Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance 3 605 G F 105 SECTOR 3 VASUNDHARA GHAZIABAD UTTAR PRADESH 201012 | GHAZIABAD | UTTAR PRADESH | 201012 | Admitted-Finance |
| 4 | Admitted-Finance H NO 138 SHANTI NAGAR NEAR REAL PUBLIC SCHOOL VIJAY NAGAR GHAZIABAD UTTAR PRADESH 201009 | GHAZIABAD | UTTAR PRADESH | 201009 | Admitted-Finance |
Tender Value
₹32.6 L
EMD Value
₹33,000
Closing Date
28 May 2024, 12:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Superintending Engineer, EDC, Hapur
Superintending Engineer, EDC, Hapur
Shifting ofelectrity line and other associated work due to widening of Hapur-Bulandshahr marg in area of EDD-I Hapur
2024_PVVNL_922598_2
137(W)/EDCH/2023-24
Open Tender
Electrical Works
Lump-sum
Hapur
enclosed
3 documents required · 3 mandatory
₹3,540
SE, EDC, Hapur
₹33,000
30 May 2024
22 May 2024
28 May 2024
22 May 2024
28 May 2024
22 May 2024
Amount
FOR SHIFTING OF ELECTRICITY LINE AND OTHER ASSOCIATED WORKS, DUE TO SUDRADHIKARAN AND WIDENING OF HAPUR-BULANDSHAHAR MARG, IN DEPOSIT SCHEME, IN THE JURISDICTION OF EDD-I HAPUR, UNDER EDC., HAPUR.
Carriage of line material (like channel, agnle, clamp, earth rod, stay rod, ACSR Conductor etc.) from Electricity Store Center, Hapur to site of work with loading and unloading at both ends on Kachha Packka road.
Carriage of ST Pole 11 mtrs. Long from Electricity store center, Hapur/J.E. Store to site of work with loading and unloading at both ends on Kachha Packka road.
Carriage of PCC Pole 8.5 mtrs. Long from Electricity store center, Hapur/J.E. Store to site of work with loading and unloading at both ends on Kachha Packka road.
Carriage of 11KV XLPE Cable 3x120Sqmm. from Electricity Store Center, Hapur to site of work with loading and unloading at both ends on Kachha Packka road.
Carriage of 11KV XLPE Cable 3x185Sqmm. from Electricity Store Center, Hapur to site of work with loading and unloading at both ends on Kachha Packka road.
Carriage of 11KV XLPE Cable 3x70Sqmm. from Electricity Store Center, Hapur to site of work with loading and unloading at both ends on Kachha Packka road.
Carriage of Cable jointing Kit from Electricity Store Center, Hapur to site of work with loading and unloading at both ends on Kachha Packka road.
Carriage of Distribution Box single Phase from Electricity Store Center, Hapur to site of work with loading and unloading at both ends on Kachha Packka road.
Erection & Fixing of PCC Pole 8.5 mtr. long in 11 KV line after digging of suitable pits including fixing of requisite all accessories as per RESPO Drawing/Norms by providing F-Bracket and holding Clamps made of M.S. Flat of size 50x6 mm with proper size nuts and bolts,
Erection & Fixing of PCC Pole 8.5 mtr. long in LT. line after digging of suitable pits including fixing of requisite all accessories as per RESPO Drawing/Norms by providing L.T. Pin Clamps, M.S. Flat of size 50x6 & Schacle Insulator of size 75x90mm, with proper size nuts and bolts.
Erection & Fixing of STP Pole 11 mtr. long in 11 KV line after digging of suitable pits including fixing of requisite all accessories as per RESPO Drawing/Norms by providing F-Bracket and holding Clamps made of M.S. Flat of size 50x6 mm with proper size nuts and bolts.
Erection of double pole structure with all accessories on ST Pole 11 mtr. long, fabrication and fixing of M.S. Top & Dropper Channel, M.S. T/F Angle, E-Bracket, 11 KV Pin insulator with Pin, Disc Insulator with Disc fitting etc., as per RESPO Drawing/Norms by providing all clamps made of M.S. Flat of size 50x6 mm with proper size nuts and bolts, and jumpering etc work.
Erection of Tri-pole structure with all accessories on ST Pole 11 mtr. long, fabrication and fixing of M.S. Top & Dropper Channel, M.S. T/F Angle, E-Bracket, 11 KV Pin insulator with Pin, Disc Insulator with Disc fitting etc., as per RESPO Drawing/Norms by providing all clamps made of M.S. Flat of size 50x6 mm with proper size nuts and bolts, and jumpering etc work.
Erection of double pole structure with all accessories on PCC Pole 8.5 mtr. long, fabrication and fixing of M.S. Top & Dropper Channel, M.S. T/F Angle, E-Bracket, 11 KV Pin insulator with Pin, Disc Insulator with Disc fitting etc., as per RESPO Drawing/Norms by providing all clamps made of M.S. Flat of size 50x6 mm with proper size nuts and bolts, and jumpering etc work.
Laying , Stringing and final sagging of ACSR Dog Conductor after binding from Insulator, as per RESPO/Drawing Norms and as per direction of site incharge.
Laying , Stringing and final sagging of ACSR Weasel Conductor after binding from Insulator, as per RESPO/Drawing Norms and erection of service line connections properly as per direction of site incharge.
Laying of LT ABC (3x120+1x95+1x16)sqmm and completion work properly, as per RESPO/Norms., including by provinding fitting all accessories and reconnetion of service line properly as per direction of site incharge.
Laying of LT XLPE Cable 3.5x400sqmm and completion work properly, as per RESPO/Norms., including by provinding fitting all accessories. and as per direction of site incharge.
Laying of 11KV XLPE Cable 3x120sqmm and completion work properly, according to santioned estimate and as per RESPO/Norms and as per direction of site incharge.
Laying of 11KV XLPE Cable 3x185sqmm and completion work properly, according to santioned estimate and as per RESPO/Norms and as per direction of site incharge.
Laying of 11KV XLPE Cable 3x70sqmm and completion work properly, according to santioned estimate and as per RESPO/Norms and as per direction of site incharge.
Making and filling of 11KV Cable Jointing Kit, 3x120sqmm. indoor type, after duly plumbing and taping of suitable XLPE Cable, providing, fixing and crimping of proper size good quality lugs, including cost of lugs and tape etc., as per RESPO Norms and as per direction of site incharge.
Making and filling of 11KV Cable Jointing Kit, 3x185sqmm. indoor type, after duly plumbing and taping of suitable XLPE Cable, providing, fixing and crimping of proper size good quality lugs, including cost of lugs and tape etc., as per RESPO Norms and as per direction of site incharge.
Making and filling of 11KV Cable Jointing Kit, 3x70sqmm. indoor type, after duly plumbing and taping of suitable XLPE Cable, providing, fixing and crimping of proper size good quality lugs, including cost of lugs and tape etc., as per RESPO Norms and as per direction of site incharge.
Erection & Fixing of Distribution Box on pole by provding 02 Nos. D/B Clamps & proper size nut & bolts, as per RESPO Norms and as per direction of site incharge.
Grouting & fixing of stay rods (16x1800)mm including all work of excavation, cement concrete in size (0.60x0.60x0.30)m in ratio 1:4:8 cement, sand, 40mm brick ballast as per drg. Including back filling, proper ramming etc and fixing tightening & nozzling of stay wire with stay rod with the poles of required tension as per drawing as per RESPO Drawing/Norms by providing all grouting material and stay clamp made of M.S. Flat of size 50x6mm with proper size bolts & nuts & loops, and as per direction of site incharge.
Earthing of supports with MS earth Rod of (20x2540)mm long including excavation of pit and driving M.S. Rod 3.0 M apart from support and 0.5m below the ground level and connection below the earth electrodes with the help of G.I. wire & earthing lugs as per RESPO Drawing/Norms by providing proper size nuts & bolts, and as per direction of site incharge.
Grouting of ST/PCC supports in CC 1:4:8 (Cement, sand & 40mm brick ballast) Grouting will be done in the block of size (450x450)mm x1/6th of full length of the support, up to ground level, 300mm plinth above the ground level with CC 1:3:6 (Cement, core sand and Stone grit) with mufting as per drawing, work includes back filling & proper ramming by providing all required grouting materials and as per direction of site incharge.
Construction of T/F plinth suitable for 250/400KVA T/F (size of 2 x 2 x 1.5 mt.) as per drawing, cc work in foundation in ratio 1:4:8 (Cement, Sand & Brick ballast). Ist class brick work in side walls cc ratio of 1:4 (cement & fine sand). 12mm thick plaster in ratio 1:4 (cement & fine sand). The RCC work on top of plinth in ratio 1:2:4 after duly filling of brick ballast inside the plinth & ramming the same, including cost of all material & labour.
Construction of safety fencing (MS) for Transformer 11/0.4 KV Sub Station, With supply of material required for MS fencing (50X50X3 MM) M.S. wire mesh construction utilizing vertical post duly grouted/fitted in ground/on floor. Horizontal angle/T-iron to be fitted on vertical posts. Pickets (if required) fitted to rail and gate to facilitate entry and exit. The vertical Posts/Horizontal post shall be made of M.S. angle 75x75x6mm. Such post shall be kept preferably at distance of 800-1000 MM. and shall be grounded with CC ratio 1:4:8. The length of vertical post shall be sufficient to take care of fencing as requirement at site, and as per direction of site incharge.
Providing and installation of maintenance free multifaceted proactive and corrosion free chemical earthing electrod size 80mm x 3000mm complete with 50KG backfill compound with all required accessories for Body earthing of Transformers, including cost of M.S. earth strip for connection the earth strip will be welded to the earthing and neutral support, as per RESPO/Norms and as per direction of site incharge.
Dismantling & Removal of old existing PCC pole after digging of pit and opening of all accessories and back carriage to JE Store.
Shifting of 250/400KVA T/F-01Nos. including Removal/mounting and completion work properly as per RESPO Norms and as per direction of site incharge.
Dismantling of existing Line and old & used conductor and service connection cable, opening of all accessories. (STP Scrap 3300Kg., Dog Conductor-200Kg, Weasel-1180Kg., 3x120Sqmm XLPE cable-500kg and ABC-570Kg, including carriage of above material form site of work to JE Store/ESC-Hapur, with loading and unloading at both ends on Kachha Packka road.
Jumpering and line energisation work properly as per RESPO/Norms.
AAYANSH ELECTRICAL SOLUTIONS
Yash Contractor
M S Electricals
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .