Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹29.1 LAccepted-AOC | ₹29.1 L Quoted ₹29.2 L | L1 | Accepted-AOC L1 BIDDER |
| 2 | L2₹31.0 L+₹1.8 L (6.21%)Rejected-Finance M S CHANANA ENGINEERS CONTRACTORS AZAD CHOWK FEROZEPUR CANTT FEROZEPUR PUNJAB 152001 | FIROZEPUR | PUNJAB | 152001 | ₹31.0 L+₹1.8 L (6.21%) | L2 | Rejected-Finance HIGHER BIDDER |
| 3 | Rejected-Technical | - | - | Rejected-Technical REJECTED DUE TO NOT ENLISTED IN ELIGIBLE CATEGORY |
| 4 | Rejected-Technical | - | - | Rejected-Technical REJECTED DUE TO NOT ENLISTED IN ELIGIBLE CATEGORY |
| 5 | Rejected-Technical | - | - | Rejected-Technical REJECTED DUE TO NOT ENLISTED IN ELIGIBLE CATEGORY |
| Sl No | Description | Qty | Unit | manoj and company L1 | Chanana Engineers & Contractors L2 |
|---|---|---|---|---|---|
| 1.00 | Comprehensive Maintenance of complete Central Air Conditioning Plant of capacity 160 TR (80 TR x2 working & 80 TR x1 standby) alongwith all equipments, through Annual Maintenance Contract (AMC) and Memeorandum of Understanding (MoU) between the contractor and OEM (Original Equipment Manufacturer) and carrying out daily preventive maintennace and periodical services to maintain and keep the Central AC plant functional complete all as specified and directed.
Make -BLUE STAR LIMITED installed at 159 GH Ferozepur Cantt. | 12 | Each Job per Calender Month | 95,000 ₹11,40,000 Lowest | 1,01,570 ₹12,18,840 |
| 2.00 | Operation (Manning) of Central Air Conditioning Plant at General Hospital, fire-fighting system and DG sets including compressors, condonsers, AHU unit, cooling towers, chillers, pipe line pumps, electrical panels safety equipments including operation of valves complete by outsourcing services for running Cenral Air Conditioning Plant round the clock in three shifts per day with each shift of 8 hours, by providing and deploying one Skilled Refrigeration Mechanic- 01 No per shift for 03 shifts.
Notes :-
(a) Refrigeration Mechanic shall be ITI certificate holder from recognised board having minimum 02 years experiance in similar Job / trade in Refrigeration and Air-Conditioning and shall be responsible for operation of plant and maintenance round the clock including Sundays and closed holidays.
(b) Refrigeration Mechanic shall be responsible operation and maintenance of the AC Plant, round the clock including Sundays and closed holidays. (c) The contractor shall also be responsible for cleaning of AC Plant cleaning surounding area and any necesarry T&P for smooth functioning of plant, Cleaning of area in and around pump Plants and rooms and common area (viz cutting of grass and disposal of debris) on demand to be included in the scope of work. Default if any noticed in duty of cleaning, recovery will be imposed as per terms and conditions of the contract. | 11 | Each Job per Calender Month | 99,000 ₹10,89,000 Lowest | 1,03,630 ₹11,39,930 |
| 3.00 | Operation (Manning) of Central Air Conditioning Plant at General Hospital, fire-fighting system and DG sets including compressors, condonsers, AHU unit, cooling towers, chillers, pipe line pumps, electrical panels safety equipments including operation of valves complete by outsourcing services for running Cenral Air Conditioning Plant round the clock in three shifts per day with each shift of 8 hours, by providing and deploying one Skilled Refrigeration Mechanic- 01 No per shift for 03 shifts.
Notes :-
(a) Refrigeration Mechanic shall be ITI certificate holder from recognised board having minimum 02 years experiance in similar Job / trade in Refrigeration and Air-Conditioning and shall be responsible for operation of plant and maintenance round the clock including Sundays and closed holidays.
(b) Refrigeration Mechanic shall be responsible operation and maintenance of the AC Plant, round the clock including Sundays and closed holidays. (c) The contractor shall also be responsible for cleaning of AC Plant cleaning surounding area and any necesarry T&P for smooth functioning of plant, Cleaning of area in and around pump Plants and rooms and common area (viz cutting of grass and disposal of debris) on demand to be included in the scope of work. Default if any noticed in duty of cleaning, recovery will be imposed as per terms and conditions of the contract. | 1 | Each Job per Calender Month | 1,03,000 ₹1,03,000 Lowest | 1,14,240 ₹1,14,240 |
| 4.00 | Service, repair, overhauling and rewinding of electric motor of capacity 10 HP, 3-phase 400-440 Volts complete disconnecting the electric supply removing of pully and fan and opening of both end covers taking out Bearings and rotor checking of air gap, checking of rotor field winding, replacement of bearings, greasing fo bearings including rewiring with superior quality copper winding wire insulating material, vanishing binding of winding etc complete all as directed by Engineer-in-Charge reassembling, replacing rusted nut, bolts, washers, checking and adjusting the alignment, connecting electric connection completed all as specified and directed for Electric motor 3 phase 10 HP of AC Plant. | 2 | Each Job | 14,500 ₹29,000 Lowest | 15,660 ₹31,320 |
| 5.00 | Service, repair, overhauling and rewinding of electric motor of capacity 7.5 HP, 3-phase 400-440 Voltscomplete disconnecting the electric supply removing of pully and fan and opening of both end covers taking out Bearings and rotor checking of air gap, checking of rotor field winding, replacement of bearings, greasing fo bearings including rewiring with superior quality copper winding wire insulating material, vanishing binding of winding etc complete all as directed by Engr -in-Charge reassembling, replacing rusted nut, bolts, washers, checking and adjusting the alignment, connecting electric connection completed all as specified and directed for Electric motor 3 phase 7.5 HP of AC Plant. | 2 | Each Job | 10,500 ₹21,000 Lowest | 11,050 ₹22,100 |
| 6.00 | M&L for serviceing of cooling coil tower of AC plant FRP Type of 156 TR by dismantling and taking out the one comb PVC files complete and PV Nozzles the PVC files by suitable descaling solution including bruising and cleaning complete with cleaning solution and water replacing the defective PVC flange along with rubber gasket and rusted bolts nuts and washer etc cleaning the water sump and XMP wire mesh with suitable cleaning solution re-assembling the same including replacing the defective water filter flanges of pipe joints etc and testing complete all as specified and directed. | 1 | Each Job | 5,000 ₹5,000 Lowest | 6,170 ₹6,170 |
| 7.00 | S&F in replacement PVC fins suitable for any capacity and any make Cooling tower of AC plants of 2X1X0.6 feet having LPS fills with tie rod and turn buckle of suitable size to match the system including taking out old unserviceable part complete all as specified and directed. | 300 | Each | 490 ₹1,47,000 Lowest | 520 ₹1,56,000 |
| 8.00 | S&F in replacement HEPA filter 10 to 20 microns static wove both side DPE mesh in aluminium frame efficiency 90% of sizes as per site requirement including taking out old unserviceable part complete all as specified and directed. | 20 | Each | 1,280 ₹25,600 Lowest | 1,370 ₹27,400 |
| 9.00 | S&F in replacement factor made performance HEPA filters of 99 micro down to 5 micro of standard size with multiple pockets & self supporting filters bags with MS/GI anodised aluminium frame suitable for central AC Plant including replacement of bolts & nuts including taking out old unserviceable part complete all as specified and directed. | 20 | Each | 1,190 ₹23,800 Lowest | 1,270 ₹25,400 |
| 10.00 | Material and labour for serving of air Handling Unit of capacity 6500 CFM (03 Nos) ,5500 CFM AHU 02 Nos, 6000 CFM AHU 01 No, 3500 CFM AHU 01 No, 3000 CFM AHU 01 No. by opening of both side cover taking out the Fresh air filter cleaning the External & Internal surface of AHU, Primary air filter, wire mesh filter, Tumble Blower fan and re-fixing the side covers head covers replacing the suitable gasket if required complete all as specified and directive by Engineer in charge :(Necessary Nut, Bolts, washers, pickings are included in quoted rate ) | 8 | Each Job | 10,500 ₹84,000 Lowest | 11,400 ₹91,200 |
Tender Value
Refer Docs
EMD Value
₹60,000
Closing Date
8 Jun 2026, 6:00 pmClosed
CWE FEROZEPUR CANTT
HQ CWE FEROZEPUR CANTT PIN 152001
Comprehensive AMC and operation of central AC plant in GH under GE (East) Ferozepur Cantt
2026_MES_766497_1
CWE/FZR-12/2026-27
Open Tender
Civil Works
Item Rate
365 days
FEROZEPUR CANTT
Please refer Tender documents.
8 documents required · 8 mandatory
₹500
GE (EAST) FEROZEPUR CANTT
₹60,000
Yes
1 Jul 2026
19 May 2026
15 Jun 2026
19 May 2026
8 Jun 2026
2 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Comprehensive Maintenance of complete Central Air Conditioning Plant of capacity 160 TR (80 TR x2 working & 80 TR x1 standby) alongwith all equipments, through Annual Maintenance Contract (AMC) and Memeorandum of Understanding (MoU) between the contractor and OEM (Original Equipment Manufacturer) and carrying out daily preventive maintennace and periodical services to maintain and keep the Central AC plant functional complete all as specified and directed.
Make -BLUE STAR LIMITED installed at 159 GH Ferozepur Cantt. | 12 | Each Job per Calender Month | - | - |
| 2 | Operation (Manning) of Central Air Conditioning Plant at General Hospital, fire-fighting system and DG sets including compressors, condonsers, AHU unit, cooling towers, chillers, pipe line pumps, electrical panels safety equipments including operation of valves complete by outsourcing services for running Cenral Air Conditioning Plant round the clock in three shifts per day with each shift of 8 hours, by providing and deploying all required supervisory, technical staff and required numbers of Helpers, complete all as specified and directed, but minimum as following:-
(i) Skilled FGM- 01 No per shift for 03 shifts
(ii) Skilled Refrigeration Mechanic- 01 No per shift for 03 shifts.
(iii) Un-skilled Helper- 01 No per shift for 03 shifts.
Notes :-
(a) The FGM and Refrigeration Mechanic shall be ITI certificate holder from recognised board having minimum 02 years experiance in similar Job / trade & Refrigeration and Air-Conditioning with 02 years experiance in relevant field, responsible for operation of plant and maintenance round the clock including Sundays and closed holidays.
(c) Helper to assist the FGM and Refrigeration Mechanic (minimum 10th pass) responsible for AC plant / ports cleaning, cleaning surounding area and any necesarry T&P for smooth functioning of plant, operation and maint around the clock including Sundays and closed holidays.
(d) The contractor shall submit name of persons to be deployed at work alongwith their qualification and experiance for approval from GE before the date of commencement of work.
(e) Subsequently action for verification of antecedents of the persons to be deployed shall be taken by the contractor and submit the same to Engineer-in-Charge/GE within 07 days from the date of commencement of work.
(f) Cleaning of area in and around pump houses and common area (viz cutting of grass and disposal of debris) on demand to be included in the scope of work. Default if any noticed in duty of cleaning, recovery will be imposed as per terms and conditions of the contract. | 11 | Each Job per Calender Month | - | - |
| 3 | Operation (Manning) of Central Air Conditioning Plant at General Hospital, fire-fighting system and DG sets including compressors, condonsers, AHU unit, cooling towers, chillers, pipe line pumps, electrical panels safety equipments including operation of valves complete by outsourcing services for running Cenral Air Conditioning Plant round the clock in three shifts per day with each shift of 8 hours, by providing and deploying all required supervisory, technical staff and required numbers of Helpers, complete all as specified and directed, but minimum as following:-
(i) Skilled FGM- 01 No per shift for 03 shifts
(ii) Skilled Refrigeration Mechanic- 01 No per shift for 03 shifts.
(iii) Un-skilled Helper- 01 No per shift for 03 shifts.
Notes :-
(a) The FGM and Refrigeration Mechanic shall be ITI certificate holder from recognised board having minimum 02 years experiance in similar Job / trade & Refrigeration and Air-Conditioning with 02 years experiance in relevant field, responsible for operation of plant and maintenance round the clock including Sundays and closed holidays.
(c) Helper to assist the FGM and Refrigeration Mechanic (minimum 10th pass) responsible for AC plant / ports cleaning, cleaning surounding area and any necesarry T&P for smooth functioning of plant, operation and maint around the clock including Sundays and closed holidays.
(d) The contractor shall submit name of persons to be deployed at work alongwith their qualification and experiance for approval from GE before the date of commencement of work.
(e) Subsequently action for verification of antecedents of the persons to be deployed shall be taken by the contractor and submit the same to Engineer-in-Charge/GE within 07 days from the date of commencement of work.
(f) Cleaning of area in and around pump houses and common area (viz cutting of grass and disposal of debris) on demand to be included in the scope of work. Default if any noticed in duty of cleaning, recovery will be imposed as per terms and conditions of the contract. NOTE:- This item shall be operated and commenced after break of 3 to 5 days on completion operation of 11 months under Serial Item No. 2 here-in-before. | 1 | Each Job per Calender Month | - | - |
| 4 | Service, reair, overhauling and rewinding of electric motor of capacity 10 HP, 3-phase 400-440 Volts complete disconnecting the electric supply removing of pully and fan and opening of both end covers taking out Bearings and rotor checking of air gap, checking of rotor field winding, replacement of bearings, greasing fo bearings including rewiring with superior quality copper winding wire insulating material, vanishing binding of winding etc complete all as directed by Engineer-in-Charge reassembling, replacing rusted nut, bolts, washers, checking and adjusting the alignment, connecting electric connection completed all as specified and directed for Electric motor 3 phase 10 HP of AC Plant. | 2 | Each Job | - | - |
| 5 | Service, reair, overhauling and rewinding of electric motor of capacity 7.5 HP, 3-phase 400-440 Voltscomplete disconnecting the electric supply removing of pully and fan and opening of both end covers taking out Bearings and rotor checking of air gap, checking of rotor field winding, replacement of bearings, greasing fo bearings including rewiring with superior quality copper winding wire insulating material, vanishing binding of winding etc complete all as directed by Engr -in-Charge reassembling, replacing rusted nut, bolts, washers, checking and adjusting the alignment, connecting electric connection completed all as specified and directed for Electric motor 3 phase 7.5 HP of AC Plant. | 2 | Each Job | - | - |
| 6 | M&L for serviceing of cooling coil tower of AC plant FRP Type of 156 TR by dismantling and taking out the one comb PVC files complete and PV Nozzles the PVC files by suitable descaling solution including bruising and cleaning complete with cleaning solution and water replacing the defective PVC flange along with rubber gasket and rusted bolts nuts and washer etc cleaning the water sump and XMP wire mesh with suitable cleaning solution re-assembling the same including replacing the defective water filter flanges of pipe joints etc and testing complete all as specified and directed. | 1 | Each Job | - | - |
| 7 | S&F in replacement PVC fins suitable for any capacity and any make Cooling tower of AC plants of 2X1X0.6 feet having LPS fills with tie rod and turn buckle of suitable size to match the system including taking out old unserviceable part complete all as specified and directed. | 300 | Each | - | - |
| 8 | S&F in replacement HEPA filter 10 to 20 microns static wove both side DPE mesh in aluminium frame efficiency 90% of sizes as per site requirement including taking out old unserviceable part complete all as specified and directed. | 20 | Each | - | - |
| 9 | S&F in replacement factor made performance HEPA filters of 99 micro down to 5 micro of standard size with multiple pockets & self supporting filters bags with MS/GI anodised aluminium frame suitable for central AC Plant including replacement of bolts & nuts including taking out old unserviceable part complete all as specified and directed. | 20 | Each | - | - |
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.38 MB
Tender12.pdf
Tender Documents • 1.09 MB
BOQ_858423.xls
BOQ • 0.93 MB
RevisedTender12.pdf
PDF • 1.09 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .