| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹2.4 LAccepted-Finance | L-1 | Accepted-Finance stand as L1 bidder | |
| 2 | L-2₹2.5 L+₹5,985 (2.47%)Rejected-Finance | L-2 | Rejected-Finance does not stand as L1 bidder | |
| 3 | L-3₹2.5 L+₹7,745 (3.20%)Rejected-Finance | L-3 | Rejected-Finance does not stand as L1 bidder |
Tender Value
Refer Docs
EMD Value
₹4,700
Closing Date
5 Jan 2021, 6:00 pmClosed
Superintending Engineer-IV, BTPS, OBRA
Office of Superintending Engineer-IV, BTPS, OBRA
Works of Annual Running, Preventive and Breakdown Maintenance and new erection work of Instrumentation system of WTP, CW pump house, AC plant of 5X200 MW, CLCT System, CT fan and New Erection Modification work of instrumentation system
2020_RVUNL_535238_1
T-08/SE-IV/CIMD-I/BTPS/20-21
Open Tender
Electrical Works
Fixed-rate
365 days
CIMD-I, BTPS, Obra
As per tender specification
3 documents required · 3 mandatory
₹590
UPRVUNL P andAD, BTPS, Obra
₹4,700
21 Jan 2021
5 Dec 2020
7 Jan 2021
5 Dec 2020
5 Jan 2021
5 Dec 2020
5 Dec 2020 - 5 Jan 2021
Replacement/New Erection of impulse line.
Replacement/New Erection of instrument fitting, adopter, nut & tails, Elbow connector etc.
Overhauling and servicing of B-501/B-601/ SS/ cock valve.
Overhauling/Repairing of Junction Boxes.
Overhauling/Servicing & recalibration/ New Erection of Fuzi/Yokogava/ Rosemount/other make Transmitters.
Complete overhauling and Recalibration /New erection of digital Indicators.
Overhauling and Recalibration/ New Erection of Flow meter/ conductivity meter.
Complete overhauling/New Erection of level switches.
Replacement of Pressure switch/Gauge/ Vibration switch after dismantling from site, its testing, checking and calibration with termination of cable after proper dressing and clamping etc /New Erection of pressure switches/Gauge/vibration switch.
Removal of temp gauges/switches & thermocouple from site, its Erection and commissioning after their testing, calibration with termination of cable after proper dressing and clamping etc/Replacement//New Erection of temp. gauges/switches & thermocouple.
Replacement/new erection/overhauling &cleaning of union & isolating valve/forged body valve.
Cleaning/blowing of tapping points of different pressure transmitters/Switches after opening it associated pipe line.
Fabrication/ Repairing of Instruments plateform at Boiler 0 to 52 M of size 3.5ft X 4.5 ft /highersize.
Laying/ Petrolling of instrumentation cable of size 2C to 20 C X 0.5mm2 to 1.5 mm2 .
M/s. R.K. Electrical Works
INSTRUMENT ERECTORS
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .