Loading…
Loading…
Tender Value
₹35 L
EMD Value
₹70,000
Closing Date
13 Oct 2026, 6:00 pm
GE Gangtok
GE Gangtok New Mil Stn Gangtok Sikkim
PROVN OF TWO WHEELER SHED IN FRONT OF BLDG NO OR-38 AND 39 AND FOUR WHEELER SHED IN FRONT OF OR-31 AND RETAINING WALL NEAR BLDG NO MAJ-14 AND ADDL/ALTN OF BLDG NO P-259 (GUARD REST ROOM) AND REPLACEMENT OF CGI ROOF SHEET UNDER GE GANGTOK
2026_MES_790723_1
C/8477/A/E8
Open Tender
Miscellaneous Works
Works
240 days
GE Gangtok New Mil Stn Gangtok Sikkim
As per tender document
8 documents required · 8 mandatory
₹500
GE Gangtok
₹70,000
Yes
23 Sept 2026
23 Sept 2026
19 Oct 2026
23 Sept 2026
13 Oct 2026
6 Oct 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Taking down chowkhats or frame with shutters (without taking off shutters from the frame) not exceeding 1.50 Sqm each complete all as directed. | 2 | Each | - | - |
| 2 | Taking down chowkhats or frame with shutters (without taking off shutters from frames) exceeding 1.5 Sqm but not exceeding 4 Sqm each complete all as directed. | 1 | Each | - | - |
| 3 | Dismantling of floor, hearth or wall tiling including cement mortar bedding (but not backing) and removal of dismantled materials/rubbish from site complete all as directed. | 15 | Sqm | - | - |
| 4 | Dismantling old PGI/CGI sheeting of any gauge thickness, including Nainital. Sikkim or similar pattern roof/facia etc complete all as directed. | 558 | Sqm | - | - |
| 5 | Dismantling of wall and ceiling boards (fibre, pulp, insulation etc) or insulation boards/slabs of any thickness including cover fillets complete all as directed. | 355.5 | Sqm | - | - |
| 6 | Surface excavation n. exc. 30cm deep and averaging 15cm deep and getting out in soft /loose soil complete all as directed. | 130 | Sqm | - | - |
| 7 | Rough excavation n. exc. 1.5 m deep and getting out in soft/disintegrated rock for foundation of Retaining wall complete all as specified and directed. | 41 | Cum | - | - |
| 8 | Rough excavation exc. 1.5m but n. exc. 3.0m deep in soft/disintegrated rock for foundation of retaining wall complete all as specified and directed. | 28 | Cum | - | - |
| 9 | Excavation over areas n. exc. 1.5m deep in soft/disintegrated rock for foundation of retaining wall complete all as specified and directed. | 21 | Cum | - | - |
| 10 | Excavating in trenches, n exc 1.5 m wide and n exc 1.5 m in depth; for foundation, etc. or for shafts, wells, cesspits, manholes, pier holes, etc. n exc 10 sq m on plan and n exc 1.5 m in depth and getting out in soft/loose soil complete all as specified and as directed. | 13 | Cum | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.11 MB
Tenderdocuments8477A.pdf
Tender Documents • 0.49 MB
BOQ_886436.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .