Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance VILLAGE CHANTHO PO PRATHA TEHSIL AND DISTRICT SOLAN HP | Admitted-Finance |
Tender Value
₹9.0 L
EMD Value
₹18,100
Closing Date
13 Aug 2020, 6:00 pmClosed
Executive Engineer Jubbal
HPPWD JUBBAL
SH C/O Breast wall at RD 0/750 to 0/760,0/775 to 0/790,Retaining wall at RD 1/005 to 1/030 and Kharanja Soling at RD 0/750 to 1/300
2020_PWD_39506_1
PW-JD/E-Tender/2020-21 -2210-12 DT 20.07.2020
Open Tender
Civil Works - Roads
Item Rate
60 days
JUBBAL
Please refer Tender documents.
11 documents required · 11 mandatory
₹350
EE Jubbal
₹18,100
18 Aug 2020
4 Aug 2020
14 Aug 2020
4 Aug 2020
13 Aug 2020
4 Aug 2020
Amount
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a any lead and lift , dressing of sides and bottom and backfilling in trenches with excavated suitable material.useful material available from excavation to be properly stacked and handed over to the department free of cost including all leads and lifts, as per HPPWD, specification of 1990 volume-I or as directed by the Engineer-In-Charge
Providing and laying mechanical mixed and vibrated cement concrete for plain/ reinforced concrete in open foundation for all type of structure complete of plain cement concrete nominal mix 1:6:12 (One cement: six sand : twelve graded crushed stone aggregate) 40 mm (forty millimetre) nominal size on ground or under water and curing complete including pumping or bailing out water,dewatering removal of slush as required at site which may arise at the time of laying under water complete for all heights/depths including the cost of form work as per drawing and technical specification clauses 802,803,1202 and 1203 as per direction of Engineer-in-Charge including carriage of material through all modes of transportion with in all leads and lifts and other incidentials.
Providing and Laying concrete concrete 1:4:8 (1cement: 4 sand: 8 graded stone aggregate 40mm nominal size) in open foundations complete as per drawing and technical specification clauses 802, 803, 1202 and 1203 including all leads and lifts, as per HPPWD, specification of 1990 volume-I or as directed by the Engineer-In-Charge
Random rubble masonrystone masonry(un-coursed/brought to courses)with hard stone ofapproved quality in foundation in cement mortar 1:6(1cement:6sand) complete as per drawing and technical specifications Clauses 702, 704, 1202 & 1203.including all leads and lifts, or as per HPPWD,. Specification of 1990 Volume-I, asdirected by the Engineer-In-Charge.
Construction of dry rubble masonary for retaining walls, breast walls,revetment walls and parapets etc. for sub-structure and super structure complete as per drawing and technical specification clauses 704.6 & 1302.5 including all leads and lifts, as per HPPWD, specification of 1990 volume-I as directed by the Engineer-In-Charge
Backfilling with Granular material behind abutment, wing wall and return wall complete as per drawings & technical specification Clause 1204.3.8 including all leads and lifts, as per HPPWD, specification of 1990 volume-I or as directed by the Engineer-In-Charge
Preparation of sub grade by dressing to combor (Earth work for the cutting involved for sub-grade to be paid for separately depending upon the classification of soil completed as per HP.PWD specifications and as directed by the Engineer in Charge.
Consolidation of sub grade with road roller including making good the undulation etc. with earth or quarry soil etc. and rerolling the sub-grade completed as per HP.PWD specifications and as directed by the Engineer in Charge.
Stone soling properly hand-packed filling interstices with Kharanja stone and consolidating with power road roller to the requested gradient and comber including spreading watering and rolling of binding materials moorum or earth etc. complete as per HP.PWD specification. including all leads and lifts, as per HPPWD, specification of 1990 Volume-I, as directed by the Engineer-In-Charge.
MOHINDER SINGH
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .