| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.7 CrAdmitted-Finance | +19.91% | ₹1.7 Cr | L1 | Admitted-Finance |
Updated dates
Tender Value
₹1.4 Cr
EMD Value
₹2.8 L
Closing Date
7 May 2026, 6:00 pmClosed
Executive Engineer PWD Dn Rajgarh (Churu)
Executive Engineer PWD Dn Rajgarh (Churu)
Remaining Construction and Development of Stadium in Rajgarh (Churu) (Risk and Cost)
2026_CEPWD_551512_2
E-NIT NO 01/2026-27 EE PWD DN RAJGARH
Open Tender
Civil Works
180 days
RAJGARH
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,000
Executive Engineer PWD Dn Rajgarh (Churu) /MDRSIL
₹2.8 L
Yes
13 May 2026
14 Apr 2026
8 May 2026
14 Apr 2026
7 May 2026
14 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1 | Supplying and Filling in plinth with blown sand under floors including watering ramming consolidating and dressing complete including cost of sand. | 1 | Cum | - | - | BI01010001010000000000000515BI0100001218 |
| 2 | Diluting and injection Chloropyrifos Emulsifiable concentrate 20% with 1% concentration for PRE-CONSTRUCTIONAL Anti termite treatment as per IS 6313 part III as amended from time to time and creating a continuous chemical barrier under and around the column pits, wall trenches, basement excavation, top surface of plinth filling, junction of wall and floor along the external perimeter of building expansion joints, over the top surface of consolidated earth of which aproch is to be laid surrounding of pipes and conduits etc. complete as per specification (Plinth floor area only shall be measured for payment and excluding the cost of chemical emulsion) | - | sqm | - | - | BI01010001010000000000000515BI0100001219 |
| 3 | Supplying chemical emulsion in sealed containers including delivery as specified.
Chlorpyriphos/Lindane emulsifiable concentrate of 20% | - | ltr | 243 | - | BI01010001010000000000000515BI0100001220 |
| 4 | Providing and laying in position cement concrete including curing, compaction etc. complete in specified grade excluding the cost of centering and shuttering - All work up to plinth level. | - | - | - | - | BI01010001010000000000000515BI0100001221 |
| 5 | 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size). | 1 | Cum | - | - | BI01010001010000000000000515BI0100001222 |
| 6 | Providing & fixing precast cement concrete coping 1 : 2 : 4 50mm thick complete as per specification :mix | 1 | Sqm. | - | - | BI01010001010000000000000515BI0100001223 |
| 7 | Centering and Shuttering with plywood or steel sheets including strutting, propping bracing both ways and removal of formwork for foundation , footings, strap beam, raft , bases of columns etc. for P.C.C | - | Sqm. | - | - | BI01010001010000000000000515BI0100001224 |
| 8 | Centering & shuttering with plywood or steel sheets including strutting, propping bracing both ways with steel props and removal of formwork for upto floor five level for : | - | - | - | - | BI01010001010000000000000515BI0100001225 |
| 9 | Suspended floors, roofs, landings, staircases, balconies, girders, cantilevers, bands, coping bed plates, anchor blocks, sills, chhajjas, lintel, beam, plinth beam etc. | - | Sqm. | - | - | BI01010001010000000000000515BI0100001226 |
| 10 | Columns, pillars, posts and struts etc. | - | Sqm. | - | - | BI01010001010000000000000515BI0100001227 |
stage.html
html • 0.02 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.72 MB
BOQ_983389.xls
BOQ • 0.66 MB
Download all tender documents and submit your bid