Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
Tender Value
₹1.7 L
EMD Value
₹3,420
Closing Date
4 Jun 2022, 4:00 pmClosed
Executive Engineer, ED-3rd srinagar
Office of Executive Engineer, ED-3rd srinagar
Construction of Water closet Bathroom at Divisional Store Bemina, ED-3rd (Turnkey Basis)
2022_PDD_167129_1
ED-III /02 of 2022-23, Dated- 19-04-2022
Open Tender
Civil Works
Turn-key
15 days
Office of Executive Engineer, ED-3rd srinagar
Refer SBD
6 documents required · 6 mandatory
₹500
Executive Engineer, ED-3rd srinagar
₹3,420
25 Jun 2022
19 Apr 2022
6 Jun 2022
19 Apr 2022
4 Jun 2022
23 Apr 2022
20 Apr 2022 - 4 Jun 2022
Amount
Description
Earth work in bulk excavation by manual means over areas Trenches (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge for all kinds of soil
Providing & Laying stone Soiling 63 mm to 45 mm
Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size)
Random Rubble masonry with hard stone in foundation and plinth including leveling up with cement concrete 1:6:12 (1 Cement : 6 coarse sand : 12 graded stone aggregate 20mm nominal size) upto plinth level and curing complete with Cement mortar 1:6 (1 Cement : 6 coarse sand) for W/C Bathroom
Dry random rubble masonry with hard stone in foundation and plinth With bond stone -Quarry for Sockage Pit Sockage Pit=3.14/4x{(6)2-(5)2}x10 ' = 86.35 cft = 2.445 Cum
Providing and laying damp-proof Course 50 mm thick with cement concrete 1:2:4 (1 cement:2 coarse sand: 4 graded stone aggregate 20 mm nominal size) and curing complete Details: 2x8'x1'=16 Sft 2x6'x1 =12 Sft Total = 28 Sft
Filling available excavated earth for W.C Bathroom.
Brick work with common burnt clay (non-modular) bricks of class designation 7.5 in foundation and plinth including curing in Cement mortar 1:6 ( 1 cement : 6 coarse sand)
Extra Brick work for Bathroom Details = 120 + 88 Sft = 208x9''=156 Sft
R.C.C Cement concrete slab for W.C Bathroom and S. Tank 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)
Steel reinforcement for R.C.C. work for Slabs Thermo-Mechanically Treated bars of grade Fe-500D or more
Centering and shuttering including strutting, propping etc. and removal of form work for W/C Bathroom & S Tank
Centering and shuttering including strutting, propping etc. and removal of form for Edges of slabs Under 20 cm wide
Cement plaster 15 mm thick (1:4)mix W/C Bathroom
Providing and fixing of Door and window frame First class kail wood
Providing and fixing panelled or panelled and glazed shutters for doors, windows and clerestory windows fixing with butt hinges of required size with necessary screws, excluding panelling First class kail wood 35 mm thick
M/S ZAHOOR AHMAD FAFOO
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .