Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹13.3 LAccepted-AOC | ₹13.3 L | L1 | Accepted-AOC L1 Tenderer |
| 2 | L2₹15.5 L+₹2.2 L (16.3%)Rejected-AOC | ₹15.5 L+₹2.2 L (16.3%) | L2 | Rejected-AOC L2 Tenderer |
| 3 | L3₹16.2 L+₹2.9 L (22.0%)Rejected-AOC | ₹16.2 L+₹2.9 L (22.0%) | L3 | Rejected-AOC L3 Tenderer |
| 4 | L4₹16.3 L+₹3.0 L (22.4%)Rejected-AOC | ₹16.3 L+₹3.0 L (22.4%) | L4 | Rejected-AOC L4 Tenderer |
| Sl No | Description | Qty | Unit | KANDHAVEL SKR CONSTRUCTIONS PRIVATE LIMITED L2 | TKM BUILDER L3 | D.KOTHANDARAMAN L1 | T. RAJMOHAN L4 |
|---|---|---|---|---|---|---|---|
| 1.00Name of Work: Providing Cement Concrete Pavement to Arasathamman Koil street in Punjarasanthangal in Kancheerpuam Block , Kancheerpuam District . ESTIMATE AMOUNT : 1663000 SCHEM : UNION GENERAL FUND 2026-27 | |||||||
| 2.00 | Supplying and Erection centering charges including cost and conveyance and all labour charges etc, | 111 | sqm | 395 ₹43,845 | 360 ₹39,960 | 365 ₹40,515 | 350 ₹38,850 Lowest |
| 3.00 | Cement Concrete 1:4:8 mix using 40 mm ISS HBG metal including cost and conveyance of materials to site and all other labour charges, etc. complete | 83.25 | cum | 4,650 ₹3,87,112.5 | 5,220 ₹4,34,565 | 4,400 ₹3,66,300 Lowest | 5,300 ₹4,41,225 |
| 4.00 | Cement Concrete 1:1-1/2:3 (One Cement, One and a half crushed stone M.Sand and Three hard broken stone jelly) using 20 mm gauge hard broken granite stone jelly for all RCC items of works excluding cost of reinforcement grill and fabricating charges centering and shuttering but including laying, vibrating with mechanical vibrators, finishing, curing, etc. and providing fixtures like fan clamps in the RCC floor / roof slabs wherever necessary and bearing surfaces of walls, beams etc. shall be finished smooth with Cement Mortar 1:3 (One Cement and Three M.Sand) and kraft paper laid over it without claiming extra, etc., complete complying with standard specification and as directed by the departmental officers | 124.87 | cum | 6,865 ₹8,57,232.55 | 7,160 ₹8,94,069.2 | 5,720 ₹7,14,256.4 Lowest | 7,150 ₹8,92,820.5 |
| 5.00 | Provision for Bitumenious Pad exposition joint. | 33 | sqm | 700 ₹23,100 | 224 ₹7,392 | 200 ₹6,600 Lowest | 220 ₹7,260 |
| 6.00 | GST Amount for providing Service to Government Contract Works for the above Construction Work. { GST Amount is the Total GST Amount for overall quoted amount Construction above this row in column "BB" for all works in this package}
(Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD) | 1 | GST Amount | 2,36,032.21 ₹2,36,032.21 | 2,47,677.52 ₹2,47,677.52 | 2,02,980.85 ₹2,02,980.85 Lowest | 2,48,427.99 ₹2,48,427.99 |
Tender Value
₹16.6 L
EMD Value
₹16,630
Closing Date
19 Aug 2026, 3:00 pmClosed
BDO (B.P)
BDO office ,Sirukaveripakkam
Providing Ceemnt Concrete Pavement to Arasathamman Koil Street in Punjarasanthangal Panchayat in Kancheepuram Panchayat Union in Kancheepuram District.
2026_RDTN_690569_1
Res .No 1151 /2026 /A2 Dt.03.08.2026
Open Tender
Civil Works - Roads
Item Rate
120 days
BDO Office, Sirukaveripakkam
Please refer Tender documents.
8 documents required · 8 mandatory
₹0
₹16,630
31 Aug 2026
4 Aug 2026
19 Aug 2026
4 Aug 2026
19 Aug 2026
4 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Name of Work: Providing Cement Concrete Pavement to Arasathamman Koil street in Punjarasanthangal in Kancheerpuam Block , Kancheerpuam District . ESTIMATE AMOUNT : 1663000 SCHEM : UNION GENERAL FUND 2026-27 | - | - | - | - |
| 2 | Supplying and Erection centering charges including cost and conveyance and all labour charges etc, | 111 | sqm | - | - |
| 3 | Cement Concrete 1:4:8 mix using 40 mm ISS HBG metal including cost and conveyance of materials to site and all other labour charges, etc. complete | 83.25 | cum | - | - |
| 4 | Cement Concrete 1:1-1/2:3 (One Cement, One and a half crushed stone M.Sand and Three hard broken stone jelly) using 20 mm gauge hard broken granite stone jelly for all RCC items of works excluding cost of reinforcement grill and fabricating charges centering and shuttering but including laying, vibrating with mechanical vibrators, finishing, curing, etc. and providing fixtures like fan clamps in the RCC floor / roof slabs wherever necessary and bearing surfaces of walls, beams etc. shall be finished smooth with Cement Mortar 1:3 (One Cement and Three M.Sand) and kraft paper laid over it without claiming extra, etc., complete complying with standard specification and as directed by the departmental officers | 124.87 | cum | - | - |
| 5 | Provision for Bitumenious Pad exposition joint. | 33 | sqm | - | - |
| 6 | GST Amount for providing Service to Government Contract Works for the above Construction Work. { GST Amount is the Total GST Amount for overall quoted amount Construction above this row in column "BB" for all works in this package}
(Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD) | 1 | GST Amount | - | - |
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 1.23 MB
pricebid.pdf
Additional Documents • 0.64 MB
BOQ_830242.xls
BOQ • 0.29 MB
Technicalbid.pdf
Tender Documents • 0.91 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .