Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.3 LAccepted-AOC | ₹9.3 L Quoted ₹10.4 L | L1 | Accepted-AOC Accepted |
| 2 | L2₹11.7 L+₹1.3 L (12.6%)Rejected-Finance HOUSE NO 114 WARD NO 1 KRISHNA NAGAR TEH AND DISTT HAMIRPUR H P | ₹11.7 L+₹1.3 L (12.6%) | L2 | Rejected-Finance Rejected |
| 3 | L3₹13.7 L+₹3.3 L (32.3%)Rejected-Finance R O GHARU SADAN CHITKARA PARK KAITHU 3 | ₹13.7 L+₹3.3 L (32.3%) | L3 | Rejected-Finance Rejected |
Tender Value
₹9.5 L
EMD Value
₹19,100
Closing Date
27 Feb 2024, 5:00 pmClosed
Executive Engineer R B M C Shimla
Executive Engineer R B M C Shimla
Balance work of restoration of rain damages on road from Satsang Bhawan to H B C Benmore in ward No 17 SH P L G I and G II from RD 0 035 to 0 175 and C O V Shape drain RD 0 035 to 0 175 C O U Shape drain 0 00 to 0 045 etc
2024_MC_86635_10
614dated20022024
Open Tender
Civil Works
Item Rate
60 days
Shimla
please refer tender documents
7 documents required · 7 mandatory
₹350
Executive Engineer R B M C Shimla
₹19,100
2 Jul 2024
21 Feb 2024
28 Feb 2024
21 Feb 2024
27 Feb 2024
21 Feb 2024
Amount
Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge. Ordinary rock
Excavation work by mechanical means (Hydraulic excavator)/ manual means in foundation trenches or drains (not exceeding 1.5m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soils as directed, within a lead of 50 m. Ordinary rock
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:5:10 (1 cement : 5 coarse sand): 10 graded stone aggregate 40 mm nominal size)
Centering and shuttering including strutting, propping etc. and removal of form work for : Retaining walls, return walls, walls (any thickness) including attached pilasters, buttresses, plinth and string courses fillets, kerbs and steps etc.
Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1:2:4 (1 cement :2 coarse sand) : 4 graded stone aggregate 20 mm nominal size)
Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works
Excavating, supplying and filling of local earth (including royalty) by mechanical transport upto a lead of 5km also including ramming and watering of the earth in layers not exceeding 20 cm in trenches, plinth, sides of foundation etc. complete.
Construction of granular sub-base by providing close graded Material conforming to specifications, mixing in a mechanical mix plant at OMC, carriage of mixed material by tippers to work site, for all leads & lifts, spreading in uniform layers of specified thickness with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per specifications and directions of Engineer-in-Charge. With material conforming to Grade-I (size range 75 mm to 0.075 mm) having CBR Value-30
With material conforming to Grade-II (size range 53 mm
Providing and laying cement concrete in retaining walls, return walls, walls (any thickness) including attached pilasters, columns, piers, abutments, pillars, posts, struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchor blocks, plain window sills, fillets, sunken floor etc., up to floor five level, excluding the cost of centering, shuttering and finishing : 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size)
SANDEEP CHAUHAN
ATUL DHANTA
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .