| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹35.9 LAccepted-Finance HOUSE NO 59 SECOND FLOOR MUNIRKA VILLAGE NEW DELHI 67 | NEW DELHI | DELHI | 110067 | ₹35.9 L | L1 | Accepted-Finance OK |
| 2 | L2₹36.0 LAccepted-Finance | ₹36.0 L | L2 | Accepted-Finance OK |
| 3 | L3₹36.3 LAccepted-Finance 78 NEAR CHOPAL VILLAGE NIZAMPUR DISTT PANIPAT | PANIPAT | HARYANA | ₹36.3 L | L3 | Accepted-Finance OK |
| 4 | L4₹43.5 LAccepted-Finance | ₹43.5 L | L4 | Accepted-Finance OK |
| 5 | L5₹47.8 LAccepted-Finance | ₹47.8 L | L5 | Accepted-Finance OK |
Tender Value
₹71.3 L
EMD Value
₹1.4 L
Closing Date
29 Jan 2026, 3:00 pmClosed
EXECUTIVE ENGINEER
DIVN. SOUTH EAST ROAD-2, PWD, SUKHDEV VIHAR, NEW DELHI
A/R and M/O to various roads under PWD Sub Division SER-2/22 New Delhi. (SH Repairing of Drain by Re-casting at damaged portion of drain slab and wall and CC on berm area at Madanpur Khadar Road under jurisdiction of SER-22)
2026_PWD_285438_1
73/EE/SER-2/PWD/2025-26
Open Tender
Civil Works - Roads
90 days
NEW DELHI
Please refer Tender documents.
10 documents required · 10 mandatory
₹0
₹1.4 L
30 Jan 2026
22 Jan 2026
29 Jan 2026
22 Jan 2026
29 Jan 2026
22 Jan 2026
Concrete of M10 grade with minimum cement content of 220 kg /cum
Concrete of M25 grade with minimum cement content of 300 kg /cum
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Thermo-Mechanically Treated bars
Providing and laying in position ready mixed or site batched design mix cement concrete for reinforced cement concrete work; using coarse aggregate and fine aggregate derived from natural sources, Portland Pozzolana / Ordinary Portland /Portland Slag cement, admixtures in recommended proportions as per IS: 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the engineer-in-charge; for the following grades of concrete. Note: Extra cement up to 10% of the minimum specified cement content in design mix shall be payable separately. In case the cement content in design mix is more than 1.10 times of the specified minimum cement content, the contractor shall have discretion to either re-design the mix or bear the cost of extra cement. 5.33.1 All works upto plinth level Concrete of M25 grade with minimum cement content of 330 kg /cum
Suspended floors, roofs, landings, balconies and access platform
Edges of slabs and breaks in floors and walls Under 20 cm wide
Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundation and plinth in: Cement mortar 1:4 (1 cement : 4 coarse sand)
40 mm thick rubbed stone flooring over 20 mm (average) thick base of cement mortar 1:5 (1 cement : 5 coarse sand) with joints 3 mm thick, side buttered with cement mortar 1:2 (1 cement : 2 stone dust) admixed with pigment to match the shade of stone and pointing with same mortar. Red sand stone
12 mm cement plaster finished with a floating coat of neat cement of mix : 1:4 (1 cement: 4 fine sand)
Neat cement punning.
Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in - charge. Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix)
Dismantling stone slab flooring laid in cement mortar including stacking of serviceable material and disposal of unserviceable material within 50 metres lead.
Disposal of building rubbish / malba / similar unserviceable, dismantled or waste materials by mechanical means, including loading, transporting, unloading to approved municipal dumping ground or as approved by Engineer-in-charge, beyond 50 m initial lead, for all leads including all lifts involved.
Taking out existing kerb stones of all types from footpath/ central verge, including removal of mortar etc., disposal of unserviceable material to the dumping ground, for which payment shall be made separately and stacking of serviceable material within 50 metre lead as per direction of Engineer-in-Charge.
Taking out existing CC interlocking paver blocks from footpath/ central verge, including removal of rubbish etc., disposal of unserviceable material to the dumping ground, for which payment shall be made separately and stacking of serviceable material within 50 metre lead as per direction of Engineer-in-Charge.
Laying at or near ground level old kerb stones of all types in position to the required line, level and curvature, jointed with cement mortar 1:3 (1 cement : 3 coarse sand), including making joints with or without grooves (thickness of joints, except at sharp curve, shall not be more than 5 mm), including making drainage opening wherever required etc. complete as per direction of Engineer-in-charge. (Length of finished kerb edging shall be measured for payment). (Old kerb stones shall be supplied by the department free of cost)
40 mm thick rubbed old red sand stone flooring over 20 mm (average) thick base of cement mortar 1:5 (1 cement : 5 coarse sand) with joints 3 mm thick, side buttered with cement mortar 1:2 (1 cement : 2 stone dust) admixed with pigment to match the shade of stone and pointing with same mortar.(Old red sand stone for flooring to provided by department free of cost)
Difference due to GST Factor @ 0.973
Add @ 3% Cost index
Please Enable Macros to View BoQ information
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.59 MB
BOQ_377682.xls
BOQ • 0.40 MB
Download all tender documents and submit your bid