Tender Value
₹13.9 L
EMD Value
₹13,950
Closing Date
11 Mar 2024, 3:00 pmClosed
BLOCK DEVELOPMENT OFFICER (VP) ,MELANEELITHANALLUR
BLOCK DEVELOPMENT OFFICE ,MELANEELITHANALLUR
CONSTRUCTION OF CREMATION SHED AND APPROACH PATHWAY AT SERNDAMARAM VILLAGE OF SERNDAMARAM KASPA PANCHAYAT in Melaneelithanallur Panchayat Union.
2024_RDTN_437355_1
BDOMNLR/91/2024-B2
Open Tender
Civil Works
Works
90 days
BLOCK DEVELOPMENT OFFICE, MELANEELITHANALLUR
Please refer Tender documents.
3 documents required · 3 mandatory
₹13,950
BLOCK DEVELOPMENT OFFICER (VP) ,MELANEELITHANALLUR
₹13,950
Yes
11 Mar 2024
4 Mar 2024
11 Mar 2024
4 Mar 2024
11 Mar 2024
4 Mar 2024
Amount
CONSTRUCTION OF CREMATION SHED AND APPROACH PATHWAY AT SERNDAMARAM VILLAGE OF SERNDAMARAM KASPA PANCHAYAT
Earth work excavation and depositing on bank with in intial lead of 10m and initial lift of 2m in hard stiff clay,stiff black cotton soil, hard red earth,earth mixed with small sized boulders.
Foundation
Corewall/Platform
Cement Concrete 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of all materials to site, labour charges for mixing, laying, compacting and curing concrete etc., complete
Cement Concrete 1:2:4 mix using 20mm ISS HBG metal including cost and conveyance of all materials to site, labour charges for mixing, laying, compacting and curing concrete etc., complete
Filling Basement inner with Excavated earth other than sand including labour charges for filling, levelling, compacting, ramming, complying the standard specifications etc., complete
Supplying and filling with filling sand in layers not more than 15 cm thick including labour charges for Filling, Levelling, watering, well rammed and compacted etc., complete For Flooring Filling material
Brick work with cement mortar 1:5 mix using Country bricks for Foundation, Basement and Superstructure inculding cost and conveyance of all materials to site, labour charges for curing and other incidental charges etc ,complete
Supplying and erection Centering for sides and soffits inculding necessary supports and structing for plain surfaces such as RCC Slab, Lintel, Beam, Column, Sunshade including cost and coveyance of all materials to site and all other incidental charges etc complete.,
Reinforced Cement Concrete 1:1.5:3 using 20mm ISS HBG metal including cost and conveyance of all maerials to site and all labour charges for mixing concrete, placing, ramming, vibrating with mechanical vibrator, consolidation and Curing etc., complete as directed by departmental officers.
Supplying and fabrication of Steel Fe 415/500 grade required for all RCC item of works involved including fabrication and labour charges for Cutting, bending, tying, placing in position, includes overlaping length wherever required etc., complete.
Finishing the top of roof with one course of PRESSED TILES of size 23 cm X 23 cm X 2 cm laid in cement mortar 1:3 (One cement and three sand) 12mm thick mixed with water proofing compound conforming to I.S by 2% weight of cement used and the joint pointed neatly to full depth of tiles with same mortar mixed with water proofing compoud etc., complete.
Plastering with Cement Morter 1:3 mix, 10mm thick Smooth finish for Brick, RR masonry surface and other Concrete surfaces inculding cost and conveyance of all materials to site and all other labour charges, incidental charges etc., complete.
Plastering with Cement Morter 1:5 mix, 12mm thick Smooth finish for Brick, RR masonry surface and other Concrete surfaces inculding cost and conveyance of all materials to site and all other labour charges, incidental charges etc., complete.
Exterior Emulsion painting two coats with best approved quality and colour paint over one coat of Base coat including cost and convyance of all materials to work site and labour charges etc., complete.
Supplying & fixing with Cuddapah slabs 20-30mm thick for Cub boards & Shelfs at required location and pointed with cement mortar 1:3 including all incidental charges etc., complete.
SUB ESTIMATE-APPROACH PATHWAY
Earthwork excavation in all classes of Soils and Sub soils except hard rock requiring blasting including initial lead and lift, dressing the excavation upto bed level for Foundation as SS 20 B specification etc., complete
Supply and filling Gravel from approved quarry for Base layer in layers not more than 15mm thick, including cost of material, labour charges for filling, levelling, sectioning and compacting etc., complete as directed by officers.
Cement Concrete 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of all materials to site, labour charges for mixing, laying, compacting and curing concrete etc., complete - Base Concrete
Brick work with cement mortar 1:5 mix using Country bricks for Foundation, Basement and Superstructure inculding cost and conveyance of all materials to site, labour charges for curing and other incidental charges etc ,complete.
Cement Concrete 1:2:4 mix using 20mm ISS HBG metal including cost and conveyance of all materials to site, labour charges for mixing, laying, compacting and curing concrete etc., complete
Plastering with Cement Morter 1:5 mix, 12mm thick Smooth finish for Brick, RR masonry surface and other Concrete surfaces inculding cost and conveyance of all materials to site and all other labour charges, incidental charges etc., complete
Supplying and fixing Bituman Tarsheet 15mm thick for expansion joints at every 4.50m intervals inculding cost of material conveyance to site,cutting finishing etc., complete.
MR.S.PONRAJ
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .