Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.4 CrAccepted-AOC | ₹1.4 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹1.5 Cr+₹9.9 L (6.88%)Rejected-Finance 0 NERTHUA RAEBARELI UTTAR PRADESH 229103 | RAE BARELI | UTTAR PRADESH | 229103 | ₹1.5 Cr+₹9.9 L (6.88%) | L2 | Rejected-Finance REJECTED BEING NOT L1 |
| 3 | Rejected-Technical | - | - | Rejected-Technical NO DOCUMENTS FOR SIMILAR NATURE OF WORK EXPERIENCE UPLOADED |
| 4 | Rejected-Technical 11 GURU NANAK MARKET AMBALA ROAD SAHARANPUR 247001 | SAHARANPUR | UTTAR PRADESH | 247001 | - | - | Rejected-Technical NO DOCUMENTS FOR SIMILAR NATURE OF WORK EXPERIENCE UPLOADED |
| 5 | Rejected-Technical SIDDHAI 96 2 A WARD DUDHALI KOLHAPUR 416012 MAHARASHTRA | KOLHAPUR | MAHARASHTRA | 416012 | - | - | Rejected-Technical NO DOCUMENTS FOR SIMILAR NATURE OF WORK EXPERIENCE UPLOADED |
Tender Value
₹1.4 Cr
EMD Value
₹2.2 L
Closing Date
15 Feb 2025, 6:00 pmClosed
COL S P SINGH
CWE AF LOHEGAON, PUNE - 411032
REMOVAL OF RUBBER AND PAINT DEPOSITS AND APPLICATION OF POLYMER MODIFIED EMULSION (PME) ON RUNWAY SURFACES UNDER GE (AF) LOHEGAON AT 2 WG AIRFORCE STATION PUNE
2025_MES_692893_1
81945/E8
Open Tender
Civil Works
Item Rate
180 days
GE AF LOHEGAON
Please refer Tender documents.
6 documents required · 6 mandatory
₹1,000
Yes
GE AF LOHEGAON
₹2.2 L
Yes
5 May 2025
11 Jan 2025
22 Feb 2025
11 Jan 2025
15 Feb 2025
3 Feb 2025
Amount
M&L for Removal of paint deposits from runway surface using Water blasting cum vacuuming machine with suitable operating pressure so that the total paint deposits are removed from the runway surfaces (both rigid and flexible) by the method of water blasting cum vacuuming system with suitable water pressure without use of any chemical & without any damage to the existing surface complete all as specified and directed by Engineer in Charge
M&L for Removal of Rubber deposits from runway surface using Water blasting cum vacuuming machine with suitable operating pressure so that the total Rubber deposits are removed from the runway surfaces (both rigid and flexible) by the method of water blasting cum vacuuming system with suitable water pressure without use of any chemical & without any damage to the existing surface complete all as specified and directed by Engineer in Charge Note : Ref PS Clause No 5.1.(iii) for details of equipment
NOTES:(i) The work shall be carried out through authorized & qualified applicator (ii) Total rubber/paint deposit should be removed and the debris / water vacuumed simultaneously leaving no FOD so that the Runway is available for operation immediately. (iii) Rubber/paint deposit debris should be in solid form when finally disposed. (iv) In any emergency condition the machine should exit from the runway in less than 2 mins without leaving FOD. (v) Friction Test should be carried out using portable friction testing machine before & after Rubber deposit removal operation. (vi) After carrying out rubber removal operation on the runway, the friction reading of the rubber/paint removed segment should be minimum 0.55 µ. (vii) The surface of both concrete / bitumen (rigid/flexible) shall not get any kind of damages during the process of rubber removal nor to any adjoining areas, joint filling etc. Damages made if any, shall be made good by the contractor as per the specifications of the Engr - in - charge without any extra cost. (viii) Work will be carried out in phase manner as per availability of runways . (ix) Proper agreement should be done with the owner of the machine.
M&L for Applying evenly one coat of solution of Polymer modified emulsion (PME) of approved make on Bituminous portion of Runway as specified and directed. Note: a) Solution of One Ltrs of diluted solution of Polymer Modified Emulsion (PME) with water in the ratio 1:1 will be applied on the decided place with a maximum coverage area of 1.00 Sqm. b). Application of PME should be done through authorized agency by Mechanical Spraying machine with Spray Nozzle Assembly mounted in 30mm dia carbon Fiber Reinforced Flexible Pipe(CFRP).
M & L for preparation of surface of any description and painting adequate no. of coats of Lines, dashes, arrows, letters etc on Bituminous / Concrete portion of Runway surface, pavements and the like exc 10cm wide with water based road marking paint (white, yellow etc.) of approved make.
M & L for Racking out extg. Joints , width of joints exc 10 mm but n exc. 15 mm wide and depth of joints exc 15 mm but n exc. 25 mm deep of slabs of pavements for removing old damaged sealant from joints cleaning the surfaces by means of air compressor or vacuum cleaner and M&L for joint filling with polyurethene sealant conforming to BS - 5212 (type FB) after applying primer and masking tape on front edge of joints to prevent accidental spillage of sealant on top surfaces and to give a neat finish to the sealant including required back up rod and removing masking tape after sealent has been applied complete all as specified and directed.
M & L for Racking out extg. Joints , width of joints exc 15mm but n exc. 40 mm wide and depth of joints exc 20 mm but n exc. 30 mm deep of slabs of pavements for removing old damaged sealant from joints cleaning the surfaces by means of air compressor or vacuum cleaner and M&L for joint filling with polyurethene sealant conforming to BS - 5212 (type FB) after applying primer and masking tape on front edge of joints to prevent accidental spillage of sealant on top surfaces and to give a neat finish to the sealant, including required back up rod and removing masking tape after sealent has been applied complete all as specified and directed.
Note for Ser Item No 1.00 to 6.00: 1) Entire work is to be carried out at day and night as specified and directed by the Engr - in - charge . 2) Machines for Rubber/ Paint removal and PME should be kept at site upto the completion of the contract or as directed by the Engr -in - charge . 3) Rubber removal along with paint removal will be carried out in more than one phases as per the deposition of rubber and direction of ATS section. Minimum quantity in each phase will be 6000 SQM of rubber removal and 1000 SQM for paint removal. 4) For each phase of rubber and paint removal on runway, contractor’s machinery for carrying out rubber and paint removal has to reach within 15 days and should start working from intimation date through mail or letter. Failing the same will be considered as slow progress of work. 5) During execution of rubber and paint removal, site will be made available as per flying schedule and as per direction of ATS section.
M/s Kirti Enterprises (BID ID -3232305)
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .