Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.3 LAccepted-AOC | L1 | Accepted-AOC ADMITTED | |
| 2 | L2₹9.3 L+₹1,868.36 (0.20%)Rejected-AOC | L2 | Rejected-AOC REJECTED |
Tender Value
₹9.6 L
EMD Value
₹10,000
Closing Date
20 Dec 2022, 3:00 pmClosed
THE BLOCK DEVELOPMENT OFFICER VP
BLOCK DEVELOPMENT OFFICE VEPPANAPALLI BLOCK
Krishnagiri Dt Veppanapalli Block 1 Nos of works Desilting of Pudhu Eri and Strengthinig of bund repair of sluice surplus weir at K N Podur Bathimadugu Panchayat Package No VPN-AGAMT-01
2022_RDTN_270225_1
ROC NO_1706_22_E1_DT_15_11_22
Open Tender
Civil Works - Others
Item Rate
180 days
BLOCK DEVELOPMENT OFFICE VEPPANAPALLI
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹10,000
BDO OFFICE VEPPANAPALLI
3 Feb 2023
6 Dec 2022
20 Dec 2022
6 Dec 2022
20 Dec 2022
6 Dec 2022
14 Dec 2022
Amount
1.Desilitng of Pudhu eri and Strenthing of bund, Repair of slucie and repair of surplus weir at K.N.Pudhur H/O Bathimadagu-Rs.9.60/- Lakhs
Clearing the light jungle and removed away from the site including all cutting charges and all labour charges as per standard specification
Earth work in all Soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100m deploying earth moving machinery and tippers including benching, formation of bunds, breaking clods, sectioning etc., complete.
Frmation of Fore Bund by duming the exce earth excavated soil after bund strengthening etc., completed.
Earth work in all Soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100m deploying earth moving machinery and tippers including benching, formation of bunds, breaking clods, sectioning etc., complete.
Provisio for Reparing Weir
Earth work in all Soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100m deploying earth moving machinery and tippers including benching, formation of bunds, breaking clods, sectioning etc., complete.
Cement concrete 1 : 4 : 8 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed
Supplying and erecting steel centering for plane surfaces in foundation and basement for staircase steps column footings plinth beam grade beam etc.,
Cement concrete 1 : 3 : 6 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.
Cement concrete 1 : 1.5 : 3 mix using 20mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.
Plastering with CM 1:4 20mm thick over the cement concrete for floor finish including curing etc.,
Provisio for New Revetment
Earth work in all Soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100m deploying earth moving machinery and tippers including benching, formation of bunds, breaking clods, sectioning etc., complete.
Cement concrete 1 : 4 : 8 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed
Supplying and erecting steel centering for plane surfaces in foundation and basement for staircase steps column footings plinth beam grade beam etc.,
Cement concrete 1 : 3 : 6 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.
Rough stone dry packing for aprons and revetments, including all cost and conveyance of men and materials etc.,
Provision for Boundary Stones
Provision for Name Board Charegs
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Murugesan Contractor
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .