Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.5 LAccepted-AOC AT MAIN ROAD KATHARA PO KATHARA BOKARO JHARKHAND 829116 | BOKARO | BOKARO | JHARKHAND | 829116 | L1 | Accepted-AOC AOC | |
| 2 | Rejected-Technical MAIN ROAD RAMGARH CANTT 829122 | RAMGARH | RAMGARH | JHARKHAND | 829122 | - | Rejected-Technical Rejected as not L1 | |
| 3 | Rejected-Technical BHANDANI NAGAR BHURKUNDA RAMGARH JHARKHAND 829105 | BHURKUNDA | RAMGARH | JHARKHAND | 829105 | - | Rejected-Technical rejected as not L1 |
| Sl No | Description | Qty | Unit | M/S. PAWAN KUMAR L1 | M.k. Traders L2 | RAHIM CONTRACTOR L3 |
|---|---|---|---|---|---|---|
| 1.01 | Shunt trip coil 110 Volt | 1 | Nos | 4,500 ₹4,500 Lowest | 5,000 ₹5,000 | 6,000 ₹6,000 |
| 1.02 | Rectifier capacitor unit I Ph 16 Amp 110V AC/DC | 1 | Nos | 7,500 ₹7,500 Lowest | 8,000 ₹8,000 | 9,000 ₹9,000 |
| 1.03 | PT Fuse 3.3 KV Grade, 3 Amp | 1 | Nos | 3,196 ₹3,196 Lowest | 3,500 ₹3,500 | 4,000 ₹4,000 |
| 1.04 | Copper flate (2'' x 6mm) | 15 | Kgs | 1,050 ₹15,750 Lowest | 1,100 ₹16,500 | 1,200 ₹18,000 |
| 1.05 | Cost of bus-bar incoming/outgoing support insulator | 6 | Nos | 12,500 ₹75,000 Lowest | 15,000 ₹90,000 | 16,500 ₹99,000 |
| 1.06 | Wiring with ferrul & lugs as | 1 | Sets | 4,500 ₹4,500 Lowest | 5,000 ₹5,000 | 5,500 ₹5,500 |
| 1.07 | Nuts Bolts washer as required | 1 | Sets | 2,550 ₹2,550 Lowest | 3,000 ₹3,000 | 3,500 ₹3,500 |
| 1.08 | Labour cost | 1 | LS | 14,638 ₹14,638 Lowest | 17,500 ₹17,500 | 19,500 ₹19,500 |
| 2.00 | Total impact of GST for the purpose of CTC | 1 | Nos | 22,974.12 ₹22,974.12 Lowest | 26,730 ₹26,730 | 29,610 ₹29,610 |
Tender Value
Refer Docs
EMD Value
₹1,900
Closing Date
13 Mar 2024, 4:00 pmClosed
Project Engineer (EnM), Kathara Colliery
Project Engineer (EnM), Office of the PO, Kathara Colliery
Repairing and reconditioning of 400 Amp 3.3KV OCB for primary control of 630 KVA Transformer at 4 No. Colony of Kathara Colliery.
2024_CCL_303589_1
KTC/PE(EnM)/E-Tender/23-24/318
Open Tender
Electrical and Maintenance Works
Item Rate
7 days
Office of the Project Officer, PE (EnM), Kathara C
As per NIT
5 documents required · 5 mandatory
₹1,900
11 Aug 2025
4 Mar 2024
14 Mar 2024
5 Mar 2024
13 Mar 2024
5 Mar 2024
5 Mar 2024 - 11 Mar 2024
Amount
Shunt trip coil 110 Volt
Rectifier capacitor unit I Ph 16 Amp 110V AC/DC
PT Fuse 3.3 KV Grade, 3 Amp
Copper flate (2'' x 6mm)
Cost of bus-bar incoming/outgoing support insulator
Wiring with ferrul & lugs as
Nuts Bolts washer as required
Labour cost
Total impact of GST for the purpose of CTC
M.k. Traders
RAHIM CONTRACTOR
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .