| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.6 LAccepted-AOC | ₹4.6 L | L1 | Accepted-AOC Lowest Rate |
| 2 | L2₹5.4 L+₹83,367.99 (18.1%)Rejected-AOC | ₹5.4 L+₹83,367.99 (18.1%) | L2 | Rejected-AOC Highest Rate |
| 3 | L3₹5.6 L+₹94,337.46 (20.5%)Rejected-AOC | ₹5.6 L+₹94,337.46 (20.5%) | L3 | Rejected-AOC Highest Rate |
Tender Value
₹4.4 L
EMD Value
₹8,775
Closing Date
9 Feb 2026, 5:00 pmClosed
SATYA PRAKASH
Municipal Committee Dharuhera
Construction of Dog shelters in Garib Nagar in Ward No. 17 in MC Dharuhera.
2026_HRY_500270_1
20265BE08068 3383 4C7A ABFB 9F02F19B3E99332ULB
Open Tender
Civil Works
Works
60 days
Dharuhera
Construction of Dog shelters in Garib Nagar in Ward No. 17 in MC Dharuhera.
2 documents required · 2 mandatory
₹500
₹8,775
Yes
19 Mar 2026
3 Feb 2026
10 Feb 2026
3 Feb 2026
9 Feb 2026
3 Feb 2026
[10.100.1]Cement Concrete 1:8:16 Flooring 1. Cement Concrete 1:8:16 with Over burnt (Jhama) Brick Aggregate: 90 mm to 40 mm size in foundation and plinth. [Through Rate]
[11.8.2]12 mm cement plaster of mix : 2. 1:6 (1 cement: 6 coarse sand) [Through Rate]
[13.29.2]Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. 2. In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works [Through Rate]
[13.30.3]Steel work in built up tubular (round, square or rectangular hollow tubes etc.) trusses etc., including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete. 3. Electric resistance or induction butt welded tubes [Through Rate]
[17.69.3]Interlocking Concrete Block Pavement 3. Providing and Laying 60 mm thick ISI marked Interlocking Paver Blocks conforming to IS 15658:2006/IRC SP 63: 2004 of all shapes and colours in design mix cement M 35 over the bed of 25 mm thick fine sand complete in all respect. [Through Rate]
[3.1.2]By Mechanical Transport including loading, unloading and stacking 2. Earth [5km]
[4.12.1]Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead up to 50 m and lift up to 1.5 m, as directed by Engineer-in-charge. 1. All kinds of soil [Through Rate]
[4.33]Excavating, supplying and filling of local earth (including royalty) by mechanical transport up to a lead of 1 km also including ramming and watering of the earth in layers not exceeding 20 cm in trenches, plinth, sides of foundation etc. complete. [Through Rate]
[6.1.1]Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work below plinth level and up to Floor IV level: 1. 1:1½:3 (1 Cement: 1½ coarse sand (zone-III) : 3 graded stone aggregate 20 mm nominal size) [Through Rate]
[6.1.2]Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work below plinth level and up to Floor IV level: 2. 1:2:4 (1 cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size) [Through Rate]
[7.21.2]Brick work with common burnt clay non-modular bricks of class designation 10.5 in foundation and plinth in: 2. Cement mortar 1:6 (1 cement : 6 coarse sand) [Through Rate]
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.71 MB
BOQ_578875.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .