Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹23.8 CrAdmitted-Finance | -36.60% | ₹23.8 Cr | L1 | Admitted-Finance |
| 2 | L2₹25.0 Cr+₹1.2 Cr (5.21%)Admitted-Finance NO 91 GROUND FLOOR 3RD CROSS ROAD OPPOSITE VASAVI KANNIKA PARAMESHWARI TEMPLE BENGALURU BENGALURU 560021 KARNATAKA INDIA | BENGALURU | BENGALURU | KARNATAKA | 560021 | -33.30% | ₹25.0 Cr+₹1.2 Cr (5.21%) | L2 | Admitted-Finance |
| 3 | Rejected-Technical | - | - | - | Rejected-Technical Non Responsive Bidder failed in Threshold technical capacity and not submitted the affidavit in the prescribed format as per Annexure IX of Appendix IA |
| 4 | Rejected-Technical | - | - | - | Rejected-Technical Non Responsive Bidder failed in Threshold technical capacity |
Tender Value
₹37.6 Cr
EMD Value
₹37.5 L
Closing Date
7 Feb 2025, 3:00 pmClosed
Regional officer MoRTH Bengaluru
Regional office MoRTH Bengaluru
Performance Based Maintenance Contract (PBMC) for the stretches from Km 22.50 to 71.00 of N.H 69 Upponi Talaguppa section in the State of Karnataka
2024_MoRTH_840379_1
RW/BNG/PBMC/KWR DVN/NH-69/KM 22.50-71.00/01/2024
Open Tender
Civil Works - Highways
Percentage
1825 days
Upponi Talaguppa section
Please refer Tender documents.
5 documents required · 5 mandatory
₹11,800
Rs 10000 through Bharatkosh and Rs 1800 through DD
₹37.5 L
Regional office MoRTH Bengaluru
16 May 2025
18 Dec 2024
10 Feb 2025
18 Dec 2024
7 Feb 2025
18 Dec 2024
13 Jan 2025
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.1 | ROUTINE MAINTENANCE (Lump Sum)
[for Total 60 months] (For more details, please refer to RFP) | - | Nos | 10,91,22,795 | - |
| 2.1 | INITIAL RECTIFICATION WORKS (LumpSum)[To be completed within 06 months from the notice to proceed] (For more details, please refer to RFP) | - | Nos | 7,48,06,323.92 | - |
| 3.1 | PERIODICAL MAINTENANCE WORKS
(Lump Sum)
[To be completed as decided by the Engineer but overlay of Highway to be completed within 24/48 months
(as the case may be) from the date of notice to proceed]. (For more details, please refer to RFP) | - | Nos | 17,62,49,172.36 | - |
| 4.1 | EMERGENCY WORKS (Unit Rates) (For more details, please refer to RFP) | - | Nos | 1,53,21,739.5 | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.33 MB
RFPPBMCNH69.pdf
Tender Documents • 3.95 MB
BOQ_883359.xls
BOQ • 0.29 MB
BOQ.xls
BOQ • 0.29 MB
Tenderdocument.pdf
Tender Documents • 3.95 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .