Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹11.4 LAccepted-AOC 81 1 1 MUTHUKRISHNAPURAM 6TH STREET THOOTHUKUDI 628 002 | THOOTHUKUDI | THOOTHUKUDI | TAMIL NADU | 628002 | ₹11.4 L | 1 | Accepted-AOC Lowest Rate |
| 2 | 2₹11.6 LRejected-AOC 1 136 SOUTH STREET MUTHUMOOTHANMOZHI RADHAPURAM TALUK TIRUNELVELI DISTRICT 627 657 | TIRUNELVELI | TAMIL NADU | 627657 | ₹11.6 L | 2 | Rejected-AOC Highest rate |
| 3 | Not Admitted-Fee/PreQual/Technical/Finance | - | - | Not Admitted-Fee/PreQual/Technical/Finance Others-The contractor should be a Registered contractor in Alwarthirunagar Panchayat Union or DRDA Thoothukudi as per tender notice |
| Sl No | Description | Qty | Unit | SELVAN AND CO L1 | Aadirudhan Construction L2 |
|---|---|---|---|---|---|
| 1.00Name of Work: Construction of Drainage with Horizontal soakpit and paverblock at Pillaiyarkovil street in Therkankulam village in Meerankulam Panchayat in Alwarthirunagari Panchayat Union Mines&Minerals 2025 - 2026 | |||||
| 2.00 | Earthwork excavation in all classes of soils except hard rock requiring | 30.8 | Cubic metre | 263.25 ₹8,108.10 | 276 ₹8,500.80 |
| 3.00 | CC 1:4:8 mix using 40mm Gauge hand broken granite stone jelly | 10.6 | Cubic metre | 5,545.76 ₹58,785.06 | 5,569 ₹59,031.40 |
| 4.00 | Supplying and erecting centering for sides and soffits including supports and struting | 216.4 | Cubic metre | 546.41 ₹1.2 L | 560 ₹1.2 L |
| 5.00 | CC 1:3:6 mix using 20mm gauge hand broken granite stone jelly | 20.08 | Cubic metre | 6,304.99 ₹1.3 L | 6,330 ₹1.3 L |
| 6.00 | Construction of Gnanular Sub base by providing well graded material spreading in uniform layers | 44.8 | Cubic metre | 2,644.38 ₹1.2 L | 2,662 ₹1.2 L |
| 7.00 | Paving the flooring with special type of Paverblock 60mm thick including laying and compacting | 448 | Cubic metre | 773.9 ₹3.5 L | 787 ₹3.5 L |
| 8.00 | Plastering with Cement Mortar 1:5 (One cement and Five M.Sand), 20mm thick in all floors including curing etc. complete complying with standard specification and as directed by the departmental officers. | 32.2 | Cubic metre | 572.65 ₹18,439.33 | 586 ₹18,869.20 |
| 9.00 | Supplying, fabricating and placing in position Mild Steel / Ribbed Tor Steel grills for all RCC works as per design given including cost of steel and G.I. binding wire in all floors etc. complete complying with standard specification. (Contractor has to make his own arrangements for the supply of steel and binding wire) | 0.17 | Cubic metre | 91,854.38 ₹15,707.10 | 92,050 ₹15,740.55 |
| 10.00 | Cement Concrete 1:1-1/2:3 (One Cement, One and a half crushed stone M.Sand and Three hard broken stone jelly) using 20 mm gauge hard broken granite stone jelly for all RCC items of works excluding cost of reinforcement grill and fabricating charges centering and shuttering but including laying, vibrating with mechanical vibrators, finishing, curing, etc. and providing fixtures like fan clamps in the RCC | 2.7 | Cubic metre | 9,308.29 ₹25,132.38 | 9,339 ₹25,215.30 |
Tender Value
₹11.6 L
EMD Value
₹12,000
Closing Date
22 Jan 2026, 3:00 pmClosed
Block development officer,Alwarthirunagari
Block development officer,Alwarthirunagari
Construction of drainage with horizontal sakpit and paverblock arrangement at Pillaiyarkovil street in Therkhankulam village in meerankulam panchayat
2026_RDTN_643501_1
T7/2950/2025 06.01.2026
Open Tender
Civil Works - Roads
90 days
Work
IV
4 documents required · 4 mandatory
₹0
₹12,000
Yes
18 Feb 2026
13 Jan 2026
22 Jan 2026
13 Jan 2026
22 Jan 2026
14 Jan 2026
Earthwork excavation in all classes of soils except hard rock requiring
CC 1:4:8 mix using 40mm Gauge hand broken granite stone jelly
Supplying and erecting centering for sides and soffits including supports and struting
CC 1:3:6 mix using 20mm gauge hand broken granite stone jelly
Construction of Gnanular Sub base by providing well graded material spreading in uniform layers
Paving the flooring with special type of Paverblock 60mm thick including laying and compacting
Plastering with Cement Mortar 1:5 (One cement and Five M.Sand), 20mm thick in all floors including curing etc. complete complying with standard specification and as directed by the departmental officers.
Supplying, fabricating and placing in position Mild Steel / Ribbed Tor Steel grills for all RCC works as per design given including cost of steel and G.I. binding wire in all floors etc. complete complying with standard specification. (Contractor has to make his own arrangements for the supply of steel and binding wire)
Cement Concrete 1:1-1/2:3 (One Cement, One and a half crushed stone M.Sand and Three hard broken stone jelly) using 20 mm gauge hard broken granite stone jelly for all RCC items of works excluding cost of reinforcement grill and fabricating charges centering and shuttering but including laying, vibrating with mechanical vibrators, finishing, curing, etc. and providing fixtures like fan clamps in the RCC
Earth work excavation in all clauses of soil with initial lead of 10 m and initial lift 2 m except hard rock, blasting, etc., complete as per standard specification.
Cement concrete 1:4:8 mix using 40 mm ISS HBG metal including all cost and conveyance of materials, labour charges such as compaction, curing, etc., complete as per standard specification.
Cement concrete 1:3:6 mix using 20 mm ISS HBG metal including all cost and conveyance of materials, labour charges such as compaction, curing, etc., complete as per standard specification.
Centering charges for sides and soffits of R.C.C.works including labour etc., complete as per standard specification.
plastering with c.m 1:5 mix 12 mm thick including all cost and conveyance of materials, labour charges such as curing, etc., complete as per standard specification.
supply and filling with 20 mm HBG Metal including all cost and conveyance of materials, labour charges etc., complete as per standard specification.
supply and filling with 6mm mm HBG Metal including all cost and conveyance of materials, labour charges etc., complete as per standard specification.
colour washing two coats using approved colour including all cost and conveyance of materials, labour charges , etc., complete as per standard specification.
supply and fixing of steel mesh including all cost and conveyance of materials, labour charges such as curing, etc., complete as per standard specification.
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_771016.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.18 MB
BOQ_771016.xls
BOQ • 0.26 MB
TechnicalBid.pdf
Tender Documents • 0.72 MB
Download all tender documents and submit your bid