| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.1 CrAdmitted-Finance | ₹1.1 Cr | L1 | Admitted-Finance |
| 2 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| Sl No | Description | Qty | Unit | G.MANI L1 |
|---|---|---|---|---|
| 1.00PART I: Rejuvenation of Pongai Ammankoil kulam in Thinaiyampoondi Panchayat Estimate Amount : Rs.12.83 Lakh | ||||
| 2.00 | Clearing the Scrub jungle with uprooting and disposing of the same as directed by the Engineer in charge of the Works and as per technical specification | 987 | sqm | - |
| 3.00 | Earthwork excavation in all clauses of soil except hard rock which required blasting such as hard red earth, shalls, murrams including all cost and all labour charges etc., complete as per SS 20 B for foundation | 979.6 | cum | - |
| 4.00 | Sectioning during forming bund when earth moving machineries, lorries and roller are used for consolidation | 979.6 | cum | - |
| 5.00Construction of Retaining wall | ||||
| 6.00 | Earthwork in all soils except hard rock requiring blasting and conveying with a lead of 0 to 100 M by deploying earth moving machineries and tippers for formation of bund in layers of suitable thickness, depending upon type of compaction equipment deploy | 44.44 | cum | - |
| 7.00 | Cement Concrete 1:4:8 mix using 40mm metal including cost and conveyanceof all materials to work site and all labour charges etc. | 5.8 | cum | - |
| 8.00 | Supplying and erecting centering shuttering with necessary supports including cost and conveyance and all labour charges etc. | 73.6 | sqm | - |
| 9.00 | Cement Concrete 1:3:6 mix using 40mm gauge hard broken granite stone jelly for foundation including cost and conveyance of all materials to work site and all labour charges etc. as per standard specifications | 22.08 | cum | - |
| 10.00 | Plastering with CM 1:4 20mm thickness including cost and conveyance and all labour charges etc., | 16.56 | sqm | - |
Tender Value
₹1.2 Cr
EMD Value
₹1.2 L
Closing Date
13 Feb 2020, 3:00 pmClosed
The Project Director DRDA Kancheepuram
O/o The Project Director DRDA Kancheepuram
Rejuvenation of 7 Nos. of Ponds in Uthiramerur Block of Kancheepuram District for the year 2019-20 under SFC - PU and DP Grant 2019-20 having Pkg No.04/2019-20
2020_RDTN_157187_1
DIPR/646/Tenders/2020, dt.30.01.2020
Open Tender
Civil Works
Item Rate
180 days
Uthiramerur Block
Please refer Tender documents.
9 documents required · 9 mandatory
₹0
₹1.2 L
O/o The Project Director DRDA Kancheepuram
21 Feb 2020
6 Feb 2020
13 Feb 2020
6 Feb 2020
13 Feb 2020
6 Feb 2020
10 Feb 2020
Amount
PART I: Rejuvenation of Pongai Ammankoil kulam in Thinaiyampoondi Panchayat Estimate Amount : Rs.12.83 Lakh
Clearing the Scrub jungle with uprooting and disposing of the same as directed by the Engineer in charge of the Works and as per technical specification
Earthwork excavation in all clauses of soil except hard rock which required blasting such as hard red earth, shalls, murrams including all cost and all labour charges etc., complete as per SS 20 B for foundation
Sectioning during forming bund when earth moving machineries, lorries and roller are used for consolidation
Construction of Retaining wall
Earthwork in all soils except hard rock requiring blasting and conveying with a lead of 0 to 100 M by deploying earth moving machineries and tippers for formation of bund in layers of suitable thickness, depending upon type of compaction equipment deploy
Cement Concrete 1:4:8 mix using 40mm metal including cost and conveyanceof all materials to work site and all labour charges etc.
Supplying and erecting centering shuttering with necessary supports including cost and conveyance and all labour charges etc.
Cement Concrete 1:3:6 mix using 40mm gauge hard broken granite stone jelly for foundation including cost and conveyance of all materials to work site and all labour charges etc. as per standard specifications
Plastering with CM 1:4 20mm thickness including cost and conveyance and all labour charges etc.,
Construction of Bathing Ghat, Steps, Outer platform
Earthwork in all soils except hard rock requiring blasting and conveying with a lead of 0 to 100 M by deploying earth moving machineries and tippers for formation of bund in layers of suitable thickness, depending upon type of compaction equipment deploy
Cement Concrete 1:4:8 mix using 40mm metal including cost and conveyanceof all materials to work site and all labour charges etc.
Supplying and erecting centering shuttering with necessary supports including cost and conveyance and all labour charges etc.
Cement Concrete 1:3:6 mix using 40mm gauge hard broken granite stone jelly for foundation including cost and conveyance of all materials to work site and all labour charges etc. as per standard specifications
Cement Concrete 1:3:6 mix using 20mm gauge hard broken granite stone jelly for foundation including cost and conveyance of all materials to work site and all labour charges etc. as per standard specifications
Cement Concrete 1:2:4 mix using 20mm gauge hard broken granite stone jelly for foundation including cost and conveyance of all materials to work site and all labour charges etc. as per standard specifications
Plastering with CM 1:4 20mm thickness including cost and conveyance and all labour charges etc.,
Construction of steps over bund
Earthwork in all soils except hard rock requiring blasting and conveying with a lead of 0 to 100 M by deploying earth moving machineries and tippers for formation of bund in layers of suitable thickness, depending upon type of compaction equipment deploy
Cement Concrete 1:4:8 mix using 40mm metal including cost and conveyanceof all materials to work site and all labour charges etc.
Supplying and erecting centering shuttering with necessary supports including cost and conveyance and all labour charges etc.
Cement Concrete 1:3:6 mix using 40mm gauge hard broken granite stone jelly for foundation including cost and conveyance of all materials to work site and all labour charges etc. as per standard specifications
Cement Concrete 1:2:4 mix using 20mm gauge hard broken granite stone jelly for foundation including cost and conveyance of all materials to work site and all labour charges etc. as per standard specifications
Plastering with CM 1:4 20mm thickness including cost and conveyance and all labour charges etc.,
Construction of Inlet channel structure
Earthwork in all soils except hard rock requiring blasting and conveying with a lead of 0 to 100 M by deploying earth moving machineries and tippers for formation of bund in layers of suitable thickness, depending upon type of compaction equipment deploy
Cement Concrete 1:4:8 mix using 40mm metal including cost and conveyanceof all materials to work site and all labour charges etc.
Supplying and erecting centering shuttering with necessary supports including cost and conveyance and all labour charges etc.
Below Ground level
Above Ground level
Cement Concrete 1:3:6 mix using 40mm gauge hard broken granite stone jelly for foundation including cost and conveyance of all materials to work site and all labour charges etc. as per standard specifications
Cement Concrete 1:2:4 mix using 20mm gauge hard broken granite stone jelly for foundation including cost and conveyance of all materials to work site and all labour charges etc. as per standard specifications
Construction of Outlet channel structure
Earthwork in all soils except hard rock requiring blasting and conveying with a lead of 0 to 100 M by deploying earth moving machineries and tippers for formation of bund in layers of suitable thickness, depending upon type of compaction equipment deploy
Cement Concrete 1:4:8 mix using 40mm metal including cost and conveyanceof all materials to work site and all labour charges etc.
Supplying and erecting centering shuttering with necessary supports including cost and conveyance and all labour charges etc.
Below Ground level
Above Ground level
Cement Concrete 1:3:6 mix using 40mm gauge hard broken granite stone jelly for foundation including cost and conveyance of all materials to work site and all labour charges etc. as per standard specifications
Cement Concrete 1:2:4 mix using 20mm gauge hard broken granite stone jelly for foundation including cost and conveyance of all materials to work site and all labour charges etc. as per standard specifications
Construction of Revetment
Earthwork in all soils except hard rock requiring blasting and conveying with a lead of 0 to 100 M by deploying earth moving machineries and tippers for formation of bund in layers of suitable thickness, depending upon type of compaction equipment deploy
Cement Concrete 1:4:8 mix using 40mm metal including cost and conveyanceof all materials to work site and all labour charges etc.
Supplying and erecting centering shuttering with necessary supports including cost and conveyance and all labour charges etc.
Cement Concrete 1:3:6 mix using 40mm gauge hard broken granite stone jelly for foundation including cost and conveyance of all materials to work site and all labour charges etc. as per standard specifications
Providing gravel backing 15 cm thick for revetment including machin the same for premeasurement spreading and woaring with water to plastic waste complete as directed by the Engineer in charge of work
Rough Stone dry packing for revetment and apron using new stones obtained by approved sources including the cost of new wedges for filling the gaps etc., and complete on the work(using old stones)
PART II: Rejuvenation of Amaran kuttai in Pulivoy Panchayat Estimate Amount : Rs.16.84 Lakh
Clearing the Scrub jungle with uprooting and disposing of the same as directed by the Engineer in charge of the Works and as per technical specification
Earthwork excavation in all clauses of soil except hard rock which required blasting such as hard red earth, shalls, murrams including all cost and all labour charges etc., complete as per SS 20 B for foundation
Sectioning during forming bund when earth moving machineries, lorries and roller are used for consolidation
Construction of Retaining wall
Earthwork in all soils except hard rock requiring blasting and conveying with a lead of 0 to 100 M by deploying earth moving machineries and tippers for formation of bund in layers of suitable thickness, depending upon type of compaction equipment deploy
Cement Concrete 1:4:8 mix using 40mm metal including cost and conveyanceof all materials to work site and all labour charges etc.
Supplying and erecting centering shuttering with necessary supports including cost and conveyance and all labour charges etc.
Cement Concrete 1:3:6 mix using 40mm gauge hard broken granite stone jelly for foundation including cost and conveyance of all materials to work site and all labour charges etc. as per standard specifications
Plastering with CM 1:4 20mm thickness including cost and conveyance and all labour charges etc.,
Construction of Bathing Ghat, Steps, Outer platform
Earthwork in all soils except hard rock requiring blasting and conveying with a lead of 0 to 100 M by deploying earth moving machineries and tippers for formation of bund in layers of suitable thickness, depending upon type of compaction equipment deploy
Cement Concrete 1:4:8 mix using 40mm metal including cost and conveyanceof all materials to work site and all labour charges etc.
Supplying and erecting centering shuttering with necessary supports including cost and conveyance and all labour charges etc.
Cement Concrete 1:3:6 mix using 40mm gauge hard broken granite stone jelly for foundation including cost and conveyance of all materials to work site and all labour charges etc. as per standard specifications
Cement Concrete 1:3:6 mix using 20mm gauge hard broken granite stone jelly for foundation including cost and conveyance of all materials to work site and all labour charges etc. as per standard specifications
Cement Concrete 1:2:4 mix using 20mm gauge hard broken granite stone jelly for foundation including cost and conveyance of all materials to work site and all labour charges etc. as per standard specifications
Plastering with CM 1:4 20mm thickness including cost and conveyance and all labour charges etc.,
Construction of steps over bund
Earthwork in all soils except hard rock requiring blasting and conveying with a lead of 0 to 100 M by deploying earth moving machineries and tippers for formation of bund in layers of suitable thickness, depending upon type of compaction equipment deploy
Cement Concrete 1:4:8 mix using 40mm metal including cost and conveyanceof all materials to work site and all labour charges etc.
Supplying and erecting centering shuttering with necessary supports including cost and conveyance and all labour charges etc.
Cement Concrete 1:3:6 mix using 40mm gauge hard broken granite stone jelly for foundation including cost and conveyance of all materials to work site and all labour charges etc. as per standard specifications
Cement Concrete 1:2:4 mix using 20mm gauge hard broken granite stone jelly for foundation including cost and conveyance of all materials to work site and all labour charges etc. as per standard specifications
Plastering with CM 1:4 20mm thickness including cost and conveyance and all labour charges etc.,
Construction of Inlet channel structure
Earthwork in all soils except hard rock requiring blasting and conveying with a lead of 0 to 100 M by deploying earth moving machineries and tippers for formation of bund in layers of suitable thickness, depending upon type of compaction equipment deploy
Cement Concrete 1:4:8 mix using 40mm metal including cost and conveyanceof all materials to work site and all labour charges etc.
Supplying and erecting centering shuttering with necessary supports including cost and conveyance and all labour charges etc.
Below Ground level
Above Ground level
Cement Concrete 1:3:6 mix using 40mm gauge hard broken granite stone jelly for foundation including cost and conveyance of all materials to work site and all labour charges etc. as per standard specifications
Cement Concrete 1:2:4 mix using 20mm gauge hard broken granite stone jelly for foundation including cost and conveyance of all materials to work site and all labour charges etc. as per standard specifications
Construction of Outlet channel structure
Earthwork in all soils except hard rock requiring blasting and conveying with a lead of 0 to 100 M by deploying earth moving machineries and tippers for formation of bund in layers of suitable thickness, depending upon type of compaction equipment deploy
Cement Concrete 1:4:8 mix using 40mm metal including cost and conveyanceof all materials to work site and all labour charges etc.
Supplying and erecting centering shuttering with necessary supports including cost and conveyance and all labour charges etc.
Below Ground level
Above Ground level
Cement Concrete 1:3:6 mix using 40mm gauge hard broken granite stone jelly for foundation including cost and conveyance of all materials to work site and all labour charges etc. as per standard specifications
Cement Concrete 1:2:4 mix using 20mm gauge hard broken granite stone jelly for foundation including cost and conveyance of all materials to work site and all labour charges etc. as per standard specifications
Construction of Revetment
Earthwork in all soils except hard rock requiring blasting and conveying with a lead of 0 to 100 M by deploying earth moving machineries and tippers for formation of bund in layers of suitable thickness, depending upon type of compaction equipment deploy
Cement Concrete 1:4:8 mix using 40mm metal including cost and conveyanceof all materials to work site and all labour charges etc.
Supplying and erecting centering shuttering with necessary supports including cost and conveyance and all labour charges etc.
Cement Concrete 1:3:6 mix using 40mm gauge hard broken granite stone jelly for foundation including cost and conveyance of all materials to work site and all labour charges etc. as per standard specifications
Providing gravel backing 15 cm thick for revetment including machin the same for premeasurement spreading and woaring with water to plastic waste complete as directed by the Engineer in charge of work
Rough Stone dry packing for revetment and apron using new stones obtained by approved sources including the cost of new wedges for filling the gaps etc., and complete on the work(using old stones)
PART III: Rejuvenation of Kuppan kulam in Pulivoy Panchayat Estimate Amount : Rs.18.25 Lakh
Clearing the Scrub jungle with uprooting and disposing of the same as directed by the Engineer in charge of the Works and as per technical specification
Earthwork excavation in all clauses of soil except hard rock which required blasting such as hard red earth, shalls, murrams including all cost and all labour charges etc., complete as per SS 20 B for foundation
Sectioning during forming bund when earth moving machineries, lorries and roller are used for consolidation
Construction of Retaining wall
Earthwork in all soils except hard rock requiring blasting and conveying with a lead of 0 to 100 M by deploying earth moving machineries and tippers for formation of bund in layers of suitable thickness, depending upon type of compaction equipment deploy
Cement Concrete 1:4:8 mix using 40mm metal including cost and conveyanceof all materials to work site and all labour charges etc.
Supplying and erecting centering shuttering with necessary supports including cost and conveyance and all labour charges etc.
Cement Concrete 1:3:6 mix using 40mm gauge hard broken granite stone jelly for foundation including cost and conveyance of all materials to work site and all labour charges etc. as per standard specifications
Plastering with CM 1:4 20mm thickness including cost and conveyance and all labour charges etc.,
Construction of Bathing Ghat, Steps, Outer platform
Earthwork in all soils except hard rock requiring blasting and conveying with a lead of 0 to 100 M by deploying earth moving machineries and tippers for formation of bund in layers of suitable thickness, depending upon type of compaction equipment deploy
Cement Concrete 1:4:8 mix using 40mm metal including cost and conveyanceof all materials to work site and all labour charges etc.
Supplying and erecting centering shuttering with necessary supports including cost and conveyance and all labour charges etc.
Cement Concrete 1:3:6 mix using 40mm gauge hard broken granite stone jelly for foundation including cost and conveyance of all materials to work site and all labour charges etc. as per standard specifications
Cement Concrete 1:3:6 mix using 20mm gauge hard broken granite stone jelly for foundation including cost and conveyance of all materials to work site and all labour charges etc. as per standard specifications
Cement Concrete 1:2:4 mix using 20mm gauge hard broken granite stone jelly for foundation including cost and conveyance of all materials to work site and all labour charges etc. as per standard specifications
Plastering with CM 1:4 20mm thickness including cost and conveyance and all labour charges etc.,
Construction of steps over bund
Earthwork in all soils except hard rock requiring blasting and conveying with a lead of 0 to 100 M by deploying earth moving machineries and tippers for formation of bund in layers of suitable thickness, depending upon type of compaction equipment deploy
Cement Concrete 1:4:8 mix using 40mm metal including cost and conveyanceof all materials to work site and all labour charges etc.
Supplying and erecting centering shuttering with necessary supports including cost and conveyance and all labour charges etc.
Cement Concrete 1:3:6 mix using 40mm gauge hard broken granite stone jelly for foundation including cost and conveyance of all materials to work site and all labour charges etc. as per standard specifications
Cement Concrete 1:2:4 mix using 20mm gauge hard broken granite stone jelly for foundation including cost and conveyance of all materials to work site and all labour charges etc. as per standard specifications
Plastering with CM 1:4 20mm thickness including cost and conveyance and all labour charges etc.,
Construction of Inlet channel structure
Earthwork in all soils except hard rock requiring blasting and conveying with a lead of 0 to 100 M by deploying earth moving machineries and tippers for formation of bund in layers of suitable thickness, depending upon type of compaction equipment deploy
Cement Concrete 1:4:8 mix using 40mm metal including cost and conveyanceof all materials to work site and all labour charges etc.
Supplying and erecting centering shuttering with necessary supports including cost and conveyance and all labour charges etc.
Below Ground level
Above Ground level
Cement Concrete 1:3:6 mix using 40mm gauge hard broken granite stone jelly for foundation including cost and conveyance of all materials to work site and all labour charges etc. as per standard specifications
Cement Concrete 1:2:4 mix using 20mm gauge hard broken granite stone jelly for foundation including cost and conveyance of all materials to work site and all labour charges etc. as per standard specifications
Construction of Outlet channel structure
Earthwork in all soils except hard rock requiring blasting and conveying with a lead of 0 to 100 M by deploying earth moving machineries and tippers for formation of bund in layers of suitable thickness, depending upon type of compaction equipment deploy
Cement Concrete 1:4:8 mix using 40mm metal including cost and conveyanceof all materials to work site and all labour charges etc.
Supplying and erecting centering shuttering with necessary supports including cost and conveyance and all labour charges etc.
Below Ground level
Above Ground level
Cement Concrete 1:3:6 mix using 40mm gauge hard broken granite stone jelly for foundation including cost and conveyance of all materials to work site and all labour charges etc. as per standard specifications
Cement Concrete 1:2:4 mix using 20mm gauge hard broken granite stone jelly for foundation including cost and conveyance of all materials to work site and all labour charges etc. as per standard specifications
Construction of Revetment
Earthwork in all soils except hard rock requiring blasting and conveying with a lead of 0 to 100 M by deploying earth moving machineries and tippers for formation of bund in layers of suitable thickness, depending upon type of compaction equipment deploy
Cement Concrete 1:4:8 mix using 40mm metal including cost and conveyanceof all materials to work site and all labour charges etc.
Supplying and erecting centering shuttering with necessary supports including cost and conveyance and all labour charges etc.
Cement Concrete 1:3:6 mix using 40mm gauge hard broken granite stone jelly for foundation including cost and conveyance of all materials to work site and all labour charges etc. as per standard specifications
Providing gravel backing 15 cm thick for revetment including machin the same for premeasurement spreading and woaring with water to plastic waste complete as directed by the Engineer in charge of work
Rough Stone dry packing for revetment and apron using new stones obtained by approved sources including the cost of new wedges for filling the gaps etc., and complete on the work(using old stones)
PART IV : Rejuvenation of Perumal Koil kulam in Kattankulam Panchayat Estimate Amount : Rs.25.18 Lakh
Clearing the Scrub jungle with uprooting and disposing of the same as directed by the Engineer in charge of the Works and as per technical specification
Earthwork excavation in all clauses of soil except hard rock which required blasting such as hard red earth, shalls, murrams including all cost and all labour charges etc., complete as per SS 20 B for foundation
Sectioning during forming bund when earth moving machineries, lorries and roller are used for consolidation
Construction of Retaining wall
Earthwork in all soils except hard rock requiring blasting and conveying with a lead of 0 to 100 M by deploying earth moving machineries and tippers for formation of bund in layers of suitable thickness, depending upon type of compaction equipment deploy
Cement Concrete 1:4:8 mix using 40mm metal including cost and conveyanceof all materials to work site and all labour charges etc.
Supplying and erecting centering shuttering with necessary supports including cost and conveyance and all labour charges etc.
Cement Concrete 1:3:6 mix using 40mm gauge hard broken granite stone jelly for foundation including cost and conveyance of all materials to work site and all labour charges etc. as per standard specifications
Plastering with CM 1:4 20mm thickness including cost and conveyance and all labour charges etc.,
Construction of Bathing Ghat, Steps, Outer platform
Earthwork in all soils except hard rock requiring blasting and conveying with a lead of 0 to 100 M by deploying earth moving machineries and tippers for formation of bund in layers of suitable thickness, depending upon type of compaction equipment deploy
Cement Concrete 1:4:8 mix using 40mm metal including cost and conveyanceof all materials to work site and all labour charges etc.
Supplying and erecting centering shuttering with necessary supports including cost and conveyance and all labour charges etc.
Cement Concrete 1:3:6 mix using 40mm gauge hard broken granite stone jelly for foundation including cost and conveyance of all materials to work site and all labour charges etc. as per standard specifications
Cement Concrete 1:3:6 mix using 20mm gauge hard broken granite stone jelly for foundation including cost and conveyance of all materials to work site and all labour charges etc. as per standard specifications
Cement Concrete 1:2:4 mix using 20mm gauge hard broken granite stone jelly for foundation including cost and conveyance of all materials to work site and all labour charges etc. as per standard specifications
Plastering with CM 1:4 20mm thickness including cost and conveyance and all labour charges etc.,
Construction of steps over bund
Earthwork in all soils except hard rock requiring blasting and conveying with a lead of 0 to 100 M by deploying earth moving machineries and tippers for formation of bund in layers of suitable thickness, depending upon type of compaction equipment deploy
Cement Concrete 1:4:8 mix using 40mm metal including cost and conveyanceof all materials to work site and all labour charges etc.
Supplying and erecting centering shuttering with necessary supports including cost and conveyance and all labour charges etc.
Cement Concrete 1:3:6 mix using 40mm gauge hard broken granite stone jelly for foundation including cost and conveyance of all materials to work site and all labour charges etc. as per standard specifications
Cement Concrete 1:2:4 mix using 20mm gauge hard broken granite stone jelly for foundation including cost and conveyance of all materials to work site and all labour charges etc. as per standard specifications
Plastering with CM 1:4 20mm thickness including cost and conveyance and all labour charges etc.,
Construction of Inlet channel structure
Earthwork in all soils except hard rock requiring blasting and conveying with a lead of 0 to 100 M by deploying earth moving machineries and tippers for formation of bund in layers of suitable thickness, depending upon type of compaction equipment deploy
Cement Concrete 1:4:8 mix using 40mm metal including cost and conveyanceof all materials to work site and all labour charges etc.
Supplying and erecting centering shuttering with necessary supports including cost and conveyance and all labour charges etc.
Below Ground level
Above Ground level
Cement Concrete 1:3:6 mix using 40mm gauge hard broken granite stone jelly for foundation including cost and conveyance of all materials to work site and all labour charges etc. as per standard specifications
Cement Concrete 1:2:4 mix using 20mm gauge hard broken granite stone jelly for foundation including cost and conveyance of all materials to work site and all labour charges etc. as per standard specifications
Construction of Outlet channel structure
Earthwork in all soils except hard rock requiring blasting and conveying with a lead of 0 to 100 M by deploying earth moving machineries and tippers for formation of bund in layers of suitable thickness, depending upon type of compaction equipment deploy
Cement Concrete 1:4:8 mix using 40mm metal including cost and conveyanceof all materials to work site and all labour charges etc.
Supplying and erecting centering shuttering with necessary supports including cost and conveyance and all labour charges etc.
Below Ground level
Above Ground level
Cement Concrete 1:3:6 mix using 40mm gauge hard broken granite stone jelly for foundation including cost and conveyance of all materials to work site and all labour charges etc. as per standard specifications
Cement Concrete 1:2:4 mix using 20mm gauge hard broken granite stone jelly for foundation including cost and conveyance of all materials to work site and all labour charges etc. as per standard specifications
Construction of Revetment
Earthwork in all soils except hard rock requiring blasting and conveying with a lead of 0 to 100 M by deploying earth moving machineries and tippers for formation of bund in layers of suitable thickness, depending upon type of compaction equipment deploy
Cement Concrete 1:4:8 mix using 40mm metal including cost and conveyanceof all materials to work site and all labour charges etc.
Supplying and erecting centering shuttering with necessary supports including cost and conveyance and all labour charges etc.
Cement Concrete 1:3:6 mix using 40mm gauge hard broken granite stone jelly for foundation including cost and conveyance of all materials to work site and all labour charges etc. as per standard specifications
Providing gravel backing 15 cm thick for revetment including machin the same for premeasurement spreading and woaring with water to plastic waste complete as directed by the Engineer in charge of work
Rough Stone dry packing for revetment and apron using new stones obtained by approved sources including the cost of new wedges for filling the gaps etc., and complete on the work(using old stones)
Construction of Plantform
Cement Concrete 1:4:8 mix using 40mm metal including cost and conveyanceof all materials to work site and all labour charges etc.
Cement Concrete 1:3:6 mix using 40mm gauge hard broken granite stone jelly for foundation including cost and conveyance of all materials to work site and all labour charges etc. as per standard specifications
PART V : Rejuvenation of Vayalur kutrood kulam in Ravathanallur Panchayat Estimate Amount : Rs.13.05 Lakh
Clearing the Scrub jungle with uprooting and disposing of the same as directed by the Engineer in charge of the Works and as per technical specification
Earthwork excavation in all clauses of soil except hard rock which required blasting such as hard red earth, shalls, murrams including all cost and all labour charges etc., complete as per SS 20 B for foundation
Sectioning during forming bund when earth moving machineries, lorries and roller are used for consolidation
Construction of Retaining wall
Earthwork in all soils except hard rock requiring blasting and conveying with a lead of 0 to 100 M by deploying earth moving machineries and tippers for formation of bund in layers of suitable thickness, depending upon type of compaction equipment deploy
Cement Concrete 1:4:8 mix using 40mm metal including cost and conveyanceof all materials to work site and all labour charges etc.
Supplying and erecting centering shuttering with necessary supports including cost and conveyance and all labour charges etc.
Cement Concrete 1:3:6 mix using 40mm gauge hard broken granite stone jelly for foundation including cost and conveyance of all materials to work site and all labour charges etc. as per standard specifications
Plastering with CM 1:4 20mm thickness including cost and conveyance and all labour charges etc.,
Construction of Bathing Ghat, Steps, Outer platform
Earthwork in all soils except hard rock requiring blasting and conveying with a lead of 0 to 100 M by deploying earth moving machineries and tippers for formation of bund in layers of suitable thickness, depending upon type of compaction equipment deploy
Cement Concrete 1:4:8 mix using 40mm metal including cost and conveyanceof all materials to work site and all labour charges etc.
Supplying and erecting centering shuttering with necessary supports including cost and conveyance and all labour charges etc.
Cement Concrete 1:3:6 mix using 40mm gauge hard broken granite stone jelly for foundation including cost and conveyance of all materials to work site and all labour charges etc. as per standard specifications
Cement Concrete 1:3:6 mix using 20mm gauge hard broken granite stone jelly for foundation including cost and conveyance of all materials to work site and all labour charges etc. as per standard specifications
Cement Concrete 1:2:4 mix using 20mm gauge hard broken granite stone jelly for foundation including cost and conveyance of all materials to work site and all labour charges etc. as per standard specifications
Plastering with CM 1:4 20mm thickness including cost and conveyance and all labour charges etc.,
Construction of steps over bund
Earthwork in all soils except hard rock requiring blasting and conveying with a lead of 0 to 100 M by deploying earth moving machineries and tippers for formation of bund in layers of suitable thickness, depending upon type of compaction equipment deploy
Cement Concrete 1:4:8 mix using 40mm metal including cost and conveyanceof all materials to work site and all labour charges etc.
Supplying and erecting centering shuttering with necessary supports including cost and conveyance and all labour charges etc.
Cement Concrete 1:3:6 mix using 40mm gauge hard broken granite stone jelly for foundation including cost and conveyance of all materials to work site and all labour charges etc. as per standard specifications
Cement Concrete 1:2:4 mix using 20mm gauge hard broken granite stone jelly for foundation including cost and conveyance of all materials to work site and all labour charges etc. as per standard specifications
Plastering with CM 1:4 20mm thickness including cost and conveyance and all labour charges etc.,
Construction of Revetment
Earthwork in all soils except hard rock requiring blasting and conveying with a lead of 0 to 100 M by deploying earth moving machineries and tippers for formation of bund in layers of suitable thickness, depending upon type of compaction equipment deploy
Cement Concrete 1:4:8 mix using 40mm metal including cost and conveyanceof all materials to work site and all labour charges etc.
Supplying and erecting centering shuttering with necessary supports including cost and conveyance and all labour charges etc.
Cement Concrete 1:3:6 mix using 40mm gauge hard broken granite stone jelly for foundation including cost and conveyance of all materials to work site and all labour charges etc. as per standard specifications
Providing gravel backing 15 cm thick for revetment including machin the same for premeasurement spreading and woaring with water to plastic waste complete as directed by the Engineer in charge of work
Rough Stone dry packing for revetment and apron using new stones obtained by approved sources including the cost of new wedges for filling the gaps etc., and complete on the work(using old stones)
PART VI: Rejuvenation of Vannan kulam in kaliyampoondi Panchayat Estimate Amount : Rs.14.27 Lakh
Clearing the Scrub jungle with uprooting and disposing of the same as directed by the Engineer in charge of the Works and as per technical specification
Earthwork excavation in all clauses of soil except hard rock which required blasting such as hard red earth, shalls, murrams including all cost and all labour charges etc., complete as per SS 20 B for foundation
Sectioning during forming bund when earth moving machineries, lorries and roller are used for consolidation
Construction of Retaining wall
Earthwork in all soils except hard rock requiring blasting and conveying with a lead of 0 to 100 M by deploying earth moving machineries and tippers for formation of bund in layers of suitable thickness, depending upon type of compaction equipment deploy
Cement Concrete 1:4:8 mix using 40mm metal including cost and conveyanceof all materials to work site and all labour charges etc.
Supplying and erecting centering shuttering with necessary supports including cost and conveyance and all labour charges etc.
Cement Concrete 1:3:6 mix using 40mm gauge hard broken granite stone jelly for foundation including cost and conveyance of all materials to work site and all labour charges etc. as per standard specifications
Plastering with CM 1:4 20mm thickness including cost and conveyance and all labour charges etc.,
Construction of Bathing Ghat, Steps, Outer platform
Earthwork in all soils except hard rock requiring blasting and conveying with a lead of 0 to 100 M by deploying earth moving machineries and tippers for formation of bund in layers of suitable thickness, depending upon type of compaction equipment deploy
Cement Concrete 1:4:8 mix using 40mm metal including cost and conveyanceof all materials to work site and all labour charges etc.
Supplying and erecting centering shuttering with necessary supports including cost and conveyance and all labour charges etc.
Cement Concrete 1:3:6 mix using 40mm gauge hard broken granite stone jelly for foundation including cost and conveyance of all materials to work site and all labour charges etc. as per standard specifications
Cement Concrete 1:3:6 mix using 20mm gauge hard broken granite stone jelly for foundation including cost and conveyance of all materials to work site and all labour charges etc. as per standard specifications
Cement Concrete 1:2:4 mix using 20mm gauge hard broken granite stone jelly for foundation including cost and conveyance of all materials to work site and all labour charges etc. as per standard specifications
Plastering with CM 1:4 20mm thickness including cost and conveyance and all labour charges etc.,
Construction of steps over bund
Earthwork in all soils except hard rock requiring blasting and conveying with a lead of 0 to 100 M by deploying earth moving machineries and tippers for formation of bund in layers of suitable thickness, depending upon type of compaction equipment deploy
Cement Concrete 1:4:8 mix using 40mm metal including cost and conveyanceof all materials to work site and all labour charges etc.
Supplying and erecting centering shuttering with necessary supports including cost and conveyance and all labour charges etc.
Cement Concrete 1:3:6 mix using 40mm gauge hard broken granite stone jelly for foundation including cost and conveyance of all materials to work site and all labour charges etc. as per standard specifications
Cement Concrete 1:2:4 mix using 20mm gauge hard broken granite stone jelly for foundation including cost and conveyance of all materials to work site and all labour charges etc. as per standard specifications
Plastering with CM 1:4 20mm thickness including cost and conveyance and all labour charges etc.,
Construction of Revetment
Earthwork in all soils except hard rock requiring blasting and conveying with a lead of 0 to 100 M by deploying earth moving machineries and tippers for formation of bund in layers of suitable thickness, depending upon type of compaction equipment deploy
Cement Concrete 1:4:8 mix using 40mm metal including cost and conveyanceof all materials to work site and all labour charges etc.
Supplying and erecting centering shuttering with necessary supports including cost and conveyance and all labour charges etc.
Cement Concrete 1:3:6 mix using 40mm gauge hard broken granite stone jelly for foundation including cost and conveyance of all materials to work site and all labour charges etc. as per standard specifications
Providing gravel backing 15 cm thick for revetment including machin the same for premeasurement spreading and woaring with water to plastic waste complete as directed by the Engineer in charge of work
Rough Stone dry packing for revetment and apron using new stones obtained by approved sources including the cost of new wedges for filling the gaps etc., and complete on the work(using old stones)
PART VII: Rejuvenation of Sithalapakkam Vannan kulam in Sirumailur Panchayat Estimate Amount : Rs.15.05 Lakh
Clearing the Scrub jungle with uprooting and disposing of the same as directed by the Engineer in charge of the Works and as per technical specification
Earthwork excavation in all clauses of soil except hard rock which required blasting such as hard red earth, shalls, murrams including all cost and all labour charges etc., complete as per SS 20 B for foundation
Sectioning during forming bund when earth moving machineries, lorries and roller are used for consolidation
Construction of Retaining wall
Earthwork in all soils except hard rock requiring blasting and conveying with a lead of 0 to 100 M by deploying earth moving machineries and tippers for formation of bund in layers of suitable thickness, depending upon type of compaction equipment deploy
Cement Concrete 1:4:8 mix using 40mm metal including cost and conveyanceof all materials to work site and all labour charges etc.
Supplying and erecting centering shuttering with necessary supports including cost and conveyance and all labour charges etc.
Cement Concrete 1:3:6 mix using 40mm gauge hard broken granite stone jelly for foundation including cost and conveyance of all materials to work site and all labour charges etc. as per standard specifications
Plastering with CM 1:4 20mm thickness including cost and conveyance and all labour charges etc.,
Construction of Bathing Ghat, Steps, Outer platform
Earthwork in all soils except hard rock requiring blasting and conveying with a lead of 0 to 100 M by deploying earth moving machineries and tippers for formation of bund in layers of suitable thickness, depending upon type of compaction equipment deploy
Cement Concrete 1:4:8 mix using 40mm metal including cost and conveyanceof all materials to work site and all labour charges etc.
Supplying and erecting centering shuttering with necessary supports including cost and conveyance and all labour charges etc.
Cement Concrete 1:3:6 mix using 40mm gauge hard broken granite stone jelly for foundation including cost and conveyance of all materials to work site and all labour charges etc. as per standard specifications
Cement Concrete 1:3:6 mix using 20mm gauge hard broken granite stone jelly for foundation including cost and conveyance of all materials to work site and all labour charges etc. as per standard specifications
Cement Concrete 1:2:4 mix using 20mm gauge hard broken granite stone jelly for foundation including cost and conveyance of all materials to work site and all labour charges etc. as per standard specifications
Plastering with CM 1:4 20mm thickness including cost and conveyance and all labour charges etc.,
Construction of steps over bund
Earthwork in all soils except hard rock requiring blasting and conveying with a lead of 0 to 100 M by deploying earth moving machineries and tippers for formation of bund in layers of suitable thickness, depending upon type of compaction equipment deploy
Cement Concrete 1:4:8 mix using 40mm metal including cost and conveyanceof all materials to work site and all labour charges etc.
Supplying and erecting centering shuttering with necessary supports including cost and conveyance and all labour charges etc.
Cement Concrete 1:3:6 mix using 40mm gauge hard broken granite stone jelly for foundation including cost and conveyance of all materials to work site and all labour charges etc. as per standard specifications
Cement Concrete 1:2:4 mix using 20mm gauge hard broken granite stone jelly for foundation including cost and conveyance of all materials to work site and all labour charges etc. as per standard specifications
Plastering with CM 1:4 20mm thickness including cost and conveyance and all labour charges etc.,
Construction of Inlet channel structure
Earthwork in all soils except hard rock requiring blasting and conveying with a lead of 0 to 100 M by deploying earth moving machineries and tippers for formation of bund in layers of suitable thickness, depending upon type of compaction equipment deploy
Cement Concrete 1:4:8 mix using 40mm metal including cost and conveyanceof all materials to work site and all labour charges etc.
Supplying and erecting centering shuttering with necessary supports including cost and conveyance and all labour charges etc.
Below Ground level
Above Ground level
Cement Concrete 1:3:6 mix using 40mm gauge hard broken granite stone jelly for foundation including cost and conveyance of all materials to work site and all labour charges etc. as per standard specifications
Cement Concrete 1:2:4 mix using 20mm gauge hard broken granite stone jelly for foundation including cost and conveyance of all materials to work site and all labour charges etc. as per standard specifications
Construction of Revetment
Earthwork in all soils except hard rock requiring blasting and conveying with a lead of 0 to 100 M by deploying earth moving machineries and tippers for formation of bund in layers of suitable thickness, depending upon type of compaction equipment deploy
Cement Concrete 1:4:8 mix using 40mm metal including cost and conveyanceof all materials to work site and all labour charges etc.
Supplying and erecting centering shuttering with necessary supports including cost and conveyance and all labour charges etc.
Cement Concrete 1:3:6 mix using 40mm gauge hard broken granite stone jelly for foundation including cost and conveyance of all materials to work site and all labour charges etc. as per standard specifications
Providing gravel backing 15 cm thick for revetment including machin the same for premeasurement spreading and woaring with water to plastic waste complete as directed by the Engineer in charge of work
Rough Stone dry packing for revetment and apron using new stones obtained by approved sources including the cost of new wedges for filling the gaps etc., and complete on the work(using old stones)
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 0.12 MB
BOQ_188510.xls
BOQ • 0.40 MB
Price.pdf
Additional Documents • 0.14 MB
Technical_.pdf
Tender Documents • 0.54 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .