Loading…
Loading…
Tender Value
₹1.5 L
EMD Value
₹3,200
Closing Date
15 Jun 2026, 3:00 pm6d left
SOMESH BAHADUR MATHUR
Municipal Commissioner Begusarai
SRI KRISHNA SINGH CHOWK,
SOMESH BAHADUR MATHUR
MUNICIPAL COMMISSIONER BEGUSARAI
NAME OF WORK-construction of soak and major repair works of diff well cum soak pit construction in ward -17 (well-00 ,soakpit -04)
133310
GR-131/NIT-03/2026-27/NNBEG
Open Tender
CIVIL
Begusarai
• PAN
CIVIL
PERCENTAGE
L1
1
3 documents required · 3 mandatory
₹500
Processing Fee: 590
₹3,200
NAGAR NIGAM BEGUSARAI OFFICE
7 Jun 2026
7 Jun 2026
15 Jun 2026
8 Jun 2026
15 Jun 2026
8 Jun 2026
11 Jun 2026
NIT NO- E-TENDER……………../2026-27
BILL OF QUANTITY BOQ AMOUNT BID PROCESSING FEE SALT TAX
Group No 131 UPTO 70 LAKH 1140 1000 140
NAME OF WORK-construction of soak and major repair works of diff well cum soak pit construction in ward -17 (well-00 ,soakpit -04)
BOQ Amount : Rs 151790 UPTO 50,000 250 ABOVE 3.5 CR 17100 15000 2100
Cost of BOQ : Rs 1250.00 UPTO 2,50,000 500
Earnest Money : Rs 3100.00 UPTO 500000 750
Bid processing Fee Rs As per Eproc2 UPTO 10 LAKH 1250
Time of Completion : UPTO 15 LAKH 2500
Sr.No. Ref. No. Of SOR Item of Work Quantity (1NOS) nos Quantitys Unit Rate (Rs. Per Unit) Amount (Rs.) UPTO 50 LAKH 5000
1 B.C.D. (11.72) Providing designation 100A brick flat soling joints filled with local sand including cost of watering, taxes, royalty all complete as per building specification & direction of E/I. 1.29 4 5.16 sqm 283.30 1462.00
2 20.3A.1 Making25cm(10")diaboreupto4mtrdepthbelow groundwithhandaugerofapprovedqualityinordinary soi!(videclassificationofsoilitemA)truetoplumband without eccentri city in any stage of operation and disposalof theexcavatedearthupto50mtr ,Leadin eludingalllifts,allcompleteasperapproveddisignand directionofE/lDetailsofcostfor4pilesof4m=16mtrs depth 3 4 12 mt 178.30 2140.00
3 B.C.D 4.1.4 Providing and laying in position cement concrete of specified grade excluding the cost of cantering, shuttering all work up to plinth (1:2:4) 0.072 4 0.288 cum 3879.20 1117.00
4 B.C.D. 5.1.3 Providing and laying in position specified grade of reinforced cement concrete excluding the cost of cantering, shuttering, finishing and reinforce all work up to plinth level. (1:2:4) 0.402 4 1.608 cum 4232.40 6806.00
5 B.C.D. 5.22.7B Reinforcement for RCC work including straightening , cutting, bending, placing in position and biding all complete job. 34.202 4 136.808 KG 92.60 12668.00
6 6.1.12/1 Brick work with bricks of class 100A IN FOUNDATION AND PLINTH in C:M 1:6 ……. 1.754 4 7.016 cum 5017.90 35206.00
7 13.17.2 Repairing of 12 mm thick cement plaster in course in 1:4……all job comp 1.44 4 5.76 sqm 192.20 1107.00
8 B.C.D 2.8.1 Earth work in excavation of foundation trenches or drains (not exceeding 1.5m in width or 10 sqm. or plan) including dressing of sides and ramming of bottoms, lift up to 1.5m including getting out the excavated earth and disposal of surface excavated soil as directed with a lead of 50m. 4.081 4 16.324 cum 360.70 5888.00
10 2602D Designation 100A bricks 1/2 brickwork without mortarin soak pit 883 4 3532 /THS 7028.28 24824.00
11 7189 UPVS PIPES( working pressure 4kg/sqcm,single socket pipe 110mm dia). 5 4 20 mt 178.17 3563.00
12 7215 UPVS PIPE CLIPS( 110mm dia). 1 4 4 no 19.19 77.00
13 16.21 Engraving letter in hard stone 300 4 1200 letter 4.80 5760.00
14 16.86 Providing and laying gang saw cut 18 mm thick, mirror polished premoulded and pre polished machine cut granite stone of required size and shape of approved shade, colour and texture in footpath,flooring in road side plazas and similar locations, laid over 20mm thick base of cement mortar 1:4 (1cement : 4 coarse sand) including grouting the joints with white cement mixed with matching pigment,epoxy touch ups etc. complete as per direction of Engineer-in-Charge.With granite stone of area less than 0.50 sqm 1 4 4 sqm 3403.40 13614.00
15 13.79.1 Applying one coat of cement primer of approved brand and manufacture on wall surface and Finishing walls with water proofing cement paint of approved brand and manufacture and of required shade to give an even shade 2.54 4 10.16 sqm 81.20 825.00
17 Difference GST-Factor 0.0536xTotal cost on item 6389.92
18 Analysis of Carriage
19 Difference cost of material 0 0.00
20 Seigniorage Cost of Material 0 0.00
EARTH 0 4 0 cum 33 0.00
Coarse sand 0.724 4 2.896 cum 17.58 51.00
Stone chips 0.422 4 1.688 cum 60.49 102.00
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
nit-03-26-27.pdf
NIT • 1.57 MB
BOQBIDSHEET131.xlsx
NIT • 0.02 MB
Download all tender documents and submit your bid