| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹18.2 LAccepted-AOC NA | ₹18.2 L | L1 | Accepted-AOC L1 |
| 2 | L2₹18.3 L+₹4,387.32 (0.24%)Rejected-Finance | ₹18.3 L+₹4,387.32 (0.24%) | L2 | Rejected-Finance Financial bid not Qualified |
Tender Value
₹21.7 L
EMD Value
₹44,000
Closing Date
24 Mar 2026, 12:00 pmClosed
EE RED
VIKASH BHAWAN SULTANPUR
Construction of a boundary wall for the upper primary schooi in Ramnagar,Block PP Kamaicha
2026_REDUP_1127295_1
2991/RED/Tender File Date26/02/2026
Open Tender
Civil Works - Buildings
Percentage
120 days
Sulltanpur
Please refer Tender documents.
2 documents required · 2 mandatory
₹854
₹44,000
1 Jun 2026
19 Mar 2026
24 Mar 2026
19 Mar 2026
24 Mar 2026
19 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Boundary Wall | |||||
| 1.01 | E/W in Excavation in foundations in ordinary soil including dressing of sides and rammings of bottom. | - | Cum. | - | - |
| 1.02 | Providing and laying PCC 1:4:8 (1 cement : 4 fine sand : Brick ballast 40 mm. nominal size) in foundation i/c supply of all materials. Labour and T&P etc. | - | Cum. | - | - |
| 1.03 | Class-150 brick work in 1 : 6 cement and C. sand mortar in the Foundation including necessary cutting and moulding of bricks as required and also including supply of all materials, labour and T & P etc. required for proper completion of the work. | - | Cum. | - | - |
| 1.04 | R.C.C. work in Foundation with cement approved coarse sand and 20 mm gauge approved stone grit in the proportion of 1:1 1/2:3 i/c supply of reinforcement and its binding but including its fixing and binding the same with 24 B.W.G.G.I. binding wire and including necessary centering and shuttering etc. and also i/c supply of all materials, labour and T & P etc. | - | Cum. | - | - |
| 1.05 | Providing and laying RCC 1:1 1/2:3 (1 cement : 1 1/2 C. sand :3 Stone grit 20 mm. size) in Plinth bend, Top bend i/c supply of all materials. Labour and T&P etc. | - | Cum. | - | - |
| 1.06 | Centering and Shuttering i/c strutting, propping etc. and removal of form work for Foundation, Columns, Slab etc. | - | Sqm. | - | - |
| 1.07 | Mild steel or iron in plain work shch as reinforced concrete work i/c cutting , bending. | - | Kg. | - | - |
| 1.08 | Class-150 brick work in 1 : 4 cement and C. sand mortar in the super-structure One brick thick wall i/c supply of all materials, labour and T & P etc. required for proper completion of the work. | - | Cum. | - | - |
| 1.09 | 12mm. Thick plaster with 1:4 cement and C. sand mortar including supply of all materials, labour and T&P etc. required for proper completion of the work. | - | Sqm. | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.84 MB
SBD2.pdf
Tender Documents • 6.80 MB
BOQ_2102489.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .