| 1 | L1₹1.9 CrAdmitted-Finance | ₹1.9 Cr | L1 | Admitted-Finance |
| 2 | L2₹2.1 Cr+₹18.6 L (9.61%)Admitted-Finance | ₹2.1 Cr+₹18.6 L (9.61%) | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | N.Premkumar L1 | G.MURUGAN L2 |
|---|---|---|---|---|---|
| 1.00 | 1.Construction of Drainage at Ganapathi Nagar in Eruthukaranpatti Panchayat
Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth, earth mixed with small sized boulders and hard gravelly soil as per SS 20B for foundation | 536.34 | Cum | 168 ₹90,105.12 Lowest | 200 ₹1,07,268 |
| 2.00 | Supplying and Filling with good river sand including cost and conveyance to the site and all labour charges etc., complete | 127.7 | Cum | 1,000 ₹1,27,700 Lowest | 1,255 ₹1,60,263.5 |
| 3.00 | Cement concrete 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete | 127.7 | Cum | 4,163 ₹5,31,615.1 Lowest | 4,500 ₹5,74,650 |
| 4.00 | Supplying and erecting steel centering for sides and soffits etc complete complying with standard specifications.(Deck Slab & Bed Block) Above Ground Level | 2,298.6 | Sqm | 376 ₹8,64,273.6 Lowest | 400 ₹9,19,440 |
| 5.00 | Cement concrete 1:2:4 mix using 20mm ISS HBG metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete | 264.34 | Cum | 5,496 ₹14,52,812.64 Lowest | 6,255 ₹16,53,446.7 |
| 6.00 | Plastering in cm 1:5 mix using 12mm thick including cost and conveyance of all labour charges etc completed | 574.65 | Sqm | 194 ₹1,11,482.1 Lowest | 200 ₹1,14,930 |
| 7.00 | Provision for Name board | 1 | Nos | 4,500 ₹4,500 Lowest | 4,500 ₹4,500 Lowest |
| 8.00 | 2.Construction of Drainage at Church road in Eruthukaranpatti Panchayat
Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth, earth mixed with small sized boulders and hard gravelly soil as per SS 20B for foundation | 623.3 | Cum | 168 ₹1,04,714.4 Lowest | 200 ₹1,24,660 |
| 9.00 | Supplying and Filling with good river sand including cost and conveyance to the site and all labour charges etc., complete | 127.21 | Cum | 1,000 ₹1,27,210 Lowest | 1,255 ₹1,59,648.55 |
| 10.00 | Cement concrete 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete | 127.21 | Cum | 4,163 ₹5,29,575.23 Lowest | 4,500 ₹5,72,445 |
Tender Value
Refer Docs
EMD Value
₹2.0 L
Closing Date
23 Feb 2021, 3:00 pmClosed
Block Development Officer (VP)
Panchayat Union, Ariyalur
Construction of Drainage and Lining wall 11 Nos in Eruthukaranpatti, Valajanagaram and Thamaraikulam Panchayats in Ariyalur Block of Ariyalur District under District Mineral Fundation Trust Fund 2020-21 in Package No.10
2021_RDTN_196923_1
1648/2019/B2,Dated.12.02.2021
Open Tender
Civil Works
Works
90 days
Panchayat Union
As per Tender Document
4 documents required · 4 mandatory
₹0
₹2.0 L
24 Feb 2021
18 Feb 2021
23 Feb 2021
18 Feb 2021
23 Feb 2021
18 Feb 2021
Amount
1.Construction of Drainage at Ganapathi Nagar in Eruthukaranpatti Panchayat Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth, earth mixed with small sized boulders and hard gravelly soil as per SS 20B for foundation
Supplying and Filling with good river sand including cost and conveyance to the site and all labour charges etc., complete
Cement concrete 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Supplying and erecting steel centering for sides and soffits etc complete complying with standard specifications.(Deck Slab & Bed Block) Above Ground Level
Cement concrete 1:2:4 mix using 20mm ISS HBG metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Plastering in cm 1:5 mix using 12mm thick including cost and conveyance of all labour charges etc completed
Provision for Name board
2.Construction of Drainage at Church road in Eruthukaranpatti Panchayat Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth, earth mixed with small sized boulders and hard gravelly soil as per SS 20B for foundation
Supplying and Filling with good river sand including cost and conveyance to the site and all labour charges etc., complete
Cement concrete 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Supplying and erecting steel centering for sides and soffits etc complete complying with standard specifications.(Deck Slab & Bed Block) Above Ground Level
Cement concrete 1:2:4 mix using 20mm ISS HBG metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Plastering in cm 1:5 mix using 12mm thick including cost and conveyance of all labour charges etc completed
Provision for Name board
3.Construction of Drainage at Raja Ganapathy Nagar in Eruthukaranpatti Panchayat Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth, earth mixed with small sized boulders and hard gravelly soil as per SS 20B for foundation
Supplying and Filling with good river sand including cost and conveyance to the site and all labour charges etc., complete
Cement concrete 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Supplying and erecting steel centering for sides and soffits etc complete complying with standard specifications.(Deck Slab & Bed Block) Above Ground Level
Cement concrete 1:2:4 mix using 20mm ISS HBG metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Plastering in cm 1:5 mix using 12mm thick including cost and conveyance of all labour charges etc completed
Provision for Name board
4.Construction of Drainage at Anna Nagar Ist Street in Eruthukaranpatti Panchayat Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth, earth mixed with small sized boulders and hard gravelly soil as per SS 20B for foundation
Supplying and Filling with good river sand including cost and conveyance to the site and all labour charges etc., complete
Cement concrete 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Supplying and erecting steel centering for sides and soffits etc complete complying with standard specifications.(Deck Slab & Bed Block) Above Ground Level
Cement concrete 1:2:4 mix using 20mm ISS HBG metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Plastering in cm 1:5 mix using 12mm thick including cost and conveyance of all labour charges etc completed
Provision for Name board
5.Construction of Drainage at Anna Nagar Co-Operative Bank to Church in Eruthukaranpatti Panchayat Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth, earth mixed with small sized boulders and hard gravelly soil as per SS 20B for foundation
Supplying and Filling with good river sand including cost and conveyance to the site and all labour charges etc., complete
Cement concrete 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Supplying and erecting steel centering for sides and soffits etc complete complying with standard specifications.(Deck Slab & Bed Block) Above Ground Level
Cement concrete 1:2:4 mix using 20mm ISS HBG metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Plastering in cm 1:5 mix using 12mm thick including cost and conveyance of all labour charges etc completed
Provision for Name board
6.Construction of Drainage at Ganapathi Nagar 2nd Cross Street in Eruthukaranpatti Panchayat Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth, earth mixed with small sized boulders and hard gravelly soil as per SS 20B for foundation
Supplying and Filling with good river sand including cost and conveyance to the site and all labour charges etc., complete
Cement concrete 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Supplying and erecting steel centering for sides and soffits etc complete complying with standard specifications.(Deck Slab & Bed Block) Above Ground Level
Cement concrete 1:2:4 mix using 20mm ISS HBG metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Plastering in cm 1:5 mix using 12mm thick including cost and conveyance of all labour charges etc completed
Provision for Name board
7.Construction of Drainage at Bharathiyar Nagar in Valajanagaram Panchayat Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth, earth mixed with small sized boulders and hard gravelly soil as per SS 20B for foundation
Supplying and Filling with good river sand including cost and conveyance to the site and all labour charges etc., complete
Cement concrete 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Supplying and erecting steel centering for sides and soffits etc complete complying with standard specifications.(Deck Slab & Bed Block) Above Ground Level
Cement concrete 1:2:4 mix using 20mm ISS HBG metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Plastering in cm 1:5 mix using 12mm thick including cost and conveyance of all labour charges etc completed
Provision for Name board
8.Construction of Drainage at Bharathiyar Nagar near Manohar House in Valajanagaram Panchayat Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth, earth mixed with small sized boulders and hard gravelly soil as per SS 20B for foundation
Supplying and Filling with good river sand including cost and conveyance to the site and all labour charges etc., complete
Cement concrete 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Supplying and erecting steel centering for sides and soffits etc complete complying with standard specifications.(Deck Slab & Bed Block) Above Ground Level
Cement concrete 1:2:4 mix using 20mm ISS HBG metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Plastering in cm 1:5 mix using 12mm thick including cost and conveyance of all labour charges etc completed
Provision for Name board
9.Construction of Drainage at Kuruvankuttai near Suresh House in Valajanagaram Panchayat Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth, earth mixed with small sized boulders and hard gravelly soil as per SS 20B for foundation
Supplying and Filling with good river sand including cost and conveyance to the site and all labour charges etc., complete
Cement concrete 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Supplying and erecting steel centering for sides and soffits etc complete complying with standard specifications.(Deck Slab & Bed Block) Above Ground Level
Cement concrete 1:2:4 mix using 20mm ISS HBG metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Plastering in cm 1:5 mix using 12mm thick including cost and conveyance of all labour charges etc completed
Provision for Name board
10.Construction of Drainage at 3rd Cross Street Kadaisi Arivoli House in Valajanagaram Panchayat Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth, earth mixed with small sized boulders and hard gravelly soil as per SS 20B for foundation
Supplying and Filling with good river sand including cost and conveyance to the site and all labour charges etc., complete
Cement concrete 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Supplying and erecting steel centering for sides and soffits etc complete complying with standard specifications.(Deck Slab & Bed Block) Above Ground Level
Cement concrete 1:2:4 mix using 20mm ISS HBG metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Plastering in cm 1:5 mix using 12mm thick including cost and conveyance of all labour charges etc completed
Provision for Name board
11.Construction of Liningwall in the Channel at Seran eri inlet Supply Channel in Thamaraikulam Panchayat Dry stone masonry in Rough stone packing including cost and conveyance to the site and all labour charges etc., complete
Pointing the Randam rubble masonry in cement morter 1:3 with simmultaneous including cost and conveyance to the site and all labour charges etc., complete
Provision for Name board
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
G.MURUGAN
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .