Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.9 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹4.9 L+₹408.28 (0.08%)Rejected-AOC | L2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | SRI SHUBHAM CONSTRUCTION L2 | Prasath G L1 |
|---|---|---|---|---|---|
| 1.00Providing Paver Block at Minnal Village H/O Minnal Panchayat | |||||
| 2.00 | Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth, earth mixed with small sized boulders and hard gravelly soil as per SS 20B | 5.01 | cum | 130 ₹651 Lowest | 130 ₹651 Lowest |
| 3.00 | Cement Concrete 1:4:8 mix using 40mm metal including cost and conveyanceof all materials to work site and all labour charges etc. | 2.51 | cum | 6,083.07 ₹15,269 | 6,080 ₹15,261 Lowest |
| 4.00 | Cement Concrete 1:3:6 mix using 20mm metal including cost and conveyanceof all materials to work site and all labour charges etc. | 7.52 | cum | 6,872.67 ₹51,682 | 6,872 ₹51,677 Lowest |
| 5.00 | Supply and erecting of centering including cost and conveyance of all materials to work site and all labaour charges etc complete | 100.2 | Sqm | 182.5 ₹18,287 | 180 ₹18,036 Lowest |
| 6.00 | Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) 250 mm thick, including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory Soil Compactor to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as pwe clause 406 of MORTH Rev-5 | 36.01 | cum | 2,942.69 ₹1,05,966 | 2,942 ₹1,05,941 Lowest |
| 7.00 | Providing and Laying of Interlocking Concrete (Surface Textured) Block Pavements having thickness 60mm and compacted over a thin bedding M.Sand layer of 25 mm thickness and joints shall be filled by fine M.Sand of specified grading as per table 1500.6 of Specification of Rural roads-2014 and Technical specification clause 1504. | 288.08 | Sqm | 785.2 ₹2,26,200 | 785 ₹2,26,143 Lowest |
| 8.00 | GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package}
(Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD) | 1 | GST Amount | 75,249.9 ₹75,249.9 | 75,187.62 ₹75,187.62 Lowest |
Tender Value
₹5 L
EMD Value
₹5,000
Closing Date
23 Oct 2025, 3:00 pmClosed
BDO BP
panchayat union
PROVIDING PAVER BLOCK AT MINNAL VILLAGE MINNAL PANCHAYAT
2025_RDTN_614865_1
A2/1028/2025
Open Tender
Civil Works
Item Rate
180 days
Arakkonam
Please refer Tender documents.
1 document required · 1 mandatory
₹0
₹5,000
Yes
29 Oct 2025
16 Oct 2025
23 Oct 2025
16 Oct 2025
23 Oct 2025
16 Oct 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.32 MB
BOQ_734629.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .