Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹75.9 LAdmitted-Finance | +0.00% | ₹75.9 L | L1 | Admitted-Finance |
| 2 | L1₹75.9 LAdmitted-Finance | +0.00% | ₹75.9 L | L1 | Admitted-Finance |
| 3 | L1₹75.9 LAdmitted-Finance | +0.00% | ₹75.9 L | L1 | Admitted-Finance |
Tender Value
₹75.9 L
EMD Value
₹76,000
Closing Date
30 May 2026, 5:00 pmClosed
Executive Engineer,Div-II
Bikash Bhawan,Jagannath Lane,Badambadi-753012
Diversion of storm water coming from Ravenshaw College Gate No.3 and its upstream side to police out post into MSWC No.1 by pumping through the bridge at Chhatrabazar.
2026_ORULB_128800_2
MC(CMC)CTC_Div-IINo8/2026-27
Open Tender
Civil Works - Others
Percentage
90 days
CMC
Please refer Tender documents.
2 documents required · 2 mandatory
₹11,800
₹76,000
Yes
14 Aug 2026
19 May 2026
3 Jun 2026
19 May 2026
30 May 2026
19 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling and cement concrete removing including stacking the useful materials for reuse and removing the debris within 50m lead | 1 | Cum | 858.6 | ₹857.74 |
| 2 | Earth work in all kinds of soil within 50m initial lead & 1.5m initial lift including rough dressing & breaking clods to maximum 5cm to 7cm & laying in layers not exceeding 0.3m in depth & as per direction of the engineer in-chargeSump 1st depth | - | Cum | 247.13 | - |
| 3 | Sump 2nd depth | - | Cum | 299.52 | - |
| 4 | Sump 3rd depth | - | Cum | 407.41 | - |
| 5 | Supplying & Filling in foundatin and plinth with sand watered and rammed including cost conveyance, royalty & labour etc. | 1 | Cum | 612.7 | ₹612.09 |
| 6 | Cement concrete (1.4.8) with 4cm Size crusher broken hard Granite metal including cost of all labour, matenals with all taxes, lead,T & P etc all complete | 50.69 | Cum | 6,003.7 | ₹3,04,327.55 |
| 7 | Cement concrete (1:2:4) with 12mm size crusher broken hard granite metal including cost of all labour, materials with all taxes lead, T & P etc all complete | 39.3 | Cum | 8,041.7 | ₹3,16,038.81 |
| 8 | R.C.C work in ground floor of M-20 grade with 20mm & down grade crusher broken hard 6 Granite chips hoisting & laying with cost of all labour, materials with all taxes, lead T & Petc all complete | 34.33 | Cum | 6,552.1 | ₹2,24,933.59 |
| 9 | Supplying fitting and placing uncoated HYSD bar reinforcement complete as per drawing and specification technical | 50.33 | Qntl | 9,395.3 | ₹4,72,865.45 |
| 10 | Rigid smooth Centering R CC Foundation, Plinth Band Footings, Column Base, Mass Concrete & Precast Slabs (Ground Floor) | - | Sqm | 248.7 | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 5.68 MB
BOQ_591882.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .