Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Tender Value
₹40 L
EMD Value
₹40,000
Closing Date
28 Dec 2023, 4:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Block Developemnt officer Tenkasi
Block Development officer Tenkasi
Construction of 1,00,000 litre OHT(12m Staging Height) at Sumai-Vallam Pothigai Nagar in Sumaitheerthapuram Panchayat in Tenkasi Panchayat union.in Tenkasi District under JAL JEEVAN MISSION 2023-24
2023_RDTN_402334_1
BDOBLK-255-2023-B3 JJM 2023-24
Open Tender
Civil Works
Works
180 days
Tenkasi
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹40,000
Yes
28 Dec 2023
22 Dec 2023
28 Dec 2023
22 Dec 2023
28 Dec 2023
22 Dec 2023
Amount
1.Construction of 1,00,000 litre OHT(12m Staging Height) at Sumai-Vallam Pothigai Nagar in Sumaitheerthapuram Panchayat in Tenkasi Panchayat union.
Earth work excavation for foundation and depositing on bank within an initial lead of 10m and an initial lift of 2m for the following classification of soil including shoring, strutting, bailing out water wherever necessary and all other incidental charges and as directed by the Officers.
First depth of 2m
2 nd Depth
Sand filling for foundation with clear M sand including cost of sand watering, ramming and consolidation etc complete as directed by TWAD Board officers.
Cement concrete 1:4:8 (One cement, four sand and eight course aggregate of 40mm size hard blue granite broken stone) for levelling course including the cost of mixing, placing the concrete in position, consolidating finishing the ends complete and curing etc. complete and as directed by TWAD Board Officers for works beyond 1.50m from GL for footing.
R.C.C. 1:1.5:2(M30) (one cement one and half sand and two 20mm &10mm HBG stone) for Floor slab floor beam &side wall excluding the cost of reinforcement, centering and shuttering but including the cost of mixing, placing, vibrating of concrete curing and finishing etc., complete as directed by the officers.
For footing below G.L. ( 1,50 to 4,50 below GL )
For Column and Brace upto G.L ( 0 to1,50 below GL )
For column and brace I 0 to 4.5m from GL
For column and brace II 4.5m to 7.32m from GL
For column and brace III 7.32 to 10.98m from GL
For column beam floor slab side wall from 10.98m to 14.64 m from GL
For side wall, hance and Roof slab from 14.64 m to 18.30 m from GL
Supplying and erecting steel centering for sides and soffits I including necessary supports' and shuttering to the required height for RCC items using MS sheets of suitable size of BG.10 stiffeneq with welded MS angles of size 25mm x 25mm x3mm of boarding
PLANE SURFACES
Below& 3.30m ht from G.L
Above GL (+3.300 - +4.300m)
Above GL 7.3. to 8.30 m
Above GL 11.30 to 12.30m
CURVED SURFACE
Above GL 0.00 to 3.30 M
Above GL (+11.300 - +12.300m)
SQUARE COLUMN
For column GL 0 to 3.30M
For column ( 3.31m to 4.30m ).
For column ( 4.31m to 5.30m).
For Column (5.31m to 6.30m )
For Column (6.31m to 7.30m )
For Column (7.31m to 8.30m )
For Column (8.31m to 9.30m )
For Column (9.31m to 10.30m )
For Column (10.31m to 11.30m )
For Column (11.30m to 11.55m )
Central circular column:
Column above 0 to 3.3m
For column ( 3.31m to 4.30m ).
For column ( 4.31m to 5.30m).
For Column (5.31m to 6.30m )
For Column (6.31m to 7.30m )
For Column (7.31m to 8.30m )
For Column (8.31m to 9.30m )
For Column (9.31m to 10.30m )
For Column (10.31m to 11.30m )
Exterior Emulsion painting two coats with best approved quality and colour paint over one coat of Base coat including cost and convyance of all materials to work site and labour charges etc., complete.
Supplying, fabricating and placing in position of HSD steel rods for Reinforcement including the cost of steel and binding wire etc., complete and as directed by Deparment officers.
Refilling the foundation with excavated earth including consolidation as directed by the TWAD Board officers.
Providing MS Ladder & Hand rails arrangements in 100,000 Lits. Capacity OHT With 12.00m Staging Height.
Providing and fixing of RCC inner access ladder in RCC 1:1.5:3 (one cement, one and half sane! and three aggregates) using 20mm HBG stone for OHT including cost of reinforcement, placing grill in position, centering shuttering charges, mixing concrete cur
Providing GI ventilating arrangements mosquito proof nylon net with 50 mm GI pipes and cowl and as directed by Deparment officers
Providing manhole cover of size 1x1 0.60 X 0.60 M in RCC 1: 1.5:3 with suitable reinforcement and 5O x 5O x 6mm MS angle fixed along edges and as directed by Department officers.
Supply & Delivery of following Pipes and specials for OHT connection
Supply of GI Pipes for OHT Connections 65 mm dia
65mm Ø GI Elbow
65mm Ø GI coupling
65mm Ø GI Flange Set
65mm Ø GM Gate valve
Provision for Rainwater harvesting including all chrages etc complete
Earth work excavation in all clauses of soils with initial lead and lift except hard rock requiring blasting etc., complete for foundation as per SS 20B.
For first depth of 2m
For Core wall
Cement concrete 1:4:8 mix using 40mm ISS HBG metal including all cost and conveyance and all labour charges etc., complete
Brick work in CM 1:5 mix using third class country bricks of size 8 3/4 x 4 1/4 x 2 3/4 including all cost and conveyance of materials and labour charges etc., complete
Plastering with CM 1:5 mix using to 12mm thick including all cost and conveyance of all materials and all labour charges etc., complete.
Collection and supply of 40mm HBG metal and filling in to the recharge pits including cost and conveyance to the site and all labour charges for filling as per standard specifications.
Cement concrete 1:2:4 mix using 20mm ISS HBG metal including all cost and conveyance and all labour charges etc., complete
Electro Chloranation Disinfection - common salt as per TWAD SOR - page no -57 clause 21.2 (50,001-1,00,000 )
Pipe line Arrangement
Providing Dismantling of CC Road Cutting work including all cost and conveyance all labour charges etc complete.
Earthwork excavation in all clauses of soil such as gravel, hard gravelly soil, hard stiff clay, stiff black cotton soils including all labour charges etc complete.
Supply and Delivery of 90mm dia PVC Pipe 6Ksc including cost and conveyance and all Labour charges etc complete.
Supply and Delivery of 63mm dia PVC Pipe 6Ksc including cost and conveyance and all Labour charges etc complete.
Jointing of Laying of 90mm dia PVC Pipes including Cost and Conveyance and all Labour Charges etc, Complete.
Jointing of Laying of 63mm dia PVC Pipes including Cost and Conveyance and all Labour Charges etc, Complete.
Refilling the excavated trenches including all labour charges etc complete.
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for 10 cum.
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for bed blocks for 10 cum
GST Amount for providing Service to Government Contract Works for the above RENEWAL Works. { GST Amount is the Total GST Amount for overall quoted amount above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
P.Murugan
stage.html
html • 0.02 MB
finance_478831.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .