Loading…
Loading…
Tender Value
₹17 L
EMD Value
₹34,000
Closing Date
20 Aug 2026, 12:00 pmClosed
GRAM PANCHAYAT SWAROOPDESAR
OFFICE OF GRAM PANCHAYAT SWAROOPDESAR, PANCHAYAT SAMITI BIKANER
GRAM PANCHAYAT SWAROOPDESAR PHED PARISAR ME JALHOD NIRMAN KARYE SWAROOPDESAR
2026_PRD_587700_1
GP_SWAR_02_41-52
Open Tender
Civil Works
Percentage
250 days
GRAM PANCHAYAT SWAROOPDESAR
Please refer Tender documents.
3 documents required · 3 mandatory
₹500
SARPANCH GRAM PANCHAYAT SWAROOPDESAR, MD RISL JAIP
₹34,000
Yes
20 Aug 2026
14 Aug 2026
20 Aug 2026
14 Aug 2026
20 Aug 2026
14 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in foundation excavation up to 1.5m, ramming bottom, dressing sides, back filling and disposal of surplus soil with in a lead of 50m. In hard soil | 95.07 | Cum | 178.46 | ₹16,965.6 |
| 2 | Cement concrete in foundation and plinth with stone ballast size 20mm including curing and comp. etc in 1:3:6 mix | 21.84 | Cum | 3,774.97 | ₹82,438.17 |
| 3 | Reinforced cement concrete work including curing compaction, finishing with rendering in cement sand mortar 1:3 and making good and joints excluding cost of centering, shuttering and reinforcement in 1:1.5:3 (1cement: 1.5course sand: 3- graded stone aggregate 20mm nominal size) in foundation | 28.92 | Cum | -215.78 | - |
| 4 | Reinforced cement concrete work including curing compaction, finishing with rendering in cement sand mortar 1:3 and making good and joints excluding cost of centering, shuttering and reinforcement in 1:1.5:3 (1cement: 1.5course sand: 3- graded stone aggregate 20mm nominal size) in foundation | 81.28 | Cum | 5,570.29 | ₹4,52,731.45 |
| 5 | Providing and fabricating reinforcement for RCC work including straightening, cutting, bending, placing in position and binding (including cost of binding wire) in foundation and super structure up to 4.5m height above plinth level hot rolled deformed (IS: 1139) cold twisted (IS: 1786) bars | 6,321.86 | Kg | 97.94 | ₹6,19,162.96 |
| 6 | Centering and shuttering with with plywood or steel sheets including strutting, propping, bracing both ways with wooden members and removal of from work | 466.42 | Sqm | 319.04 | ₹1,48,805.23 |
| 7 | Add extra for Shuttering in circular work in plan up to 10mm dia 20% extra PWD BSR 2026 | 466.42 | Sqm | 63.81 | ₹29,761.04 |
| 8 | Centering and shuttering with steel sheets including strutting, propping, bracing for top dome etc PWD BSR for 4.10.5 (PWD BSR 2026 Less10%) | 109.42 | Sqm | 870.3 | ₹95,230.58 |
| 9 | Finishing walls with Acrylic Smooth Exterior Paint of Required Shade Including All Scaffolding New work (Two Or More Coat including base coat of water proofing cement Paint) PWD BSR 2022 Less 10% | 269.81 | Sqm | 77.4 | ₹20,883.28 |
| 10 | Providing and fixing steel gate, gratings and Grills made of angles Tees, square bars or other flats, black pipes with hold fast and fitting complete as per design including cutting, welding and fabrication with priming coat of redoxide | 320 | Kg | 116.9 | ₹37,408 |
stage.html
html • 0.03 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.00 MB
Tendernotice_1.pdf
PDF • 1.03 MB
BOQ_1043635.xls
BOQ • 0.28 MB
jalhodbid01.pdf
Tender Documents • 11.79 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .