| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹37.2 LAccepted-AOC | ₹37.2 L | L1 | Accepted-AOC Accept |
| 2 | L2₹37.9 LRejected-Finance 17E COLLECTOR OFFICE ROAD VENKATHESAPURAM SUNDAR NAGAR EXTENSION NEAR DIC PERAMBALUR 621 212 | PERAMBALUR | TAMIL NADU | 621212 | ₹37.9 L | L2 | Rejected-Finance Above Contractor Value |
| Sl No | Description | Qty | Unit | TCB CONSTRUCTION L2 | Nallathambi S L1 |
|---|---|---|---|---|---|
| 1.00 | 1.Providing of BT road Vijayapuram Arasamaram road to Periyasamy Kovil road at Thondamandurai Pt.KM 0/0-2/500(R-346)
Applying PRIMECOAT over WMB/ WMM surface at 7.00Kg of SS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Comp. | 7,626 | M2 | 90 ₹6,86,340 | 86 ₹6,55,836 Lowest |
| 2.00 | Applying TACK COAT over BT surface at 2.50 Kg of RS-1 Bitumen Emulsion/ 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Comp. | 7,626 | M2 | 22 ₹1,67,772 | 21 ₹1,60,146 Lowest |
| 3.00 | BITUMINOUS CONCRETE 25 MM THICK USING cmp (Grade-II) Providing and laying Bituminious concrete to 40mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5 | 190.66 | M3 | 11,825 ₹22,54,554.5 | 11,760 ₹22,42,161.6 Lowest |
| 4.00 | Provision for HM ,Km Stone charges etc complete | 10 | Nos | 600 ₹6,000 | 570 ₹5,700 Lowest |
| 5.00 | Provision for HM ,Km Stone charges etc complete | 2 | Nos | 2,125 ₹4,250 | 2,000 ₹4,000 Lowest |
| 6.00 | Provision for sign board | 16 | Nos | 5,125 ₹82,000 | 4,999 ₹79,984 Lowest |
| 7.00 | Provision for Name Board | 1 | Nos | 7,000 ₹7,000 | 6,500 ₹6,500 Lowest |
| 8.00 | GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package} | 1 | GST Amount (in Rupees) | 5,77,425 ₹5,77,425 | 5,67,779 ₹5,67,779 Lowest |
Tender Value
₹37.2 L
EMD Value
₹37,700
Closing Date
6 Mar 2026, 3:00 pmClosed
BLOCK DEVELOPMENT OFFICER
PANCHAYAT UNION OFFICE VEPPANTHATTAI
Construction of BT road vijayapuram arasamaram road to periyasamy kovil road at thondamandurai pt KM 0/0-2500(R0346)
2026_RDTN_667508_1
A3/3168/2025 24.02.2026
Open Tender
Civil Works - Roads
Item Rate
180 days
PANCHAYAT UNION OFFICE
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹37,700
Yes
12 Mar 2026
27 Feb 2026
6 Mar 2026
27 Feb 2026
6 Mar 2026
27 Feb 2026
1.Providing of BT road Vijayapuram Arasamaram road to Periyasamy Kovil road at Thondamandurai Pt.KM 0/0-2/500(R-346) Applying PRIMECOAT over WMB/ WMM surface at 7.00Kg of SS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Comp.
Applying TACK COAT over BT surface at 2.50 Kg of RS-1 Bitumen Emulsion/ 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Comp.
BITUMINOUS CONCRETE 25 MM THICK USING cmp (Grade-II) Providing and laying Bituminious concrete to 40mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5
Provision for HM ,Km Stone charges etc complete
Provision for HM ,Km Stone charges etc complete
Provision for sign board
Provision for Name Board
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.06 MB
Tendernotice_1.pdf
PDF • 0.79 MB
PARTII.pdf
Tender Documents • 0.66 MB
PARTI.pdf
Tender Documents • 0.82 MB
BOQ_801897.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].