Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.2 LAccepted-Finance | L1 | Accepted-Finance Admitted | |
| 2 | L2₹5.4 L+₹21,239 (4.10%)Accepted-Finance | L2 | Accepted-Finance Admitted | |
| 3 | L3₹6.0 L+₹77,326.60 (14.9%)Accepted-Finance | L3 | Accepted-Finance Admitted | |
| 4 | L4₹6.4 L+₹1.2 L (22.6%)Accepted-Finance | L4 | Accepted-Finance Admitted | |
| 5 | L5₹6.9 L+₹1.7 L (32.9%)Accepted-Finance HANU YOKMA | SENAPATI | MANIPUR | 795007 | L5 | Accepted-Finance Admitted |
Tender Value
Refer Docs
EMD Value
₹13,680
Closing Date
27 Sept 2022, 4:00 pmClosed
Divisional Forest Officer, Leh
Divisional Forest Office, Forest Division Leh Fort Road UT of Ladakh
Construction of retaining wall of Terrance field for Plantation at Dharmma Centre Choglamsar community area of Leh Forest Range for the year 2022-23. (SDP Community plantation).
2022_FEE_7731_1
E-Tender (47) of FDL 2022-23
Open Tender
Civil Works - Others
Works
60 days
Leh
Please refer Tender documents.
2 documents required · 2 mandatory
₹400
Divisional Forest Officer, Leh
₹13,680
30 Sept 2022
21 Sept 2022
28 Sept 2022
21 Sept 2022
27 Sept 2022
21 Sept 2022
Amount
Earth work in excavation by mechanical means (hydraulic excavator) over areas (Exceeding 30cm in depth, 1.5mtr in width as well as 10sqm 0n plan)including disposal of excavated earth, lead up to 50m and lift upto 1.5m All kind of soil Area= 3x 220’.00x1’.”0= 660.00cfts or 18.67cum
Random rubble masonry with hard stone in foundation and plinth including leveling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20mm nominal size) at plinth level with Cement mortar 1:6 (1 cement : 6 coarse sand) 3x220’00”x1’.6”x2.3”=2227.5cfts or 63.03cum
Providing and laying in position cement concrete of specified grade including of centering and shuttering all work up to plinth level 1:3:6 (1 cement 3 fine sand 6 graded stone agg. 20mm nominal size) 1. crushed 3x220’.00”x1’.6”x0.3”=247.5cfts or 7.00cum
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each depositedLayer by ramming and watering, lead upto 50 m and lift upto 1.5 m. Area= 3x 220’.00x40’.00”x(0’.6”+1’.6”)/2 =26400.00cfts or 747.12cum
Carriage of materials from various sources to site of work by M.T including loading, unloading and stacking. Cement …………….. 05kms
Carriage of materials from various sources to site of work by M.T including loading, unloading and stacking. Sand &Stone aggregate ………10kms
Carriage of materials from various sources to site of work by M.T including loading, unloading and stacking. Stone………………………20kms
Asgar Ali
M/S SONAM TASHI
M/S SONAM ANGCHOK GOVT CONTRACTOR
MS SONAM CHOSDUP
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .