Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹12.4 LAccepted-AOC H NO 399 OXELBERG DHARGAL PERNEM GOA | NORTH GOA | GOA | 403001 | ₹12.4 L | L1 | Accepted-AOC AOC Awarded |
| 2 | L2₹12.4 LRejected-Finance H NO 264 1 WARD NO 03 DEULWADA PALIEM PERNEM GOA | ₹12.4 L | L2 | Rejected-Finance Rejected |
Tender Value
₹11.8 L
EMD Value
₹23,635
Closing Date
19 Jun 2026, 3:00 pmClosed
Executive Engineer
2nd Floor, Gomantak Maratha Samaj, Dayanand Smruti, Panaji - Goa
Constrution of Shantadurga Mandap at Moica Waddo, Varchwada Pilerne in Reis Magos Z.P. Constituency. (XVth Finance Funds)
2026_ZP_29742_1
NGZP/02/2026-27/38/218/L21
Open Tender
Civil Works
Percentage
120 days
North Goa Zilla Panchayat
Please refer Tender documents.
3 documents required · 3 mandatory
₹5,000
₹23,635
6 Aug 2026
12 Jun 2026
22 Jun 2026
12 Jun 2026
19 Jun 2026
13 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earthwork in excavation by mechanical means (hydraulic excavator)/manual means in foundation pipeline trenches drain (not exceeding 1.5 m in width or 10 sq.m. on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m including getting out the excavated soil and disposal of surplus excavated soil as directed within a lead of 50 m. a) All kinds of soil | 82.19 | Cum | 291 | ₹23,916.71 |
| 2 | Rubble packing with hard laterite stone under floors includign watering ramming and consolidating etc. in pipeline trenches and other foundations complete | 48.08 | Cum | 2,211 | ₹1,06,312.62 |
| 3Providing and laying in position cement concrete 1:2:4 (1 cement : 2 coarse sand: 4 graded granitic or basaltic stone aggregate 40 m nominal size) excluding cost of centering, shuttering and finishing : | |||||
| 3.01 | All works upto plinth level | 24.04 | Cum | 6,635 | ₹1,59,517.01 |
| 4 | Refilling the pipeline/foundation trenches plinth sides, foundation etc. with available excavated earth in layers not exceeding 20 cm depth consolidating each layer ramming and watering lead upto 50 M and all lifts and disposal of surplus earth as directed by Engineer in Charge. | 258.57 | Cum | 245 | ₹63,348.73 |
| 5 | Laterite masonry in neatly dressed stones of size as specified in cement mortar 1: 4 (1 cement : 4 coarse sand) in foundation and basement. | 44.71 | Cum | 5,186 | ₹2,31,876.43 |
| 6Providing and laying in position (1:11/2:3) Reinforced cement conrete excluding the cost of centering, shuttering, finishing and reinfrocement (1 cement: 1½ coarse sand:3 graded stone agg 20mm nominal size) | |||||
| 6.01 | All works upto plinth level | 29.61 | Cum | 7,178 | ₹2,12,560.68 |
| 6.02 | In walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and structs etc. upto floor five level | 4.06 | Cum | 8,034 | ₹32,595.54 |
| 7Centering & shuttering including Strutting, Propping & removal of forms for : | |||||
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.29 MB
BOQ_30166.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].