| 1 | L1₹5.7 CrAccepted-AOC 230 NIZAMUDDINPURA MAUNATH BHANJAN MAU MAU UTTAR PRADESH MAU UTTAR PRADESH 275101 | MAU | UTTAR PRADESH | 275101 | ₹5.7 Cr | L1 | Accepted-AOC Aoc |
| 2 | L2₹5.8 Cr+₹13.2 L (2.33%)Rejected-Finance | ₹5.8 Cr+₹13.2 L (2.33%) | L2 | Rejected-Finance NOT ADMITTED |
| 3 | L3₹7.0 Cr+₹1.4 Cr (24.6%)Rejected-Finance | ₹7.0 Cr+₹1.4 Cr (24.6%) | L3 | Rejected-Finance NOT ADMITTED |
| 4 | L4₹6.2 Cr+₹59.4 L (10.5%)Rejected-Finance | ₹6.2 Cr+₹59.4 L (10.5%) | L4 | Rejected-Finance NOT ADMITTED |
| 5 | L5₹7.8 Cr+₹2.2 Cr (38.5%)Rejected-Finance | ₹7.8 Cr+₹2.2 Cr (38.5%) | L5 | Rejected-Finance NOT ADMITTED |
| Sl No | Description | Qty | Unit | M/s. PRAKASH CONSTRUCTION L1 | ganga sagar singh L4 | ANUKTA CONSTRUCTION L2 | M K CONSTRUCTION AND SUPPLIERS L3 | M/S RAJ COMPANY AND SUPPLIERS L5 |
|---|---|---|---|---|---|---|---|---|
| 1.00 | Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m (Including Cost of All Matarial T&P, Taxes, Labour Cess etc but Excluding GST ) | 2,520 | Cum | 50 ₹1,26,000 | 50 ₹1,26,000 | 15 ₹37,800 Lowest | 46.34 ₹1,16,766.72 | 59 ₹1,48,680 |
| 2.00 | Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of table 300-2. (Including Cost of All Matarial T&P, Royalty, Taxes, Labour Cess etc but Excluding GST ) | 2,520 | Cum | 60 ₹1,51,200 | 50 ₹1,26,000 | 15 ₹37,800 Lowest | 52.73 ₹1,32,872.04 | 66.5 ₹1,67,580 |
| 3.00 | Construction of embankment with approved material obtained from ROW with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2. without lead. (Including Cost of All Matarial T&P, Royalty, Taxes, Labour Cess etc but Excluding GST ) | 34,400 | Cum | 110 ₹37,84,000 | 120 ₹41,28,000 | 50 ₹17,20,000 Lowest | 100.26 ₹34,49,012.8 | 126 ₹43,34,400 |
| 4.00 | Construction of granular sub-base by providing close graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401. (Including Cost of All Matarial T&P, Royalty, Taxes, Labour Cess etc but excluding GST ) as per direction of engineer-in-charge | 600 | Cum | 2,800 ₹16,80,000 | 2,500 ₹15,00,000 | 3,030 ₹18,18,000 | 2,397.5 ₹14,38,499.4 Lowest | 3,011 ₹18,06,600 |
| 5.00 | Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. (WMM) (Including Cost of All Matarial T&P, Royalty, Taxes, Labour Cess etc but Excluding GST ) as per direction of engineer-in-charge | 91 | Cum | 1,000 ₹91,000 Lowest | 2,700 ₹2,45,700 | 3,030 ₹2,75,730 | 2,572.46 ₹2,34,093.68 | 3,221 ₹2,93,111 |
| 6.00 | Stablized Sub-base (FDR Technology)- Providing, laying, spreading and compacting of existing granular material adding cement using truck mounted / self propelled cement spreader shall have variable working width with microproces, controlled spray rate through augers and cellular wheels. The aggregate shall be in situ pulverized/stabilize using four wheeled drive recycler having working depth up to 50 cm with variable depth control system. Compacting with vibratory roller Pneumatic roller and vibratory pad Foot pad roller (20 tonne) to achieve design uncofined compresive Stgrength. (Including Cost of All Matarial T&P, Royalty, Taxes, Labour Cess etc but excluding GST ) as per direction of engineer-in-charge. | 7,150 | Cum | 1,250 ₹89,37,500 Lowest | 2,800 ₹2,00,20,000 | 1,400 ₹1,00,10,000 | 1,486.75 ₹1,06,30,283.95 | 1,866 ₹1,33,41,900 |
| 7.00 | Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with 1% OPC cement ^ 3.5% emulsion in uniform layer with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. (ETA) (Including Cost of All Matarial T&P, Royalty, Taxes, Labour Cess etc but Excluding GST ) as per direction of engineer-in-charge | 3,575 | Cum | 6,000 ₹2,14,50,000 | 5,000 ₹1,78,75,000 Lowest | 6,000 ₹2,14,50,000 | 5,919.05 ₹2,11,60,603.75 | 7,409 ₹2,64,87,175 |
| 8.00 | Providing and laying tack coat with bitumen VG-10 using emulsion distributer at the rate of 0.20 Kg / Sqm. on the prepared granular surface treated with primer and cleaned with hydraulic broom as per technical specification clause no. 503 (I) (Including Cost of All Matarial T&P, Royalty, Taxes, Labour Cess etc but excluding GST ) | 35,750 | sqm | 10 ₹3,57,500 | 10 ₹3,57,500 | 6 ₹2,14,500 Lowest | 9.27 ₹3,31,295.25 | 11.6 ₹4,14,700 |
| 9.00 | Providing and laying bituminous concrete with 100-120 TPH batch type hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 509 complete in all respects (Including Cost of All Matarial T&P, Royalty, Taxes, Labour Cess etc but excluding GST ) | 1,430 | Cum | 11,000 ₹1,57,30,000 | 9,500 ₹1,35,85,000 | 10,005 ₹1,43,07,150 | 9,417.43 ₹1,34,66,929.19 Lowest | 11,788 ₹1,68,56,840 |
| 10.00 | Construction of un-reinforced, dowel jointed, plain cement concrete pavement (M-35) over a prepared sub base with approve grade cement @ 400 kg per cum, coarse and fine aggregate conforming to IS 383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a batching and mixing plant as per approved mix design, transported to site, laid with a fixed form or slip form paver, spread, compacted and finished in a continuous operation including provision of contraction, expansion, construction and longitudinal joints, joint filler, separation membrane, sealant primer, joint sealant, debonding strip, dowel bar, tie rod, admixtures as approved, curing compound, finishing to lines and grades as per drawing (Including Cost of All Matarial T&P, Taxes, Labour Cess etc but Excluding GST ) | 245 | Cum | 5,500 ₹13,47,500 Lowest | 6,500 ₹15,92,500 | 6,800 ₹16,66,000 | 7,262 ₹17,79,190.25 | 9,097 ₹22,28,765 |
Tender Value
₹8.1 Cr
EMD Value
₹16.1 L
Closing Date
29 Mar 2025, 12:00 pmClosed
SE JAUNPUR GHAZIPUR CIRCLE, PWD, JAUNPUR
SE JAUNPUR GHAZIPUR CIRCLE, PWD, JAUNPUR
Widening Strengthening of Bihariganj Maudha Marg (ODR) (5year Maintenance Work)
2024_CEUVZ_975355_2
79/Camp/SE Tender/jnp-gzp circle/24 date 14-10-2024
Open Tender
Civil Works
Percentage
365 days
Jaunpur
Please refer Tender documents.
2 documents required · 2 mandatory
₹5,590
₹16.1 L
Yes
SE, JAUNPUR GHAZIPUR CIRCLE, PWD, JAUNPUR
18 Sept 2025
28 Nov 2024
29 Mar 2025
28 Nov 2024
29 Mar 2025
28 Nov 2024
28 Nov 2024
Amount
Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m (Including Cost of All Matarial T&P, Taxes, Labour Cess etc but Excluding GST )
Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of table 300-2. (Including Cost of All Matarial T&P, Royalty, Taxes, Labour Cess etc but Excluding GST )
Construction of embankment with approved material obtained from ROW with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2. without lead. (Including Cost of All Matarial T&P, Royalty, Taxes, Labour Cess etc but Excluding GST )
Construction of granular sub-base by providing close graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401. (Including Cost of All Matarial T&P, Royalty, Taxes, Labour Cess etc but excluding GST ) as per direction of engineer-in-charge
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. (WMM) (Including Cost of All Matarial T&P, Royalty, Taxes, Labour Cess etc but Excluding GST ) as per direction of engineer-in-charge
Stablized Sub-base (FDR Technology)- Providing, laying, spreading and compacting of existing granular material adding cement using truck mounted / self propelled cement spreader shall have variable working width with microproces, controlled spray rate through augers and cellular wheels. The aggregate shall be in situ pulverized/stabilize using four wheeled drive recycler having working depth up to 50 cm with variable depth control system. Compacting with vibratory roller Pneumatic roller and vibratory pad Foot pad roller (20 tonne) to achieve design uncofined compresive Stgrength. (Including Cost of All Matarial T&P, Royalty, Taxes, Labour Cess etc but excluding GST ) as per direction of engineer-in-charge.
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with 1% OPC cement ^ 3.5% emulsion in uniform layer with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. (ETA) (Including Cost of All Matarial T&P, Royalty, Taxes, Labour Cess etc but Excluding GST ) as per direction of engineer-in-charge
Providing and laying tack coat with bitumen VG-10 using emulsion distributer at the rate of 0.20 Kg / Sqm. on the prepared granular surface treated with primer and cleaned with hydraulic broom as per technical specification clause no. 503 (I) (Including Cost of All Matarial T&P, Royalty, Taxes, Labour Cess etc but excluding GST )
Providing and laying bituminous concrete with 100-120 TPH batch type hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 509 complete in all respects (Including Cost of All Matarial T&P, Royalty, Taxes, Labour Cess etc but excluding GST )
Construction of un-reinforced, dowel jointed, plain cement concrete pavement (M-35) over a prepared sub base with approve grade cement @ 400 kg per cum, coarse and fine aggregate conforming to IS 383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a batching and mixing plant as per approved mix design, transported to site, laid with a fixed form or slip form paver, spread, compacted and finished in a continuous operation including provision of contraction, expansion, construction and longitudinal joints, joint filler, separation membrane, sealant primer, joint sealant, debonding strip, dowel bar, tie rod, admixtures as approved, curing compound, finishing to lines and grades as per drawing (Including Cost of All Matarial T&P, Taxes, Labour Cess etc but Excluding GST )
Providing and Laying of Rubber moulded (Red Colour) Interlocking Concrete Block Pavements having thickness 80 mm including leveling and dressing of surface to required level and slope, spreading and moisting 30m thick local sand on bend, filling joints with local sand on bend, filling joints with local sand etc. for proper completion of the work as per drawings and Technical Specification Clause 1504. Rate As per SOR (Including Cost of All Matarial T&P, Taxes, Labour Cess etc but Excluding GST )
Construction of subgrade and earthen shoulders with approved material obtained from R.O.W. with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 as per Technical Specification Clause 303.1.
Dismantling brick work or stone work in lime or cement mortar and including stacking of materials as directed by Engineer-in-charge within a distance of 60 meter (200 feet). As per SOR SI No.692 (Including Cost of All Matarial T&P, Taxes, Labour Cess etc but Excluding GST )
Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with Approved Material. Specification N. 304 (S.N. 12.01i) (Ordinary Soil) (Including Cost of All Matarial T&P, Taxes, Labour Cess etc but Excluding GST )
Plain cement concrete 1:3:6 (M-10) nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days. (Including Cost of All Matarial T&P, Taxes, Labour Cess etc but Excluding GST )
Reinforced Cement Concrete (M-30) in Open Foundation complete as per Drawing and Technical Specifications. (Including Cost of All Matarial T&P, Taxes, Labour Cess etc but Excluding GST )
Supplying, fitting, and placing MS bar reinforcement in superstructure complete as per drawing and technical specifications Clauses 1002, 1010 and 1202, for Bars below 36 mm dia including over laps and wastage, where they are not welded. (Including Cost of All Matarial T&P, Taxes, Labour Cess etc but Excluding GST )
Providing weep holes in Brick masonry/Plain/ Reinforced concrete abutment, wing wall/ return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical specification. SI. No. 13.08 (Including Cost of All Matarial T&P, Taxes, Labour Cess etc but Excluding GST )
Providing and laying Cement concrete wearing coat M-35 grade including reinforecement complete as per drawing and Technical Specifications SI. No-14.4 (Including Cost of All Matarial T&P, Taxes, Labour Cess etc but Excluding GST )
M-150 brick in 1:3 cement and coarse sand mortar in foundation and plinth including supply of all materials, labour and tools & plants, etc required for proper completion of the work. as per MORTH Specification. (Including Cost of All Matarial T&P, Taxes, Labour Cess etc but Excluding GST )
Providing and laying 600 mm dia NP-3 H.P. jointing with coller in proper position including cost of cemment, jute etc required for proper completion of work. But excluding cost of coller. (Including Cost of All Matarial T&P, Taxes, Labour Cess etc but Excluding GST )
Providing and laying 900 mm dia NP-3 H.P. jointing with coller in proper position including cost of cemment, jute etc required for proper completion of work. But excluding cost of coller.(Including Cost of All Matarial T&P, Taxes, Labour Cess etc but Excluding GST )
Struck pointing with cement mortar consisting of 1 part cement and 2 parts of fine sand of 1.25 fineness modulous including supply of all materials, labour and T&P etc. required for proper completion of the work as per direction of Engineer-in-Charge. SI (Including Cost of All Matarial T&P, Taxes, Labour Cess etc but Excluding GST )
PART B Maintainance cost :- Maintainance cost will be paid year wise as per Government order No. 17/2024/SA.-113/23-1-2024-23-1099/113/2023 Date 16.01.2024 and HQ UPPWD,Lucknow order No. 3689COPRMC/Mul-23-24 Date 17.02.2024 . Maintainance cost will adjusted as per final cost of construction and will be paid accordingly.
1st year- maintainance cost 0% on Bituminous & drain Work (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
2nd year- maintainance cost 0.25% on Bituminous & drain Work (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
3rd year- maintainance cost 0.50 % on Bituminous & drain Work (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
4th year- maintainance cost 0.75% on Bituminous &drain Work (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
5th year- maintainance cost 1.00 % on Bituminous & drain Work (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
ANUKTA CONSTRUCTION (BID ID -4941451)
M K CONSTRUCTION AND SUPPLIERS (BID ID -4758941)
ganga sagar singh (BID ID -4959697)
M/S RAJ COMPANY AND SUPPLIERS (BID ID -4761046)
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .