| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹4.9 CrAdmitted-Finance | +3.06% | ₹4.9 Cr | L1 | Admitted-Finance |
| 2 | L2₹5.0 Cr+₹11.2 L (2.27%)Admitted-Finance | +5.40% | ₹5.0 Cr+₹11.2 L (2.27%) | L2 | Admitted-Finance |
| 3 | L3₹5.2 Cr+₹32.5 L (6.61%)Admitted-Finance | +9.87% | ₹5.2 Cr+₹32.5 L (6.61%) | L3 | Admitted-Finance |
Tender Value
₹4.8 Cr
EMD Value
₹9.5 L
Closing Date
17 Jul 2026, 6:00 pmClosed
SE PWD Circle Rajsamand
Rajsamand
Remaining work of construction of charbhuja to seventri road km. 0/0 to 10/0 Distt. Rajsamand under(Risk and Cost)
2026_CEPWD_573913_1
NIT No. 02/2026-27 SE PWD Circle Rajsamand
Open Tender
Civil Works
Percentage
240 days
Amet
Please refer Tender documents.
3 documents required · 3 mandatory
₹5,000
Through Chalan
₹9.5 L
Yes
22 Jul 2026
8 Jul 2026
20 Jul 2026
8 Jul 2026
17 Jul 2026
8 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Construction of Foundation / Inaugration Pedastal in 23 cm thick Brick masonry in CM 1:4 of size 1.20m x 1.80m above ground level with adequate foundation including providing and fixing of Granite stone of size 0.75m x0.60m with engraving letters and figures,cement plaster,white washing etc. complete as per direction of Engineer in charge. | - | Each | - | - |
| 2 | Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per MoRTH Specification Clause 201..By Mechanical Means In area of thorny jungle | - | P.Hect. | - | - |
| 3 | Preparation of Foundation for EmbankmentScarifying Existing Bituminous Surface to a Depth of 150 mm by Mechanical MeansScarifying the existing bituminous road surface to a depth of 150 mm and disposal of scarified material with a lift upto 3 m and lead upto 1000 m as per MoRTH Specification Clause 305.4.3 | 1 | P.sqm | - | - |
| 4 | Wet Mix Macadam Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400-12 & 400-13 and MoRTH Specification Clause 406..By Mechanical Means with all lead | 0.2 | P.Cum | - | - |
| 5 | Construction of Subgrade and Earthen Shoulders Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300-2 with lead upto 50 m as per MoRTH Specification Clause 305.3 | - | P.Cum | - | - |
| 6 | Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base(WBM/WMM) including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per MoRTH Specification Clause 502 | - | P.sqm | - | - |
| 7 | Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.20 to 0.30 kg per sqm on the prepared bituminous surface cleaned with Hydraulic broom as per MoRTH Specification Clause 503. | - | P.sqm | 1 | - |
| 8 | Providing and laying bituminous macadam with hot mix plant using crushed aggregates of grading as per Table 500-7 premixed with bituminous binder, transported to site with all leads laid over a previously prepared surface with paver finisher to the required grade, level and alignment and rolled to achieve the desired compaction as per MoRTH Specification Clause 504.Bitumen (VG-30) | 1 | P.Cum | - | - |
| 9 | 20mm thick Open-Graded Premix Carpet using Bituminous (Viscosity grade/modified bitumen) Binder Providing, laying and rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates either using Viscosity grade bitumen or emulsion to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 80-100 kN static roller capacity, finished to required level and grades to be followed by seal coat of either Type A or Type B or Type C as per MoRTH Specification Clause 510.Case - II By Mechanical Means by Bitumen (VG-30) | - | P.sqm | - | - |
| 10 | Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type A, Type B and Type C as per MoRTH Specification Clause 511(B)By Mechanical Means Case - II : Type B
(ii) Bitumen (VG-30) | - | P.sqm | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 3.39 MB
Tendernotice_2.pdf
PDF • 26.97 MB
Tendernotice_3.pdf
PDF • 0.90 MB
FinancialBID.pdf
Tender Documents • 15.17 MB
BOQ_1020923.xls
BOQ • 0.33 MB
Potentialbid.pdf
Tender Documents • 0.43 MB
CCFSEV.pdf
PDF • 0.40 MB
Potentialbid_Final.pdf
PDF • 0.43 MB
FinancialBID_Final.pdf
PDF • 15.17 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .