Loading…
Loading…
Tender Value
₹2.7 L
EMD Value
₹5,400
Closing Date
17 Sept 2026, 6:00 pm2d left
Executive Engineer Left River Works Division
Office of Executive Engineer LRWD, SMC at Old Fund near Public Park Karan Nagar
Construction Of Lane/Drain Near The House Of Bashir Ahmad Dar,Manzoor Ahmad, Tariq Ahmad Dar And Others At Purushyar Habba Kadal
2026_HAUDD_324031_1
NIET 37 e-tendering /2026-27 LRWD
Open Tender
Civil Works
Percentage
60 days
Srinagar
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
Yes
FA/CAO Municipal Account 0216010200000007
₹5,400
Yes
9 Sept 2026
9 Sept 2026
18 Sept 2026
9 Sept 2026
17 Sept 2026
9 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Engagement of labours for clearnece of site etc | 2 | NO | 553 | ₹1,106 |
| 2 | Dismantling damged tile work in floors including stacking material within 50 meters lead.including disposal of unservicable material within 50m lead as per directions of engineer incharge. | 81.31 | SQM | 89.95 | ₹7,313.83 |
| 3 | Demolishing cement concrete manually/by mechanical means including disposal of material within 50 meters lead as per direction of Engineer-in- charge:1:3:6 or richer mix (i/c equivalent design mix) | 10.46 | CUM | 1,725.2 | ₹18,045.59 |
| 4 | P/F of PVC pipe/fittings line heavy duty (Prince made). Grade-B) with fittings complete job.
200mm dia | 53.35 | RM | 899 | ₹47,961.65 |
| 4.1 | 100 mm Dia | 9.14 | RM | 365 | ₹3,336.1 |
| 5 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) | 6.19 | CUM | 5,202.9 | ₹32,205.95 |
| 6 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) | 7.27 | CUM | 5,733.6 | ₹41,683.27 |
| 7 | Structural steel work in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete job including all carriages complete job.
(a) (Welded.) | 101.08 | KG | 138.2 | ₹13,969.26 |
| 8 | Chequerred precast cement concrete tiles 22mm thick (coloured) in footpath and courtyard, jointed with neat cement slurry mixed with pigment to match the shade of the tiles, including rubbing, cleaning and curing complete, on 20 mm thick bed of cement mortar 1:4 ( 1 cement : 4 coarse sand) including all carriages complete job as per the directions of EIC | 74.48 | SQM | 1,150.75 | ₹85,707.86 |
| 9 | Form work centering / shuttering including Strutting, Propping etc and removal of form work for:
(a) Foudation, footings, basis, coloums etc | 5.8 | SQM | 286.35 | ₹1,660.83 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.94 MB
BOQ_1092284.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .