Tender Value
₹10 L
EMD Value
₹10,000
Closing Date
6 Oct 2026, 3:00 pm
ASSISTANT COMMISSIONER, WEST ZONE.
WESTZONE, COIMBATORE CORPORATION
Renewal of B.T.Surface at Ramasamy lay cut road in Ward No.44, West Zone, Coimbatore Corporation.
2026_MAWS_705833_43
E4/WESTZONE/2026-27
Open Tender
Civil Works
Works
90 days
WESTZONE, COIMBATORE CORPORATION
As per tender document attached
4 documents required · 4 mandatory
₹0
₹10,000
19 Sept 2026
19 Sept 2026
7 Oct 2026
19 Sept 2026
6 Oct 2026
19 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earthwork Excavation And Deposting on Bank With Initial Lead of 10 m And Initial Lift of 2m In Hard Stiff Clay Stiff Black Hard Shales Muram Gravel Stoney Earth And Earth Mixed With Small Size Boulders And Hard Gravelly Soil (SS 20B) | 60.4 | m3 | - | - |
| 2 | Removal of excavated excess earth away from the site to 2 km including loading and transportation etc., complete as per the direction of the Departmental officers | 36.64 | m3 | - | - |
| 3 | Providing and laying ,spreading and compacting graded stone aggregate to Wet mix macadam (WMM) specification including premixing the material with water at OMC in mechanical mix plant carriage to mixed material by tipper to site laying in uniform layers with paver in sub base /base course on well prepared surface and compacting with vibratory roller to achive the desired density complete as per clasue 406 of MORTH specifications. | 65 | M3 | - | - |
| 4 | Providing and laying Prime coat of 7 kgs/10 sqm over the WMM surface treated with primer using 7 kgs of bituminous Emulsion (SS) for 10square meter area including cost of bituminous binder, including labour charges for applying the required quantity of bituminous binder as Prime coat manually etc., complete as per 502 of MORTH Rev-5 Specifications | 601 | M2 | - | - |
| 5 | Providing and laying tack coat of 2.5 kgs/10 sqm over the WMM surface treated with binder using 2.5 kgs of bituminous Emulsion (RS) for 10square meter area including cost of bituminous binder, including labour charges for applying the required quantity of bituminous binder as tack coat manually etc., complete as per 503 of MORTH Rev-5 Specifications | 601 | M2 | - | - |
| 6 | Providing and laying of 50mm compacted bituminous macadam using 0.42m3 of 26.5-11.2mm graded metal and 0.10 m3 of 11.2 to 2.8mm graded metal and 0.18 m3 of 2.8mm and below with 38 kgs of bitumen of grade 80/100 for premixing per 10 m2 including cost and conveyance of all materials to CMP site heating the bitumen and aggregates to required temperature and mixing them in required in central hot mix plant 20-30 tonnes capcity conveying the mix by tipper trucks to power site spreading the mix in required temperature for uniform thickness of 50mm with mechancial paver to the specified grades and cross section and compaction by 80-100 KN power roller to the required density etc., including labour for loading bitumen into bitumen tank and metal to feeder unit, labour for attending to paver site etc., including hire chrages and fuel charges for 20-30 T CMP with two bitumen boiler, tipper trucks, power finisher power rollers and all other tools and plant required including all other incidental charges etc., completed as per specification using cmp clause 504 of MOST specification. | 31 | M3 | - | - |
| 7 | Providing and laying Plastic bituminous concrete to 30mm thick using 0.13 cum of 19.00-9.50mm , 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 45.27 kgs of VG30/ VG70 bitumen,5.03 Kg of plastic for premixing per 10sqm including cost and conveyance of all materials to CMP site heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity , conveying the mix by tipper trucks to paver site , spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 80-10 tonne vibratory/ pneumatic roller to the required density etc., including labvour for attending to paver site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler , tipper trucks , paver finisher /9m paver finisher , vibratory / pneumatic roller and all other tools and plant required , including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5 | 19 | M3 | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 5.89 MB
Road.pdf
Tender Documents • 0.87 MB
CONDITIONS.pdf
Additional Documents • 0.26 MB
BOQ_848699.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .