitted-Finance | ₹1.8 Cr+₹24.5 L (16.0%) | L3 | Admitted-Finance |
| 4 | L4₹1.8 Cr+₹32.1 L (21.0%)Admitted-Finance 51 PG ENCLAVE OPP SILVER OAK HOTEL PATEL NAGAR CITY CENTRE GWALIOR M P | GWALIOR | GWALIOR | MADHYA PRADESH | ₹1.8 Cr+₹32.1 L (21.0%) | L4 | Admitted-Finance |
| 5 | L5₹2.0 Cr+₹48.8 L (31.9%)Admitted-Finance | ₹2.0 Cr+₹48.8 L (31.9%) | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | TECHNOGEM CONSULTANTS PRIVATE LIMITED L3 | L N MALVIYA INFRA PROJECTS PVT LTD L7 | GLOBAL INFRA SOLUTIONS L1 | Almondz Global Infra Consultant Limited L6 | JAIMAN Construction and Consultants LLP L5 | M/s Engineering Consultancy Services L4 | JC Technocrats Private Limited L2 |
|---|---|---|---|---|---|---|---|---|---|---|
| 1.00Key Personnel | ||||||||||
| 1.01 | Team Leader cum Senior Highway Engineer | 18 | Months | 1,75,000 ₹31,50,000 | 1,50,000 ₹27,00,000 | 1,50,000 ₹27,00,000 | 1,00,000 ₹18,00,000 | 2,20,000 ₹39,60,000 | 90,000 ₹16,20,000 Lowest | 1,25,000 ₹22,50,000 |
| 1.02 | Resident cum Structural Engineer | 30 | Months | 1,10,000 ₹33,00,000 | 1,20,000 ₹36,00,000 | 1,20,000 ₹36,00,000 | 80,000 ₹24,00,000 Lowest | 1,65,000 ₹49,50,000 | 85,000 ₹25,50,000 | 1,10,000 ₹33,00,000 |
| 1.05 | Senior Quality Cum Material Expert | 18 | Months | 1,00,000 ₹18,00,000 | 1,40,000 ₹25,20,000 | 1,20,000 ₹21,60,000 | 80,000 ₹14,40,000 | 1,45,000 ₹26,10,000 | 75,000 ₹13,50,000 Lowest | 90,000 ₹16,20,000 |
| 1.07 | Senior Contract Specialist | 4 | Months | 1,00,000 ₹4,00,000 | 1,00,000 ₹4,00,000 | 35,000 ₹1,40,000 | 80,000 ₹3,20,000 | 75,000 ₹3,00,000 | 30,000 ₹1,20,000 Lowest | 40,000 ₹1,60,000 |
| 2.00B: Sub Professional Staff | ||||||||||
| 2.01 | Survey Engineer | 21 | Months | 45,000 ₹9,45,000 | 50,000 ₹10,50,000 | 45,000 ₹9,45,000 | 70,000 ₹14,70,000 | 50,000 ₹10,50,000 | 70,000 ₹14,70,000 | 30,000 ₹6,30,000 Lowest |
| 2.08 | Asst. quality cum material Engineer | 18 | Months | 45,000 ₹8,10,000 | 30,000 ₹5,40,000 | 45,000 ₹8,10,000 | 70,000 ₹12,60,000 | 50,000 ₹9,00,000 | 70,000 ₹12,60,000 | 25,000 ₹4,50,000 Lowest |
| 2.11 | Quantity Surveyor | 22 | Months | 45,000 ₹9,90,000 | 50,000 ₹11,00,000 | 50,000 ₹11,00,000 | 70,000 ₹15,40,000 | 50,000 ₹11,00,000 | 70,000 ₹15,40,000 | 25,000 ₹5,50,000 Lowest |
| 3.00Support Staff | ||||||||||
Tender Value
₹2.2 Cr
EMD Value
₹2.2 L
Closing Date
3 Aug 2023, 5:30 pmClosed
EE NHD Aurangabad
EE NHD Aurangabad
Consultancy Services For Authority Engineer For Supervision of Rehabilitation Upgradation to 4 lane with Paved shoulder of Existing Section in Sillod Town with Design Ch. Km. 54.500 to Km. 60.679 Length6.179 Km.Section of NH-753F Aurangab
2023_MoRTH_757687_1
EENH/Aurangabad/Tender/NIT No-07/3001072
Open Tender
Civil Works
Works
900 days
Aurangabad
Rs. 10000-towards cost of RFP at the same time of the submission, through the portal bharatkosh.gov.in (receipt/document of online payment to be submitted online on eprocure.gov.in)
8 documents required · 8 mandatory
₹0
₹2.2 L
CE Office Konkan Bhavan Navi Mumbai CBD Belapur
5 Feb 2024
14 Jun 2023
4 Aug 2023
14 Jun 2023
3 Aug 2023
14 Jun 2023
7 Jul 2023
Amount
Key Personnel
Team Leader cum Senior Highway Engineer
Resident cum Structural Engineer
Senior Quality Cum Material Expert
Senior Contract Specialist
B: Sub Professional Staff
Survey Engineer
Asst. quality cum material Engineer
Quantity Surveyor
Support Staff
Office Manager cum accountatnt
Steno cum Computer operator
Office Boy
Transportation
Mahendra Scorpio or Bolerio equivalent 02 Nos (not more than 06 month old)
Duty Travel to site
Duty Travel to Site to CE RO MoRTH office for Key Professionals
Site to State PWD office for Key Professionals
Office Rent (Fixed Costs) The rent cost includes maintenance, Cleaning, repairs, etc.
Office Supplies, Utilities and Communication (Fixed Costs)
Office Supplies
Drafting Supplies
Computer Running Costs
Domestic and International Communication
Office Furniture and Equipment ( Rental )
Office Furniture and Equipment
Reports and Document Printing
Monthly Report (per month)
Inception Report & QAP/Half Yearly Report
Various others reports as provided in the concession Agreement such as completion Report
Survey Equipment with Survey Party and vehicle.
Surface defects detection and roughness measuresment using Network Survey Vehicle
Pavement Strength measurement using FWD
Bridge inspection using Mobile Bridge Inspection Unit
Road Sign inspection using Retro Refelectometer
Contingencies
JC Technocrats Private Limited
TECHNOGEM CONSULTANTS PRIVATE LIMITED
M/s Engineering Consultancy Services
JAIMAN Construction and Consultants LLP
Almondz Global Infra Consultant Limited
L N MALVIYA INFRA PROJECTS PVT LTD
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .