| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.7 LAdmitted-Finance | -11.69% | ₹1.7 L | L1 | Admitted-Finance |
| 2 | L2₹1.9 LAdmitted-Finance | -5.00% | ₹1.9 L | L2 | Admitted-Finance |
| 3 | L3₹2.0 LAdmitted-Finance | -0.25% | ₹2.0 L | L3 | Admitted-Finance |
Tender Value
₹2.0 L
EMD Value
₹3,940
Closing Date
24 Aug 2026, 4:00 pmClosed
XEN REW Kathua
XEN REW Kathua
Construction of Water Tanki NHO OM Parkash W.No.07, Sallona, Pyt. Bhiker, Block Bhoond.
2026_RDPR_321135_16
e-NIT No.186/REW/K of 2026-27 Dated 17/08/2026 2nd call
Open Tender
Civil Works
Percentage
90 days
Bhoond
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
Rural Development and Panchayati Raj
₹3,940
25 Aug 2026
17 Aug 2026
25 Aug 2026
17 Aug 2026
24 Aug 2026
17 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, 100% Qty. in A.k.S. | 3.84 | m3 | 479.3 | ₹1,840.51 |
| 2 | Providing and laying in position cement concrete of (1:5:10)grade excluding the cost of centering and shuttering using 40mm size agg. | 1.03 | m3 | 4,826.5 | ₹4,971.3 |
| 3 | Providing and laying in position cement concrete 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size)of specified grade including curing but
excluding the cost of centring and shuttering. All work upto plinth level with: | 3.8 | m3 | 4,774.25 | ₹18,142.15 |
| 4 | Providing and laying in position specified grade of reinforced cement concrete 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) including
curing but excluding the cost of centering, shuttering, finishing and reinforcement. All
works upto plinth level | 0.68 | m3 | 7,778.4 | ₹5,289.31 |
| 5 | Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15°,
landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral
stair cases upto five level including curing but excluding the cost of centring, shuttering,
finishing and reinforcement with | 1.03 | m3 | 9,395.7 | ₹9,677.57 |
| 6 | Reinforcement for RCC work including cutting,straightening ,bending ,binding etc. | 133.52 | kg | 123.2 | ₹16,449.66 |
| 7 | Brick work with common burnt clay (non-modular) bricks of class designation 7.5 in foundation and plinth including curing in : | 4.83 | m3 | 7,877.4 | ₹38,047.84 |
| 8 | Extra for brick work with common burnt clay bricks/cement concrete bricks in superstructure above plinth level upto floor five level | 4.83 | m3 | 1,455.65 | ₹7,030.79 |
| 9 | Cement concrete flooring 1:2:4 (1cement: 2 coarse sand: 4 graded stone
aggregate) finished with a floating coat of neat cement including cement
slurry and curing complete, but excluding the cost of nosing of steps etc.
complete. | 2.3 | m2 | 562.15 | ₹1,292.95 |
| 10 | Making plinth protection 50mm thick of cement concrete 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) over 75mm bed of dry brick ballast 40mm nominal size well rammed and consolidated and grouted with fine sand including finishing the top smooth and curing complete | 3.91 | m2 | 572.8 | ₹2,239.65 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.97 MB
BOQ_1071258.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].