Tender Value
₹8.0 Cr
EMD Value
₹15.9 L
Closing Date
30 Jul 2026, 1:00 pm4d left
SE SIX CIRCLE LUCKNOW
Office of SE Six circle lucknow
Janpad hardoi me hardoi khand sharda nahar hardoi ke antargat Peng rajwaha ki kshatigrast pakki sanrachnao ke punarnirman karya
2026_UPIDC_1171146_3
03/SE-6/2026-27
Open Tender
Civil Works
Item Rate
450 days
Hardoi
please refer tender document
2 documents required · 2 mandatory
₹2,714
₹15.9 L
Office of SE Six circle lucknow
21 Jul 2026
21 Jul 2026
30 Jul 2026
21 Jul 2026
30 Jul 2026
21 Jul 2026
23 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | E/W in road diversion including all lead & lift with mannual compaction and dressing etc. As per direction of Engg. In charge. | 20,851.91 | Cum | - | - |
| 2 | Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granlar material including fixing with cement morter 1:2 but excluding excavation, protection works, backfilling concrete and masonry works in head walls and parapets. (1000 MM dia) | 102.52 | Rmt | - | - |
| 3 | Earth work in excavtion in foundation in ordinary soil including 30m lead & 1.5m lift with back filling and As per direction of Engg. In charge. | 9,198.99 | Cum | - | - |
| 4 | Providing & laying C.C. 1:3:6 in foundation with cement coarse sand stone ballast 20-40mm gauge i/c proper curing and compaction etc. And i/c cost of all material, labour and T&P etc. For proper completion of work. | 770.78 | Cum | - | - |
| 5 | Centering and shuttering for RCC work including rent of shuttering, material, labour and T&P required for proper completion of work for slab, and wall etc. (Only steel shuttering should be used) | 1,945.76 | Sqm | - | - |
| 6 | Providing Steel reinforcement including cutting, bending, binding & placing in position. i/c cost of all material, labour and T&P etc. For proper completion of work.
12 mm dia | 23.16 | MT | - | - |
| 7 | Providing Steel reinforcement including cutting, bending, binding & placing in position. i/c cost of all material, labour and T&P etc. For proper completion of work.
10 mm dia | 11.96 | MT | - | - |
| 8 | Providing & laying R.C.C. 1:1.5:3 with cement, coarse sand & stone grit 20mm gauge i/c proper curing and compaction etc. And i/c cost of all material, labour and T&P etc. For proper completion of work. Concreting should be done by transit mixer | 424.86 | Cum | - | - |
| 9 | Providing & laying R.C.C. 1:1:2 with cement, coarse sand & stone grit 20mm gauge i/c proper curing and compaction etc. And i/c cost of all material, labour and T&P etc. For proper completion of work. Concreting should be done by transit mixer | 407.32 | Cum | - | - |
| 10 | M-150 of brick work of masonry in 1:4 CM cement sand mortar including cost of all material, labour and T&P etc. required for proper completion of work and work shall be carried out as drawing provided and direction of Engineer-incharge | 1,392.38 | Cum | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.07 MB
BIDDOCpenglot3.pdf
Tender Documents • 1.65 MB
BOQ_2198236.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].