| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.5 LAccepted-AOC VILLAGE KARAMGARH DISTT SIRSA | SIRSA | HARYANA | 125054 | L1 | Accepted-AOC allotted | |
| 2 | L2₹9.7 L+₹7,837.96 (0.82%)Rejected-AOC | L2 | Rejected-AOC 2nd |
Tender Value
₹8.4 L
EMD Value
₹16,780
Closing Date
12 May 2022, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer Ghaggar Water Services Division
Executive Engineer Ghaggar Water Services Division Sirsa
Reconstruction of V.R. Bridge at RD 760 of Harni Minor
2022_HRY_219021_1
02/VR Bridge Harni Minor
Open Tender
Civil Works
Item-rate/Agreement basic
90 days
Sirsa
Please refer Tender documents.
4 documents required · 4 mandatory
₹1,000
₹16,780
Yes
29 Jun 2022
4 May 2022
13 May 2022
4 May 2022
12 May 2022
4 May 2022
90 days
Amount
Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material as per clause 304 of MORT&H specifications Ordinary soil, up to 3mtr depth by mechanical means
Brick work with common burnt clay non-modular bricks of class designation 10 in foundation and plinth in:Cement mortar 1:4 (1 cement: 4 coarse sand)
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work below plinth level and up to Floor IV level:1 :4: 8 ( 1 Cement : 4 coarse sand (zone-Ill) : 8 graded stone aggregate 40 mm nominal size)
PCC Grade M15 (with concrete Mixer) Height up to 5m
RCC Grade M20 Height up to 5m Using concrete Mixer
Supplying, fitting and placing HYSD bar reinforcement in sub-structure complete as per drawing and MoRT&H specifications
Centering and shuttering including strutting, propping etc. and removal of form work for :Foundations, footings, bases for columns
Filling expansion joints, with special impervious hot pour, 12.5 per metre mm wide.
Reinforced cement concrete approach slab including reinforcement and formwork complete as per drawing and MoRT&H specification clause 1500, 1600, 1700 & 2704
PCC M15 Grade levelling course below approach slab complete as per drawing and MoRT&H MoRT&H specification clause 2700
Dismantling of flexible pavement by Mechanical Means. Bituminous course
Granular Sub-Base (Mix in place) Construction of granular sub-base by providing Material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with Rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per technical clause 401 of MORT&H technical specifications
Providing ,laying,spreading and compacting stone aggregates of specific sizes to water bound macadam specification i/c spreading in uniform thickness,hand packing,rolling with 3 whele steel/vibratory rollar 8-10 tonnes in stages to proper grade and camber,applying and brooming requisity type of screening /binding materiel to fill up the interstices of course agg.,watering and compacting to the required density complete as per 404 of MORT&H technical specifications.
Providing and applying tack coat with penetretion grade bitumen VG-10 using bitumen pressure distrebutor at the rate of 0.30 Kg per sqm on the prepared bitumenous/granular surface cleaned with mechanical broom as per 503 of MORT&H technical specifications .
Providing and laying of premix sand seal coat premixed in continous type HMP of appropriate capacity not less than 75 tonnes/hours using specified fine agg. And panetration grade bitumen @0.68 kg/sqm laid to specified levels ,grade and cross fall complete as per 511 of MORT&H technical specifications.
Dressing bed and preparation of sub grade for lining by mechanical/ mannual means in bed
Dressing side slopes and preparation of sub grade for lining by mechanical/ mannual means in side slopes
Lining with design mix concrete of grade M-15 with minimum cement content 240kg/cum, 75mm thick in curve portion and side slope manually including rendering with cement sand (1 :3) slurry, form work, dressing and preparation of sub grade as per directions of Engineer-in-chargeIn Bed
Lining with design mix concrete of grade M-15 with minimum cement content 240kg/cum, 75mm thick in curve portion and side slope manually including rendering with cement sand (1 :3) slurry, form work, dressing and preparation of sub grade as per directions of Engineer-in-charge In slope
M-15 grade plain cement concrete (cement content .All works above plinth and up to floor IV levelconsidered @ 240 kg/cum)
Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge.
Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in - charge.
Demolishing R.C.C. work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 metres lead as per direction of Engineer - incharge.
Credit of old bricks
Credit of steel
LAL CHAND COMPANY
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .