Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.2 LAccepted-Finance | L1 | Accepted-Finance Quoted value is Less | |
| 2 | L2₹3.6 L+₹43,542 (13.8%)Rejected-Finance | L2 | Rejected-Finance Quoted value is High | |
| 3 | L3₹3.9 L+₹74,585 (23.6%)Rejected-Finance | L3 | Rejected-Finance Quoted value is High | |
| 4 | L4₹3.9 L+₹78,814 (25.0%)Rejected-Finance | L4 | Rejected-Finance Quoted value is High | |
| 5 | L5₹3.9 L+₹79,236 (25.1%)Rejected-Finance | L5 | Rejected-Finance Quoted value is High |
Tender Value
₹4.7 L
EMD Value
₹4,800
Closing Date
15 Sept 2026, 10:30 amClosed
DE (H) C and M Chennai City Roads Division I
O/o the DE (H) C and M Chennai City Roads Division I Chennai-15
Repair and Refixing the Footpath and Repaving Work for the Roads Maintained by City Roads Section - V of CCR Division - I for the Year 2026-27
2026_HWAY_698657_1
TN.05/Sl.No.10/CCR DIVISION-I/Non Plan Work 2026-27
Open Tender
Civil Works - Highways
Percentage
90 days
Chennai
Please refer Tender documents.
9 documents required · 9 mandatory
₹0
₹4,800
8 Oct 2026
28 Aug 2026
15 Sept 2026
28 Aug 2026
15 Sept 2026
5 Sept 2026
29 Aug 2026 - 4 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Removal and Refixing of Chisel dressed/ Machine cut Granite slab for platform flooring and pointing with cement mortar 1:3 including cost and conveyance of all materials to worksite including cost of cement which has to be procured by the contractor including labour charges for fixing the granite stone slab in correct position to the required line and gradient as directed by the departmental officers and all other incidental charges etc. complete as per standard specification. | |||||
| 1.1 | Road A | 300 | Square Meter | 1,312.71 | ₹3,93,813 |
| 90Calculation of SubTotal, GST and Total Amount carried out by system automatically | |||||
| 90.1 | Basic cost of value put to tender as per estimate | - | (A) | - | - |
| 90.2 | Add GST at 18% | - | (B) | - | - |
| 90.3 | Total Value put to Tender | - | (A+B) | - | - |
| 90.4 | Quoted value | - | (D) | - | - |
| 90.5 | Final Quoted Value | - | (E) | - | - |
| 90.6 | Add GST at 18% of Final Quoted Value | - | (F) | - | - |
| 90.7 | Total Value of Contract Including 18% of GST | - | (E+F) | - | - |
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.12 MB
BOQ_839794.xls
BOQ • 0.25 MB
Tender_Document_TN_05_SI_10_FOOTPATH.pdf
Tender Documents • 0.58 MB
SPECIAL_CONDITION_CORRI_TN_05_SI_10.pdf
PDF • 0.21 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .