Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.9 CrAccepted-Finance CHANDAULI | UTTAR PRADESH | 221009 | ₹5.9 Cr | L1 | Accepted-Finance QUOTED LOWEST AMOUNT |
| 2 | L2₹6.0 Cr+₹4.3 L (0.73%)Rejected-Finance 121004 | ₹6.0 Cr+₹4.3 L (0.73%) | L2 | Rejected-Finance QUOTED HIGHER RATE THAN L1 |
| 3 | L3₹6.2 Cr+₹23.7 L (4.00%)Rejected-Finance | ₹6.2 Cr+₹23.7 L (4.00%) | L3 | Rejected-Finance QUOTED HIGHER RATE THAN L1 |
| 4 | Rejected-Technical KRISHNA COMPLEX JAIN COLLEGE ROAD SAHARANPUR UTTAR PRADESH PIN CODE 247001 | SAHARANPUR | SAHARANPUR | UTTAR PRADESH | 247001 | - | - | Rejected-Technical Technically disqualified |
| 5 | Rejected-Technical GIJROLI DY LIKELY RELATED TO THE WORK LOCATION MENTIONED SPECIFIC ADDRESS NOT PROVIDED FOR THE CONTRACTOR | DAMAN | THE DADRA AND NAGAR HAVELI AND DAMAN AND DIU | 396210 | - | - | Rejected-Technical Technically disqualified |
| Sl No | Description | Qty | Unit | M/S KUMAR MANGLAM CONSTRUCTION L2 | M/S PRABHAT TRADERS L3 | ARVIND KUMAR SINGH L1 |
|---|---|---|---|---|---|---|
| 1.00 | E/W in road diversion including all lead & lift with mannual compaction and dressing etc. As per direction of Engg. In charge. | 20,851.91 | Cum | 15 ₹3,12,778.65 Lowest | 40 ₹8,34,076.4 | 47 ₹9,80,039.77 |
| 2.00 | Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granlar material including fixing with cement morter 1:2 but excluding excavation, protection works, backfilling concrete and masonry works in head walls and parapets. (1000 MM dia) | 102.52 | Rmt | 1,000 ₹1,02,520 Lowest | 5,000 ₹5,12,600 | 6,000 ₹6,15,120 |
| 3.00 | Earth work in excavtion in foundation in ordinary soil including 30m lead & 1.5m lift with back filling and As per direction of Engg. In charge. | 9,198.99 | Cum | 25 ₹2,29,974.75 Lowest | 50 ₹4,59,949.5 | 90 ₹8,27,909.1 |
| 4.00 | Providing & laying C.C. 1:3:6 in foundation with cement coarse sand stone ballast 20-40mm gauge i/c proper curing and compaction etc. And i/c cost of all material, labour and T&P etc. For proper completion of work. | 770.78 | Cum | 5,300 ₹40,85,134 Lowest | 8,000 ₹61,66,240 | 8,500 ₹65,51,630 |
| 5.00 | Centering and shuttering for RCC work including rent of shuttering, material, labour and T&P required for proper completion of work for slab, and wall etc. (Only steel shuttering should be used) | 1,945.76 | Sqm | 500 ₹9,72,880 Lowest | 500 ₹9,72,880 Lowest | 530 ₹10,31,252.8 |
| 6.00 | Providing Steel reinforcement including cutting, bending, binding & placing in position. i/c cost of all material, labour and T&P etc. For proper completion of work.
12 mm dia | 23.16 | MT | 98,580 ₹22,83,112.8 | 90,000 ₹20,84,400 | 80,000 ₹18,52,800 Lowest |
| 7.00 | Providing Steel reinforcement including cutting, bending, binding & placing in position. i/c cost of all material, labour and T&P etc. For proper completion of work.
10 mm dia | 11.96 | MT | 99,140 ₹11,85,714.4 | 90,000 ₹10,76,400 | 80,000 ₹9,56,800 Lowest |
| 8.00 | Providing & laying R.C.C. 1:1.5:3 with cement, coarse sand & stone grit 20mm gauge i/c proper curing and compaction etc. And i/c cost of all material, labour and T&P etc. For proper completion of work. Concreting should be done by transit mixer | 424.86 | Cum | 6,900 ₹29,31,534 Lowest | 10,000 ₹42,48,600 | 9,500 ₹40,36,170 |
| 9.00 | Providing & laying R.C.C. 1:1:2 with cement, coarse sand & stone grit 20mm gauge i/c proper curing and compaction etc. And i/c cost of all material, labour and T&P etc. For proper completion of work. Concreting should be done by transit mixer | 407.32 | Cum | 6,950 ₹28,30,874 Lowest | 10,000 ₹40,73,200 | 10,000 ₹40,73,200 |
| 10.00 | M-150 of brick work of masonry in 1:4 CM cement sand mortar including cost of all material, labour and T&P etc. required for proper completion of work and work shall be carried out as drawing provided and direction of Engineer-incharge | 1,392.38 | Cum | 7,000 ₹97,46,660 | 6,500 ₹90,50,470 | 6,200 ₹86,32,756 Lowest |
Tender Value
₹8.0 Cr
EMD Value
₹15.9 L
Closing Date
30 Jul 2026, 1:00 pmClosed
SE SIX CIRCLE LUCKNOW
Office of SE Six circle lucknow
Janpad hardoi me hardoi khand sharda nahar hardoi ke antargat Peng rajwaha ki kshatigrast pakki sanrachnao ke punarnirman karya
2026_UPIDC_1171146_3
03/SE-6/2026-27
Open Tender
Civil Works
Item Rate
450 days
Hardoi
please refer tender document
2 documents required · 2 mandatory
₹2,714
₹15.9 L
Office of SE Six circle lucknow
17 Aug 2026
21 Jul 2026
30 Jul 2026
21 Jul 2026
30 Jul 2026
21 Jul 2026
23 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | E/W in road diversion including all lead & lift with mannual compaction and dressing etc. As per direction of Engg. In charge. | 20,851.91 | Cum | - | - |
| 2 | Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granlar material including fixing with cement morter 1:2 but excluding excavation, protection works, backfilling concrete and masonry works in head walls and parapets. (1000 MM dia) | 102.52 | Rmt | - | - |
| 3 | Earth work in excavtion in foundation in ordinary soil including 30m lead & 1.5m lift with back filling and As per direction of Engg. In charge. | 9,198.99 | Cum | - | - |
| 4 | Providing & laying C.C. 1:3:6 in foundation with cement coarse sand stone ballast 20-40mm gauge i/c proper curing and compaction etc. And i/c cost of all material, labour and T&P etc. For proper completion of work. | 770.78 | Cum | - | - |
| 5 | Centering and shuttering for RCC work including rent of shuttering, material, labour and T&P required for proper completion of work for slab, and wall etc. (Only steel shuttering should be used) | 1,945.76 | Sqm | - | - |
| 6 | Providing Steel reinforcement including cutting, bending, binding & placing in position. i/c cost of all material, labour and T&P etc. For proper completion of work.
12 mm dia | 23.16 | MT | - | - |
| 7 | Providing Steel reinforcement including cutting, bending, binding & placing in position. i/c cost of all material, labour and T&P etc. For proper completion of work.
10 mm dia | 11.96 | MT | - | - |
| 8 | Providing & laying R.C.C. 1:1.5:3 with cement, coarse sand & stone grit 20mm gauge i/c proper curing and compaction etc. And i/c cost of all material, labour and T&P etc. For proper completion of work. Concreting should be done by transit mixer | 424.86 | Cum | - | - |
| 9 | Providing & laying R.C.C. 1:1:2 with cement, coarse sand & stone grit 20mm gauge i/c proper curing and compaction etc. And i/c cost of all material, labour and T&P etc. For proper completion of work. Concreting should be done by transit mixer | 407.32 | Cum | - | - |
| 10 | M-150 of brick work of masonry in 1:4 CM cement sand mortar including cost of all material, labour and T&P etc. required for proper completion of work and work shall be carried out as drawing provided and direction of Engineer-incharge | 1,392.38 | Cum | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.07 MB
BIDDOCpenglot3.pdf
Tender Documents • 1.65 MB
BOQ_2198236.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .