Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.3 LAccepted-AOC F 8 7 SECTOR 5 CBD BELAPUR NAVI MUMBAI | L1 | Accepted-AOC Being L1 | |
| 2 | L2₹3.6 L+₹35,400 (10.8%)Rejected-Finance | L2 | Rejected-Finance Being L2 |
Tender Value
₹3.8 L
EMD Value
₹9,042
Closing Date
26 Mar 2025, 3:00 pmClosed
Superintending Engineer
Civil Engineering Division,BARC, Trombay, Mumbai
Cleaning terraces, roofs, chajjas, storm water drains, water tables etc., for Seaside buildings, North Site, BARC, Trombay, Mumbai Year 2025.
2025_BARC_851898_1
BARC/CED/ET/63/2024-2025 Dated 27/02/2025
Open Tender
Civil Works
Item Rate
305 days
BARC, Trombay, Mumbai
Please refer Tender Document
8 documents required · 8 mandatory
₹0
₹9,042
14 Jul 2025
5 Mar 2025
1 Apr 2025
5 Mar 2025
26 Mar 2025
11 Mar 2025
5 Mar 2025 - 10 Mar 2025
Amount
Removing of silt, dry leaves, murrum, small Boulders etc. completely from the bed of open nallah, drains, open rubble pitched drains, canals and disposing the removed earth within a lead of 50 mtr during monsoon period. The rates are including removing of green wild creepers etc. silt thickness upto 100 mm thick and upto 3.00 M depth.
230 to 749 mm wide at bottom
Removing silt upto 100 mm thick dry leaves, grass etc. completely from the Shahabad pavement/ road / Terrace during the entire monsoon period and transporting the removed earth, leaves and debris to dumping ground upto 3 Kms lead by mechanical transport as directed by Project Engineer.
Cleaning of existing storm water chamber of varying depth at various locations by removing the silt, leaves, small storms earth etc., within a lead of 50 mtr during monsoon period including labour required for removing and replacing C.I. Covers at storm water chamber. (Maximum plan area of upto 1 Sq.M)
Supplying man power alongwith necessary pans, spades, shovels, pickaxe, punjas, ropes, small specials spade, rain coats, safety shoes etc., minimum two number of labour per day upto maximum any number of labour as and when decided by Project Engineer to work for eight hours per day or monsoon peiod to carry out the cleaning of chocked drain gratings grills / hume pipes/ footpath by removing the dry leaves silt etc., and also carry out seasonable departmental work allotted by Project Engineer from time to time.
Lead charges for removal of soil deposited from stalling ponds, drains, and other areas of BARC by mechanical trasport for lead or mentioned below including, unloading, stacking, levelling, etc.
Lead exceeding 1 km but not exceeding 2 kms
Lead exceeding 2 km but not exceeding 3 kms Note : The rate for Item Nos. 5.01 and 5.02 is applicable for the net quantity arrived at after making deductions for voids @ 20% in respect of Soil from the truck measurement for payment.
noor construction (BID ID -3193567)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .